Resetting Performance Evaluation of an Automated Line with Short Setup Time
… has been to look at the possible savings in setup times to reach higher productivity and thus higher capacity. The savings suggested should also decrease the variation of the setups to get a stable setup time. The combined effect of implementing organisational, method, and technical …
-
A method for setup time reduction in high precision machine cells
… aspect of production, machine changeover, or setup time. Setup time is defined as the elapsed time between producing the last part from the most recent lot to the first part of an incoming lot. The research had four objectives. First, an existing method to reduce machine changeover time was …
-
Operation-Level Sequence- Dependent Setup Time Reduction In Dynamic Cellular Manufacturing Systems
… when there are significant sequence dependent setup times and costs involved, cell formation (CF) problem should consider minimizing the sequence-dependent setup times in order to minimize the production cost. Setup time reduction in CMS has gained little to modest attention in the literature. …
-
Setup Time Reduction of Injection Moulding Machines at the Automotive Supplier Plasman
… to increase productivity and minimised stop time in the process. This project has analysed the setup process time to identify possible improvements to decrease the setup time to achieve higher productivity, lower cost, or increased capacity. The other purpose of this project is to set new …
-
Lean Manufacturing: Setup Time Reduction in Secondary Wood Manufacturing Facilities in North America
… study is to investigate the success of set-up time reduction efforts (one of the steps needed to achieve 'one-piece flow') in secondary wood products manufacturing facilities on four woodworking machines (moulder, shaper, table saw, and band saw) based on firm size. The first objective of this …
-
Implementing material and information flow improvements and setup time reduction in automotive gear machining
… areas with buffers between each. Variable setup times, complex part flow paths, and unpredictable equipment downtime have complicated gear production since its inception in 1990. Scheduling and material flow related issues were a large source of the relativity poor performance in gears …
-
Development and implementation of setup time reduction strategies for a 700-ton Danley progressive die press
Setup time reduction is one of the principle forces enabling lean manufacturing. This thesis documents the formulation and reduction to practice of two stages of a setup time reduction strategy for a 700-ton Danley progressive die press. Common methodologies of setup time reduction were presented …
-
A Neural Network Guided Genetic Algorithm for Flexible Flow Shop Scheduling Problem with Sequence Dependent Setup Time
… problem (FFSP) with sequence-dependent setup time. Numerical examples show that ANN-guided GA outperforms the pure GA in solving several large size FFSP problems.
-
Application of the SMED methodology in the injection machine in the company Avanplast S.A.C. to reduce setup time
Es conocido que las empresas siempre buscan formas de aumentar su productividad principalmente eliminando actividades que no agregan valor, esto no es diferente para las empresas dedicadas al rubro de productos plásticos, que suelen manejar un amplio catálogo de productos. La empresa Avanplast …
-
Multi-Objective Genetic Algorithm for an Integrated Inspection Allocation and Flow Shop Scheduling with Sequence Dependent Setup Time
… the scheduling system has significantly impacts time, quality, productivity, flexibility, and total cost. Improving these factors can easily increase the customer satisfaction. Multi-objective flow-shop scheduling with sequence-dependent setup time is considered as an NP-hard problem …
-
Analysis of setup time reductions at NADEP, North Island, utilizing the SMED approach (Single-Minute-Exchange-of-Die)
This thesis is an analysis of setup time considerations currently employed by the Power Plant Facility at the Naval Aviation Depot, North Island. The system is analyzed within a production context, citing present procedures that adversely affect lead time. To reduce lead time variability, reduction …
-
Setup reduction in printed circuit board assembly
Setup time of components in a printed circuit board (PCB) assembly machine consumes a large portion of the total production time in any PCB manufacturing system. The assembly sequence for printed circuit boards has been proved to effect the number of component switches to a great extent. This work …
-
A Dynamic Power Management Schema for Multi-Tier Data Centers
… servers under specific conditions such as setup time and identifies optimal number of servers. Moreover, their potential to greatly increase energy efficiency in data centers. We use a dynamic power management policy based on a mathematical model. Our new methodology is based on the optimal …
-
Reducing Variation in Pre-Incision Preparation for Robotic Surgery: A Nurse-Led Quality Improvement Initiative
… in northern California resulted in inconsistent setup times, contributing to OR inefficiency and increased staff workload. Context: The microsystem is an OR at a medical center in northern California. Primary participants are circulating nurses and scrub technicians assigned to robotic minimally …
-
A simulation study of the effects of applying JIT manufacturing techniques in a job shop environment with Kanban-based production control : a thesis presented in partial fulfilment of the requirements for the degree of Doctor of Philosophy in Production Technology at Massey University, Palmerston North, New Zealand
Just-in-Time (JIT) manufacturing has long been considered effective for improving the performance of job shop manufacturing. For application in a job shop environment, the most often suggested JIT techniques include: cellular manufacturing, processing and transporting parts one at a time (i.e. …
-
Phase Locked Loop (PLL) based Clock and Data Recovery Circuits (CDR) using Calibrated Delay Flip Flop
… of the three important timing parameters: setup time, hold time, and clock-to-output delay. These timing parameters play a vital role in designing a system at the transistor level. This thesis paper explains the impact of metastablity on the clock and data recovery (CDR) system and the …
-
A Simulation and Evaluation Study of the Economic Production Quantity Lot Size and Kanban for a Single Line, Multi-Product Production System Under Various Setup Times
… which generally lower costs associated with long setup times but due to larger inventories raise costs. Kanban systems on the other hand, manufacture only the necessary quantity of products, at the necessary time, and at the necessary place resulting in reduced work-in-process (WIP) inventory …
-
The mechanics and control of flexible asymmetric spinning
… internal rollers, thereby removing the setup time and cost associated with producing the dedicated mandrel. However, if FAS could also be automated, the setup time and cost could be reduced further. This thesis focuses on three elements which need to be in place for the automation of …
-
Investigation of optimization methods used for reconfiguration of the naval electric ship power system
… in finding the best solution, and amount of setup time needed The method used depends heavily on the degree that the problem is constrained and the solution requirements. The direct search method is completely accurate and requires little setup time, but its slow speed motivates the search …
-
Digitalisering och ställtidsreducering med implementering av MOST (Mobile Operator Supporting Tools)
… of the production channel DR02 and reduce the setup time in the channel. The current problem with the setup times is that they vary greatly depending on the competence that the operator possesses. Setup time is the time it takes to adjust various parameters and change various components in a …