Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 1 of 1 for “"Signal-conditioned prompting"”.
-
Multi-dimensional readiness signals for structured and LLM-assisted requirements inspection
… Prioritised Requirements Inspection through Signal Metrics (PRISM), computes three collection-level readiness metrics (structural centrality, linguistic specificity, and volatility exposure), and combines them through Pareto dominance-based structuring. Rather than collapsing these orthogonal …