Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 7 of 7 for “"Site C dam"”.
-
Power relations : environment, emotion, and violence in the Site C Dam approval process
The Site C hydroelectric dam on the Peace River in northeastern British Columbia, though purportedly a source of green power, is controversial because it would flood 5660 hectares (approximately 14,000 acres) of wilderness, farmland, and First Nations’ treaty territory. This dissertation is both an …
-
Environmentalism in an age of reconciliation: exploring a new context of indigenous and environmental NGO relationships
… peoples working collaboratively on the Site C Dam campaign in the Peace River region of Treaty 8 in northeast BC, and the Pacific Northwest liquid natural gas (LNG) terminal project in the Skeena River watershed region in the traditional territories of the Tsimshian, Gitxsan, and …
-
Hydro dams and environmental justice for Indigenous people. a comparison of environmental decision-making in Canada and Brazil
… on decision-making about large hydropower dams, particularly the process and outcomes of impact assessment, involving state, corporations, and local Indigenous communities. The objective of the study is to investigate whether state-led impact assessment, as one tool of regulatory …
-
Shoreline erosion and related observations on the construction headpond at Site C, Fort St. John, BC
The Site C Clean Energy Project is a new dam and hydroelectric generating station that is currently being constructed by BC Hydro on the Peace River in northeastern British Columbia, near the city of Fort St. John. The Site C dam will be approximately 60 m high and will create a reservoir …
-
An adaptive impact monitoring and management strategy for resource development projects
… model is demonstrated for the Peace River Site C dam proposed for northeastern British Columbia. Environmental impact assessment (EIA) has progressed considerably from its early biophysical orientation to a more comprehensive, interdisciplinary process concerned with the breadth of …
-
The Revelstoke Dam : a case study of the selection, licensing and implementation of a large scale hydroelectric project in British Columbia
… implementation of the Revelstoke Hydroelectric Dam under the Water Act and assesses to what extent the current EPRP selection and licensing procedure overcame the shortcomings of the Revelstoke experience. The methodological approach used is that of a post-development analysis. The Revelstoke …
-
Reconstructing Hydrologic Conditions and Metals Supplied by the Peace River to the Peace-Athabasca Delta
… Buffalo National Park, a UNESCO World Heritage Site, and is a Ramsar Wetland of International Importance. The construction of the WAC Bennett Dam (1967) and the Site C Dam (ongoing, 2024) on the Peace River, and expansion of the Alberta Oil Sands industry along the Athabasca River have raised …