Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 5 of 5 for “"Site information management"”

  1. Improvement of the Design phase by BIM to transform into a model-based AEC industry: A review of the relation between architects, contractors, and clients

    … needs. In the construction industry, Building Information Modeling, and despite the evolution of BIM technology, its adoption is limited. The Architectural, Engineering, and Construction (AEC) industry are still mainly using its traditional ways of working, which means using 2D drawings instead …

    chalmers Repository record for Improvement of the Design phase by BIM to transform into a model-based AEC industry: A review of the relation between architects, contractors, and clients (opens in a new tab)

  2. Understanding site offices challenges to communicate and exchange information using technology in UK : main contractor perspective

    … industry is to ensure that the correct information is available on site at the point of application. The global shift from paper-based documents and drawings to electronic-based files has tended to overload project teams with information. Currently, the work of site operatives still …

    salford

  3. Understanding site offices challenges to communicate and exchange information using technology in UK : main contractor perspective

    … industry is to ensure that the correct information is available on site at the point of application. The global shift from paper-based documents and drawings to electronic-based files has tended to overload project teams with information. Currently, the work of site operatives still …

    salford Repository record for Understanding site offices challenges to communicate and exchange information using technology in UK : main contractor perspective (opens in a new tab)

  4. The design and implementation of information systems for ESCO energy savings software

    … Tool reduces the creation of financial analysis information from 2 days to 1 day. The third software module is called the Report Generation Tool and it compiles a final auditor report from all the BETB study data in one day as compared to the traditional three. A secondary aim of this study was …

    nwu-za Repository record for The design and implementation of information systems for ESCO energy savings software (opens in a new tab)

  5. Towards Fully Integrated and Automated Construction Planning on Earthworks Projects

    … adopted to enable a smart construction site that integrates sensory information and algorithms to improve the performance of construction operations from various perspectives including cost, schedule, risk, safety and so on. Imaging sensors and location sensors are increasingly applied …

    alberta Repository record for Towards Fully Integrated and Automated Construction Planning on Earthworks Projects (opens in a new tab)