Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 19 of 19 for “"Statement of work"”

  1. The ORINCON Contract: a case study of service contracting

    … for services within the U.S. Government is full of difficult challenges that face the Contracting Officer on a daily basis. Many problems that develop during contract performance can be avoided through proper planning in the initial stages of the contract cycle. This thesis assesses a Marine …

    nps Repository record for The ORINCON Contract: a case study of service contracting (opens in a new tab)

  2. An analysis of service contracts and their administration

    … service contracting to alleviate the problems of personnel ceilings drawdowns and tight budgetary controls. Due to poor definition of the statement of work and a general misunderstanding of OMB Circular A-76 and a liberal interpretation of the Service Contract Act by the Department of Labor, …

    nps Repository record for An analysis of service contracts and their administration (opens in a new tab)

  3. Telecommunication System for Bachelor Officers Quarters: Cost-Effectiveness and Lease / Purchase Analysis

    The purpose of this thesis is to perform a cost-effectiveness analysis on proposals, submitted by vendors, for a telecommunication system. This thesis will be used as a guide in the decision-making process of choosing the most cost-effective system for the Bachelor Officers Quarters of the Naval …

    nps Repository record for Telecommunication System for Bachelor Officers Quarters: Cost-Effectiveness and Lease / Purchase Analysis (opens in a new tab)

  4. An evaluation of the acquisition streamlining methods at the Fleet and Industrial Supply Center Oakland

    The purpose of this thesis is to identify and discuss the viable methods associated with streamlining the acquisition process at Fleet and Industrial Supply Center (FISC) Oakland. Findings were that the implementation of Competition in Contracting Act (CICA) and the Acquisition Streamlining …

    nps Repository record for An evaluation of the acquisition streamlining methods at the Fleet and Industrial Supply Center Oakland (opens in a new tab)

  5. The administration of service contracts.

    During the Carter Administration the Office of Management and Budget Circular A-7 6 was brought back as an important program to reduce Government spending. This emphasis increased the number of service contracts within the Department of the Navy. This thesis looks at the administration of …

    nps Repository record for The administration of service contracts. (opens in a new tab)

  6. Baseline assessment of information technology contracts funded by Commander, Naval Surface Forces

    … were described, assessed, and evaluated in terms of their backgrounds, mission needs, performance, technical requirements, functionality, and contractual terms. One conclusion was that the contractual statement of work does not measure the performance of the system; rather, it is designed to …

    nps Repository record for Baseline assessment of information technology contracts funded by Commander, Naval Surface Forces (opens in a new tab)

  7. An evaluation of factors that influence service contract quality.

    … However, experience and the explosive growth of the services industry has shown that opportunities for simultaneous quality improvement must be undertaken. Today, both the Government and contractors are facing growing competitive and regulatory pressures to deliver higher quality services. In …

    nps Repository record for An evaluation of factors that influence service contract quality. (opens in a new tab)

  8. Contract Administration of Indefinite Delivery Type Contracts (IDTCS) by Contracting Officer's Technical Representatives (COTRS)

    Contracting Officer's Technical Representatives (COTRs) are assigned by the contracting officer to provide technical directionclarification and monitor Indefinite Delivery Type Contact (IDTC) performance at the location where the contractor performs services. This type of service contract …

    nps Repository record for Contract Administration of Indefinite Delivery Type Contracts (IDTCS) by Contracting Officer's Technical Representatives (COTRS) (opens in a new tab)

  9. Analyzing cost and schedule growth in public works projects

    The final cost of a Public Works project can directly affect the number of projects that can be accomplished during a fiscal year. Many of the factors that determine the final cost of a project are not under the control of the Project Engineer. For example, there is the Contractor's productivity …

    unlv Repository record for Analyzing cost and schedule growth in public works projects (opens in a new tab)

  10. Performance work statement for air terminal services.

    … embodied in OMB circular A-76. The formulation of a Performance Work Statement (PWS) is a critical part of the A-76. The formulation of a Performance Work Statement (PWS) is a critical part of the A-76 study process and becomes the key to success in specifying service requirements. This research …

    nps Repository record for Performance work statement for air terminal services. (opens in a new tab)

  11. Task Optimization and Workforce Scheduling

    … for an aircraft manufacturer. The production of an aircraft goes through a series of multiple workstations, each consisting of a large number of interactive tasks and a limited number of working zones. The duration of each task varies from operator to operator, because most operations are …

    waterloo Repository record for Task Optimization and Workforce Scheduling (opens in a new tab)

  12. Excerpt from the Dakopeta Project

    … that are further gone into in the project’s Statement of Work on the following pages. What the whole project attempts to achieve, through the usage of fantasy and travel writing tropes, is to create an unreal place that lays over the one we inhabit, a place that shares the geography of this …

    washington Repository record for Excerpt from the Dakopeta Project (opens in a new tab)

  13. O serviço social na previdência social: a afirmação do seu espaço na materialização dos direitos

    The work of the professional of social worker in social security policy, it is seen wrapped in an adverse situation to consolidate the ethical-political project work, marked by the materialization of the neoliberal policy essentially promotes the reduction of social rights historically achieved by …

    brazil-ufrn Repository record for O serviço social na previdência social: a afirmação do seu espaço na materialização dos direitos (opens in a new tab)

  14. Lessons Learned From the Incorporation and Testing of the AN/APG-68 Radar on the United States Naval Test Pilot School Airborne Systems Training and Research Support Aircraft (ASTARS)

    <p>In August 1994, a Statement of Work (SOW) was issued for the design, installation, and integration of Government Furnished Equipment (GFE) and Commercial Off The Shelf (COTS) technology on a U.S. Naval Test Pilot School (USNTPS) aircraft. The program was known as the Airborne Systems Training …

    ut-knoxville Repository record for Lessons Learned From the Incorporation and Testing of the AN/APG-68 Radar on the United States Naval Test Pilot School Airborne Systems Training and Research Support Aircraft (ASTARS) (opens in a new tab)

  15. Rozpočet objektu a informační modelování staveb (BIM)

    Práce se zabývá tvorbou rozpočtu pozemních staveb klasickým způsobem pomocí cenových soustav, automatizací tvorby rozpočtu v BIM modelu a návrhem vhodné knihovny pro tyto účely. Teoretická část práce se věnuje pojmům a zvyklostem používaných při sestavování rozpočtu, dále je zde představen BIM a …

    cz-tech Repository record for Rozpočet objektu a informační modelování staveb (BIM) (opens in a new tab)

  16. Cost Analysis for a Dedicated Search and Rescue Capability for Commander Strike Fighter Wing U.S. Pacific Fleet

    … SUMMARY Lemoore is a Master Jet Base, but is one of the few on the West Coast without an in-house, dedicated Search and Rescue (SAR) capability. The lack of SAR at Lemoore is a growing concern due to the increase in the number of squadrons at Lemoore, the new Lemoore Military Operating Airspace …

    nps Repository record for Cost Analysis for a Dedicated Search and Rescue Capability for Commander Strike Fighter Wing U.S. Pacific Fleet (opens in a new tab)

  17. Active resource scheduling with equivalent tasks, unary demands and hierarchical structure capacity constraints

    … investigated solution approaches for the problem of scheduling of instructors (ISP) in the executive development programs offered by the Institute of Productivity through Quality at the College of Business Administration, University of Tennessee, Knoxville. There has been two principal thrusts in …

    utk-theses Repository record for Active resource scheduling with equivalent tasks, unary demands and hierarchical structure capacity constraints (opens in a new tab)

  18. Sistema informático en ambiente web para la administración de proyectos, con módulo geográfico para la Fundación Salvadoreña para el Desarrollo Económico y Social, FUSADES.

    … la información. Fusadesis a private and non-profit organization in El Salvador dedicated to the development of social projects in order to pursuit the common good among Salvadoran people. It is important to emphasize that, there is a program called “Strengthening and Social Action ( Fortas, in …

    u-elsalvador Repository record for Sistema informático en ambiente web para la administración de proyectos, con módulo geográfico para la Fundación Salvadoreña para el Desarrollo Económico y Social, FUSADES. (opens in a new tab)

  19. Integrated Scheduling Material Requirements Planning Lean Process

    The objective of this project thesis was to consider a process, perform research, and analyze and document the results. The result is a recommended improved process for my current job, I have applied the principles I learned in the Loyola Marymount University (LMU) Graduate Level System Engineering …

    lmu Repository record for Integrated Scheduling Material Requirements Planning Lean Process (opens in a new tab)