Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 2 of 2 for “"Temporary Haul Road"”

  1. Temporary Haul Road Design and Earthmoving Operation Planning on Rough Grading Projects: Integrated Optimization Approach

    … industrial construction projects. The material haulage cost typically accounts for around 30% of the total cost of the entire rough grading project. To improve hauling efficiency and save earthmoving operation cost, the common practice is to empirically construct limited lengths of temporary …

    alberta Repository record for Temporary Haul Road Design and Earthmoving Operation Planning on Rough Grading Projects: Integrated Optimization Approach (opens in a new tab)

  2. Optimization of Temporary Haul Road Design and Earthmoving Job Planning based on Site Rough-grading Design

    … in remote areas especially in Northern Alberta. Haulage cost typically accounts for around 30% of the total cost of mass earthmoving projects. The temporary haul road network built in the earthmoving field is one major factor influencing haulage cost and production efficiency, which remains an …

    alberta Repository record for Optimization of Temporary Haul Road Design and Earthmoving Job Planning based on Site Rough-grading Design (opens in a new tab)