Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 5 of 5 for “"The BCU method"”.
-
IMPROVEMENTS OF BCU-BASED DIRECT METHODS AND APPLICATIONS OF BCU TO LINE SWITCHING DESIGNS FOR ENHANCING ONLINE TRANSIENT STABILITY OF LOOK-AHEAD POWER SYSTEMS
The structure, layout, and components of the electric power grid are changing rapidly leading to new components, models, and power system static and dynamic behaviors that existing power system analysis tools cannot accommodate. Since electricity is an integral part of our daily lives, it is …
-
Assessment of direct methods in power system transient stability analysis for on-line applications
The advent of synchronized phasor measurements allows the problem of real time prediction of instability and control to be considered. The use of direct methods for these on-line applications is assessed. The classical representation of a power system allows the use of two reference frames: Center …
-
Novel Bcu-Based Methods For Enhancing Power System Transient Stability
Transient stability is the ability of the power system to maintain synchronism when subjected to a severe transient disturbance such as transmission line shortage, loss of a transmission line, loss of generation, or loss of a large load. Loss of synchronism due to transient instability is very …
-
An improved technique to determine the controlling unstable equilibrium point in a power system
<p>In the past fifteen years considerable progress has been made in first swing power system transient stability assessment using the transient energy function (TEF) method;The accuracy of stability assessment provided by the TEF method depends on the determination of the controlling unstable …
-
Block Coordinate Update Method in Tensor Optimization
… minimization (BAM) has been popularly used since the 50's of last century. It partitions the variables into disjoint blocks and cyclically updates the blocks by minimizing the objective with respect to each block of variables, one at a time with all others fixed. A special case is the alternating …