Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 22 for “"Time Overrun"”

  1. Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects

    … project delay; which ultimately results in cost overruns. There are two strategies involved with selecting contractors: one is the lowest tender, the other is called best value.Selecting the lowest tender is straightforward; the latter strategy would involve scoring the contractors' tenders on …

    aston Repository record for Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects (opens in a new tab)

  2. Cost and time overruns on Mpumalanga Province infrastructure projects

    Cost and time overruns in construction projects are a common issue affecting project performance, and Mpumalanga is no exception. Completion of any project within the estimated cost of a project is a basic criterion for success of any project. The success of any project highly depends on adequate …

    nmmu Repository record for Cost and time overruns on Mpumalanga Province infrastructure projects (opens in a new tab)

  3. Ultra-Survivable Mixed-Criticality Systems based on Empiric Worst-Case Execution Time and Criticality Arithmetic

    … estimate a safe upper-bound of service execution time, which implies disruptive degra- dation in case of execution time overrun by any of the high or low-criticality services. This research introduces novel approaches for mixed-criticality systems by building dependable services from many less …

    herts-thes Repository record for Ultra-Survivable Mixed-Criticality Systems based on Empiric Worst-Case Execution Time and Criticality Arithmetic (opens in a new tab)

  4. An exploratory case study of risk and opportunity management on CRL1 Project, UK: Investigating the major causes of time and cost overrun, and poor quality of work and possible remedies.

    … they are always delivered ‘over budget, over time and under benefits over and over again’) had already struck Crossrail1 (CRL1) project and there were visible signs of this everywhere. Therefore, the primary objective of this study was to investigate the possible causes of cost and time …

    soton Repository record for An exploratory case study of risk and opportunity management on CRL1 Project, UK: Investigating the major causes of time and cost overrun, and poor quality of work and possible remedies. (opens in a new tab)

  5. Causes of Construction Delays for High Rise Buildings: a Quantitative Comparison between the USA and India

    … prone to construction delays. Delays can lead to time overrun, affect the total project duration and the total cost, and could result in litigation. Most construction schedules are deterministic and do not include the uncertainty and risk inherent in the diverse activities which constitute the …

    ndsu Repository record for Causes of Construction Delays for High Rise Buildings: a Quantitative Comparison between the USA and India (opens in a new tab)

  6. Construction material logistics management: the case of North-Central Nigeria

    … role in meeting the goals of cost, quality and time to completion of a construction project. Fundamentally, it is accepted that any inefficiency in the delivery of construction material could lead to a time overrun and thus, a rise in construction costs. Therefore addressing the operational …

    nmmu Repository record for Construction material logistics management: the case of North-Central Nigeria (opens in a new tab)

  7. Time and cost overruns on high-rise building construction in Bangladesh

    … projects in developing countries may suffer from time overruns, which are associated with cost overruns. This research project investigated both time and cost overruns on high-rise building projects in Dhaka, Bangladesh. Surprisingly, preliminary data analysis showed negligible cost overruns in …

    abertay Repository record for Time and cost overruns on high-rise building construction in Bangladesh (opens in a new tab)

  8. Use of IBM Collaborative Lifecycle Management Solution to Demonstrate Traceability for Small, Real-World Software Development Project

    … percent were challenged by extreme budget and/or time overrun. Since then different responses to the high rate of software project failures have been proposed. SEI’s CMMI, the ISO’s 9001:2000 for software development, and the IEEE’s JSTD-016 are some examples of such responses. Traceability is the …

    unf Repository record for Use of IBM Collaborative Lifecycle Management Solution to Demonstrate Traceability for Small, Real-World Software Development Project (opens in a new tab)

  9. Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects

    … of productivity and quality, cost and time overrun etc, the Malaysian Government proposedindustrialisation technology 40 years ago as a solution, more commonly referred to as IndustrialisedBuilding System (IBS). However, the level of implementation of IBS is still below government …

    salford Repository record for Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects (opens in a new tab)

  10. Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects

    … of productivity and quality, cost and time overrun etc, the Malaysian Government proposedindustrialisation technology 40 years ago as a solution, more commonly referred to as IndustrialisedBuilding System (IBS). However, the level of implementation of IBS is still below government …

    salford Repository record for Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects (opens in a new tab)

  11. The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the state of Qatar

    … tested were unit cost; percentage of cost overrun; speed of construction; percentage of time overrun; client's satisfaction with cost and time; client's overall satisfaction; client's rating on quality; aesthetic quality and technical quality. As this study is the first of its kind, …

    southwales Repository record for The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the state of Qatar (opens in a new tab)

  12. Sensemaking in a value based context for large scale complex engineered systems

    … system projects are subjected to creep in time and cost due to the uncertainty and ambiguity of requirements during the design and development. In an organization structure, the cost and time overrun can occur at any level and iterate back and forth thus increasing the cost and time. To …

    iastate Repository record for Sensemaking in a value based context for large scale complex engineered systems (opens in a new tab)

  13. Performance prediction model for Swedish construction projects

    … issues that can result in unexpected costs or time overrun. Therefore, a need is highlighted by the industry as well as in the literature, to develop predictive models, that can aid in decision-making and guidance for corrective action throughout the development and implementation of …

    chalmers Repository record for Performance prediction model for Swedish construction projects (opens in a new tab)

  14. A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa

    On-time completion and conformity with assigned cost of every project are the most important factors in the success of project plans. Cost overruns and time overrun (delays) have been critical problems of many projects around the world in general and in South Africa in particular. The main …

    dut Repository record for A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa (opens in a new tab)

  15. QUANTITATIVE ANALYSIS OF THE IMPACT OF CRAFT LABOR AVAILABILITY ON CONSTRUCTION PROJECT PERFORMANCE

    … underwent significant higher growth in cost overrun, time overrun, safety incident and also lower productivity compared to projects that did not. Further analysis on two databases returned the following models: 1) a Poisson regression model that demonstrates a positive exponential …

    uky-thes Repository record for QUANTITATIVE ANALYSIS OF THE IMPACT OF CRAFT LABOR AVAILABILITY ON CONSTRUCTION PROJECT PERFORMANCE (opens in a new tab)

  16. The Impact of Design Documents on Time and Cost Overruns of Public Construction Projects in Ethiopia and Mitigation with BIM Implementation – a Case Study

    Timely completion of public building projects within the allocated budget and in the required quality is paramount for effectively using a facility to provide the intended public services properly. Typically, project owners plan to build public building projects following a critical demand from …

    ttu Repository record for The Impact of Design Documents on Time and Cost Overruns of Public Construction Projects in Ethiopia and Mitigation with BIM Implementation – a Case Study (opens in a new tab)

  17. STUDY OF ELECTRIC VEHICLE CHARGING STRATEGIES AND ENERGY MANAGEMENT IN POWER DISTRIBUTION SYSTEMS

    … on the existing utility programs, such as the Time of Use and Direct Load Control, and optimization techniques. The charging scheduling shifts the PEV charging load to the grid off-peak period to flatten the load profile. Therefore, it mitigates the PEV charging resulted overloading, …

    mtu Repository record for STUDY OF ELECTRIC VEHICLE CHARGING STRATEGIES AND ENERGY MANAGEMENT IN POWER DISTRIBUTION SYSTEMS (opens in a new tab)

Page 1 of 2