Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 20 of 22 for “"Time Overrun"”
-
Factors affecting time overrun in commercial construction : a Malaysian perspective
… importance of the significant factors affecting time overrun in Malaysia commerical construction.
-
Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects
… project delay; which ultimately results in cost overruns. There are two strategies involved with selecting contractors: one is the lowest tender, the other is called best value.Selecting the lowest tender is straightforward; the latter strategy would involve scoring the contractors' tenders on …
-
Cost and time overruns on Mpumalanga Province infrastructure projects
Cost and time overruns in construction projects are a common issue affecting project performance, and Mpumalanga is no exception. Completion of any project within the estimated cost of a project is a basic criterion for success of any project. The success of any project highly depends on adequate …
-
Ultra-Survivable Mixed-Criticality Systems based on Empiric Worst-Case Execution Time and Criticality Arithmetic
… estimate a safe upper-bound of service execution time, which implies disruptive degra- dation in case of execution time overrun by any of the high or low-criticality services. This research introduces novel approaches for mixed-criticality systems by building dependable services from many less …
-
An exploratory case study of risk and opportunity management on CRL1 Project, UK: Investigating the major causes of time and cost overrun, and poor quality of work and possible remedies.
… they are always delivered ‘over budget, over time and under benefits over and over again’) had already struck Crossrail1 (CRL1) project and there were visible signs of this everywhere. Therefore, the primary objective of this study was to investigate the possible causes of cost and time …
-
Causes of Construction Delays for High Rise Buildings: a Quantitative Comparison between the USA and India
… prone to construction delays. Delays can lead to time overrun, affect the total project duration and the total cost, and could result in litigation. Most construction schedules are deterministic and do not include the uncertainty and risk inherent in the diverse activities which constitute the …
-
Construction material logistics management: the case of North-Central Nigeria
… role in meeting the goals of cost, quality and time to completion of a construction project. Fundamentally, it is accepted that any inefficiency in the delivery of construction material could lead to a time overrun and thus, a rise in construction costs. Therefore addressing the operational …
-
Time and cost overruns on high-rise building construction in Bangladesh
… projects in developing countries may suffer from time overruns, which are associated with cost overruns. This research project investigated both time and cost overruns on high-rise building projects in Dhaka, Bangladesh. Surprisingly, preliminary data analysis showed negligible cost overruns in …
-
Use of IBM Collaborative Lifecycle Management Solution to Demonstrate Traceability for Small, Real-World Software Development Project
… percent were challenged by extreme budget and/or time overrun. Since then different responses to the high rate of software project failures have been proposed. SEI’s CMMI, the ISO’s 9001:2000 for software development, and the IEEE’s JSTD-016 are some examples of such responses. Traceability is the …
-
Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects
… of productivity and quality, cost and time overrun etc, the Malaysian Government proposedindustrialisation technology 40 years ago as a solution, more commonly referred to as IndustrialisedBuilding System (IBS). However, the level of implementation of IBS is still below government …
-
Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects
… of productivity and quality, cost and time overrun etc, the Malaysian Government proposedindustrialisation technology 40 years ago as a solution, more commonly referred to as IndustrialisedBuilding System (IBS). However, the level of implementation of IBS is still below government …
-
The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the state of Qatar
… tested were unit cost; percentage of cost overrun; speed of construction; percentage of time overrun; client's satisfaction with cost and time; client's overall satisfaction; client's rating on quality; aesthetic quality and technical quality. As this study is the first of its kind, …
-
Sensemaking in a value based context for large scale complex engineered systems
… system projects are subjected to creep in time and cost due to the uncertainty and ambiguity of requirements during the design and development. In an organization structure, the cost and time overrun can occur at any level and iterate back and forth thus increasing the cost and time. To …
-
Performance prediction model for Swedish construction projects
… issues that can result in unexpected costs or time overrun. Therefore, a need is highlighted by the industry as well as in the literature, to develop predictive models, that can aid in decision-making and guidance for corrective action throughout the development and implementation of …
-
A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa
On-time completion and conformity with assigned cost of every project are the most important factors in the success of project plans. Cost overruns and time overrun (delays) have been critical problems of many projects around the world in general and in South Africa in particular. The main …
-
QUANTITATIVE ANALYSIS OF THE IMPACT OF CRAFT LABOR AVAILABILITY ON CONSTRUCTION PROJECT PERFORMANCE
… underwent significant higher growth in cost overrun, time overrun, safety incident and also lower productivity compared to projects that did not. Further analysis on two databases returned the following models: 1) a Poisson regression model that demonstrates a positive exponential …
-
The Impact of Design Documents on Time and Cost Overruns of Public Construction Projects in Ethiopia and Mitigation with BIM Implementation – a Case Study
Timely completion of public building projects within the allocated budget and in the required quality is paramount for effectively using a facility to provide the intended public services properly. Typically, project owners plan to build public building projects following a critical demand from …
-
STUDY OF ELECTRIC VEHICLE CHARGING STRATEGIES AND ENERGY MANAGEMENT IN POWER DISTRIBUTION SYSTEMS
… on the existing utility programs, such as the Time of Use and Direct Load Control, and optimization techniques. The charging scheduling shifts the PEV charging load to the grid off-peak period to flatten the load profile. Therefore, it mitigates the PEV charging resulted overloading, …
-
Influence of emulsifiers and fat type on the shear-induced destabilisation of partially crystalline oil-in-water emulsions and corresponding aeration properties : a thesis presented in partial fulfilment of the requirements for the degree of Master of Food Technology at Massey University, Manawatū, New Zealand
… microstructure and whipping properties (whipping time, overrun, foam firmness). A key method used throughout this research to determine mechanisms was the ‘stop and return’ DSC method. This method was able to identify small changes to the formulation which impacted polymorphic transition and …
Page 1 of 2