Results

Showing 1 to 15 of 15 for “"Time-Cost Trade-off"”.

  1. An Evolutionary Stochastic Discrete Time-Cost Trade-Off Method for Repetitive and Non- Repetitive Construction Projects

    … for solving the scheduling problem of discrete Time-Cost Trade-off (TCT) in an uncertain context. The method determines the elite execution mode for each project activity to optimize for minimization of the overall project’s cost and/or duration while satisfying a specified Joint Confidence …

    concordia Download PDF for An Evolutionary Stochastic Discrete Time-Cost Trade-Off Method for Repetitive and Non- Repetitive Construction Projects (opens in a new tab)

  2. Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment

    The Time-Cost Trade-Off (TCT) problem is essential to project scheduling. The risk in TCT is significant because of the uncertainty associated with the estimation of project cost and duration. TCT problem in Linear Repetitive Projects (LRP) is a more complicated issue because of their unique …

    alabama Repository record for Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment (opens in a new tab)

  3. Optimization-Based Architecture for Managing Complex Integrated Product Development Projects

    … became fully understood. Thus, reducing product time-to-market became an essential requirement for continuous competition. Integrated Product Development (IPD) is a holistic approach that helps to overcome problems that arise in a complex product development project. IPD emphasis is to provide a …

    odu Repository record for Optimization-Based Architecture for Managing Complex Integrated Product Development Projects (opens in a new tab)

  4. GRCPSP Robusto basado en Producción para Proyectos de Edificación y Construcción

    … intervinientes en el proyecto, reformulando los costes asociados a los mismos y su repercusión sobre el nuevo modelo propuesto, permitiendo la aplicación de algoritmos de optimización TCTP (Time Cost Trade-Off Problem) que hasta ahora era inviable. Para finalizar se incorpora la borrosidad a los …

    upv Repository record for GRCPSP Robusto basado en Producción para Proyectos de Edificación y Construcción (opens in a new tab)

  5. Project Schedule Compression Considering Multi-objective Decision Environment

    … reduce schedule crashing to the traditional time-cost trade-off analysis, where only cost is considered. In this research the schedule compression process is modeled as a multi-attributed decision making problem in which different factors contribute to priority setting for activity crashing. …

    concordia Download PDF for Project Schedule Compression Considering Multi-objective Decision Environment (opens in a new tab)

  6. Investigation, Analysis, and Modeling of Longwall Face-to-Face Transfers

    … The purpose is to reduce overall transfer time and the variation of transfer times among operations within the U. S. longwall industry. The research includes: (1) investigation of existing longwall transfers to determine standard and variant procedures; (2) development of comprehensive …

    vt Repository record for Investigation, Analysis, and Modeling of Longwall Face-to-Face Transfers (opens in a new tab)

  7. Time-Cost Optimization of Large-Scale Construction Projects Using Constraint Programming

    Optimization of time and cost in construction projects has been subject to extensive research since the development of the Critical Path Method (CPM). Many researchers have investigated various versions of the well-known Time-Cost Trade-off (TCT) problem including linear, convex, concave, and also …

    waterloo Repository record for Time-Cost Optimization of Large-Scale Construction Projects Using Constraint Programming (opens in a new tab)

  8. A Decision Support System for Efficient Utilization of Overdesign as a Fast Tracking Technique in Modular Steel Pipe Racks

    … which will be directly translated to extra costs and increased materials wastage. Likewise, the assumptions made might not be conservative enough, necessitating rework. A review of the overdesign literature pointed to a lack of explicit research about overdesign as a schedule compression …

    calgary Repository record for A Decision Support System for Efficient Utilization of Overdesign as a Fast Tracking Technique in Modular Steel Pipe Racks (opens in a new tab)

  9. Managing New Product Development Projects in a Competitive Market

    … and/or enjoy monopoly status for a period of time. Shortening the development time to market, however, typically requires higher development costs that may offset, or even outweigh, any anticipated first-mover advantages. The objective of this dissertation is to study the implications of …

    washington Repository record for Managing New Product Development Projects in a Competitive Market (opens in a new tab)

  10. EVOLVING CONSTRUCTION SCHEDULES UNDER RESOURCE CONSTRAINTS

    … complete solutions is maintained at any point of time; this is in contrast to the other traditional methods which build the complete solution piecewise. The GA identifies good portions of solutions present on different "individuals" in the population and combines them on to a new individual …

    nus Repository record for EVOLVING CONSTRUCTION SCHEDULES UNDER RESOURCE CONSTRAINTS (opens in a new tab) Download file for EVOLVING CONSTRUCTION SCHEDULES UNDER RESOURCE CONSTRAINTS (opens in a new tab)

  11. Simsite.net - a web-based construction management game

    … in the system, and the relationships involved in time-cost trade-off and productivity influences are explored throughout the game. The web site is comprised of three parts. The first part contains project documents and a reference library that allow the users to browse through the drawings, …

    ubc Repository record for Simsite.net - a web-based construction management game (opens in a new tab) Download PDF for Simsite.net - a web-based construction management game (opens in a new tab)

  12. On Managing Stochastic Decentralized Projects

    … as projects have become increasingly complex, costly, and strategically important (especially IT and product development projects). In this dissertation, we analyze a decentralized project that is composed of n serial stages with stochastic durations; the project is planned, organized, and …

    washington Repository record for On Managing Stochastic Decentralized Projects (opens in a new tab)

  13. Optimized Scheduling of Repetitive Construction Projects under Uncertainty

    … while allowing for optimized acceleration and time-cost trade-off analysis. The proposed methodology encompasses three integrated models; Optimized Scheduling and Buffering Model, Monitoring and Dynamic Rescheduling Model and Acceleration Model. The first model presents an optimization …

    concordia Download PDF for Optimized Scheduling of Repetitive Construction Projects under Uncertainty (opens in a new tab)

  14. Ανάπτυξη συστήματος υποστήριξης αποφάσεων για τον χρονοπρογραμματισμό έργων με χρήση μεταευρετικών και πολυσκοπικών αλγόριθμων

    … Chapter 4 focuses on the problem of the time/cost trade-off in a project whose activities can be performed with discrete time/cost combinations. The general form of the problem is resolved by the three Pareto metaheuristics algorithms, while algorithms for the three specific cases of the …

    greece Repository record for Ανάπτυξη συστήματος υποστήριξης αποφάσεων για τον χρονοπρογραμματισμό έργων με χρήση μεταευρετικών και πολυσκοπικών αλγόριθμων (opens in a new tab)

  15. A heuristic algorithm for the limited resource problem

    … CpM/pERT problem. Specifically, a time/cost trade off algorithm was developed to take advantage of scarce resources that remain unused when a "typical" heuristic scheduling algorithm is applied to this type problem. A typical heuristic scheduling algorithm considers only one …

    utk-theses Repository record for A heuristic algorithm for the limited resource problem (opens in a new tab)