Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 1 of 1 for “"Timing and critical-path analysis"”

  1. An Expandable Architecture for a Conferencing Digital Communications Switch

    … is dedicated to conferencing. The basic ideas and methods of circuit switching and packet switching are introduced. The conferencing function is described, and some resulting design considerations are discussed. The architecture of the switch is then presented. Circuit switching techniques are …

    ucf Repository record for An Expandable Architecture for a Conferencing Digital Communications Switch (opens in a new tab)