Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 24 for “"Total tardiness"”.
-
Heuristics for the family scheduling problems to minimize total tardiness
… is to implement methodologies to minimize total tardiness on single machine problems. However, the complexity of the proposed problem is NP-Hard. Seeking for optimal solutions for large problem sizes within a reasonable time is quite questionable. Therefore, this research aims to implement …
-
On merging sequencing and scheduling theory with genetic algorithms to solve stochastic job shops.
… constrained genetic algorithm to minimize total tardiness and to evaluate chromosomes using probability Gantt charting. The second was a stochastic constrained genetic algorithm to minimize total tardiness and to evaluate chromosomes using simulation. In these two algorithms, the fitness …
-
Genetic programming for manufacturing optimisation.
… were used for this purpose: the one-machine total tardiness problem, the cell-formation problem and the multiobjective process planning selection problem. The main contribution of this thesis is the introduction of novel genetic programming frameworks for the solution of these problems. In …
-
Optimization of Large-Scale Single Machine and Parallel Machine Scheduling
… machine scheduling is to minimize a combined total changeover, total earliness, and total tardiness cost, whereas the objective of the parallel machine scheduling is to minimize an objective function comprising the gaps between jobs before a critical time in a schedule, the total changeover …
-
Optimization Models and Algorithms for Spatial Scheduling
… problems having an objective of minimizing total tardiness, the models are shown to contain a core set of constraints that are common to most spatial scheduling problems. As a result, these constraints form the basis of the models given in this dissertation and many other spatial scheduling …
-
Logistic system design of an underground freight pipeline system
… two capsule control models that minimize total tardiness squared of cargo delivery and associated heuristic algorithms to solve large-scale problems. Two network design models are introduced that minimizes both operational and construction cost of UFP system. The UFP network design …
-
On sequencing ordered matrix flowshop problems
… minimum mean completion time of jobs and minimum total tardiness of late jobs. The relevance and importance of these criteria will be discussed in subsequent chapters.
-
Bi-criteria Scheduling Problems on Parallel Machines
… is developed for the primary criterion of total tardiness and the secondary criterion of total flow time. This algorithm is based on the solution of the underlying mathematical program and makes use of dominance relationship among the jobs and fixing of variables. Experimental results are …
-
Optimization for process planning and scheduling in parts manufacturing
… trade-off plans/schedule solution with minimum total tardiness for generated schedule, while total machining cost of plans is maintained at a lower level. Two optimization approaches are proposed to handle this integrated problem. In addition, this work also presents a new rescheduling approach …
-
Integrated Process Planning and Scheduling for a Complex Job Shop Using a Proxy Based Local Search
… planning decisions with the goal of reducing total tardiness. A new dispatching heuristic, OU-MW, is developed to generate feasible schedules for complex job shop scheduling problems with maximum wait time constraints. A regression based proxy approach, PBLS-R, and a neural network based proxy …
-
Energy-aware scheduling with day ahead electricity pricing
… non-preemptive single machine to minimize total tardiness and total energy cost; preemptive single machine to minimize total completion time and total energy cost; preemptive single machine with non-preemptive sequence-independent setup time to minimize total completion time and total …
-
A Study of Particle Swarm Optimization Trajectories for Real-Time Scheduling
… in this thesis uses a variation of the minimum total tardiness with cumulative penalties cost function, that can be extended to suit different system needs. The experimental results show that the scheduler is able to distribute tasks to meet the real-time deadlines over 1, 2, and 4 processors …
-
Comparison of Scheduling Algorithms for a Multi-Product Batch-Chemical Plant with a Generalized Serial Network
… production scheduling algorithms to minimize tardiness for a multi-product batch plant involving multiple processing stages with several out-of-phase parallel machines in each stage; and 2. compare the robustness and performance of these production schedules using a stochastic discrete event …
-
The permutation flowshop scheduling problem: analysis, solution procedures and problem extensions
… for the most common objectives, i.e. makespan, total completion time and due-date-based objectives (total tardiness, and total earliness and tardiness). 2. To analyse the influence of the processing times and due dates of the jobs on the PFSP. 3. To provide schedulers with faster and more …
-
SCHEDULING TO OPTIMIZE FUNCTIONS OF JOB TARDINESS: PROBLEM STRUCTURE AND ALGORITHMS.
… under two different measures of performance: total tardiness and weighted number of tardy jobs. A new solution approach is presented for the single-machine tardiness problem. This views the problem as one of determining an optimal partition of the job set into early and tardy subsets. The …
-
Some topics on deterministic scheduling problems
… tardy jobs as the primary criterion and with the total completion time and the total tardiness as the secondary criterion, respectively. Both problems are shown to be NP-hard. Then it focuses on bi-criteria scheduling problems involving the number of tardy jobs, the maximum weighted tardiness and …
-
Random Keys Genetic Algorithms Scheduling and Rescheduling Systems for Common Production Systems
… objective functions such as the Makespan and the Total Tardiness as well as non-regular objective functions such as the Total Earliness and Tardiness. To deal with the rescheduling problem, and using as a basis the same RKGA, a reactive Rescheduling system capable of repairing initial schedules …
-
Exact and Heuristic Hybrid Approaches for Scheduling and Clustering Problems
… classical scheduling problem: the Single Machine Total Tardiness Problem. The relevant aspect is that the designed algorithm has the best worst case complexity for the problem, that has been studied for several decades. Furthermore, such result is based on a new technique, called Branch and Merge, …
-
Single machine two-agent scheduling problems with tardiness objectives
In the last decade, study on two-agent scheduling has attracted lots of attention from many researchers due to its challenging complexity level and broad application in different areas. In this thesis, three two-agent scheduling problems are considered in which scheduling criteria of both agents …
-
Online optimization with lookahead for dynamic assignment and energy-smart scheduling in manufacturing.
… energy consumption often lead to increased tardiness, creating a trade-off between scheduling efficiency and sustainability goals. Despite these challenges, existing scheduling models struggle to effectively incorporate short-term order certainty and its variations while addressing key …
Page 1 of 2