Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 7 of 7 for “"Total weighted completion time"”

  1. IMPROVED PHOTOLITHOGRAPHY SCHEDULING IN SEMICONDUCTOR MANUFACTURING

    … flowshop. We seek separately to minimize total weighted completion time and maximize on-time delivery performance. Experimental results suggest that our mathematical- and heuristic-based solution approaches show promise for real world implementation as they can help to improve resource …

    clemson Repository record for IMPROVED PHOTOLITHOGRAPHY SCHEDULING IN SEMICONDUCTOR MANUFACTURING (opens in a new tab)

  2. Heuristics for batching jobs under weighted average completion time

    … combines jobs to run jointly, and each job's completion time is defined to be the completion time of the entire batch. For a batching problem, it is also assumed that when each batch is scheduled, it requires a setup time. One seeks to find a schedule that minimizes the total weighted …

    unlv Repository record for Heuristics for batching jobs under weighted average completion time (opens in a new tab)

  3. Order scheduling in dedicated and flexible machine environments

    … the order has been completed. Thus, the finish time of an order is the time when the last job of the order has been completed. Even though the idea is somewhat new that order scheduling measures the overall completion time of a set of jobs (i.e., an order requesting different product types) …

    njit Repository record for Order scheduling in dedicated and flexible machine environments (opens in a new tab)

  4. Approximation Algorithms for Capacitated k-Median and Scheduling with Resource and Precedence Constraints

    … the makespan of the schedule or the more general total weighted completion time. Jobs have precedence constraints between them. Each job also have a resource requirement and the total resource use of jobs running concurrently at any point in a feasible schedule should not exceed the global …

    chicago-thes Repository record for Approximation Algorithms for Capacitated k-Median and Scheduling with Resource and Precedence Constraints (opens in a new tab)

  5. Approximation Algorithms for Capacitated k-Median and Scheduling with Resource and Precedence Constraints

    … the makespan of the schedule or the more general total weighted completion time. Jobs have precedence constraints between them. Each job also have a resource requirement and the total resource use of jobs running concurrently at any point in a feasible schedule should not exceed the global …

    chicago Repository record for Approximation Algorithms for Capacitated k-Median and Scheduling with Resource and Precedence Constraints (opens in a new tab)

  6. Modeling and Analysis of Scheduling Problems Containing Renewable Energy Decisions

    … plants to reduce energy costs when faced with time-varying electricity prices. To efficiently utilize on-site renewable energy generation, production schedules and energy supply decisions need to be coordinated. As renewable energy resources like solar and wind energy typically fluctuate with …

    clemson Repository record for Modeling and Analysis of Scheduling Problems Containing Renewable Energy Decisions (opens in a new tab)

  7. Branch-and-price algorithms for parallel machine scheduling with machine usage costs

    … mathématiques basés sur la règle SWPT (shortest weighted processing time) sont introduits. Le problème est ensuite formulé comme un problème de partitionnement pour lequel un algorithme BaP est proposé avec une stratégie de branchement appropriée. Cette stratégie facilite le développement d'une …

    star-france Repository record for Branch-and-price algorithms for parallel machine scheduling with machine usage costs (opens in a new tab)