Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 240 for “"TxDOT"”

  1. Development of a decision-support tool for TxDOT delivery methods selection

    … decades. The Texas Department of Transportation (TxDOT) is not the exception, and the fact that TxDOT has available alternatives for delivering its projects lead to the need of a formal decision process. This work presents the existent approaches made by different owner entities to formalize the …

    texas Repository record for Development of a decision-support tool for TxDOT delivery methods selection (opens in a new tab)

  2. Development of a decision-making procedure for outsourcing engineering services in TxDOT

    … in the Texas Department of Transportation (TxDOT) and developing a rationalized procedure. TxDOT, the largest state DOT in terms of annual construction program,expends about 65% of its engineering on consultants. Staff from 18 of TxDOTs 25 districts were interviewed for this research, and …

    texas Repository record for Development of a decision-making procedure for outsourcing engineering services in TxDOT (opens in a new tab)

  3. Framework for compressed workweek implementation for TxDOT maintenance forces and flexible work arrangements for employees

    … funds, the Texas Department of Transportation (TxDOT) Austin District has sought to better utilize maintenance section employee resources by implementing a compressed workweek. The primary goal of this thesis is to establish a framework and methodology to study the effects of a compressed …

    texas Repository record for Framework for compressed workweek implementation for TxDOT maintenance forces and flexible work arrangements for employees (opens in a new tab)

  4. Experimental Testing and Behavior of TxDOT "Poor Boy Joint" Link Slab Detail Using Flush Panels

    … the “Poor Boy Joint” link slab detail used by TxDOT. This thesis involves the development of an experimental test setup capable of loading the “Poor Boy Joint” and assessing its performance. In service, this detail is susceptible to forming a single transverse crack that may result in …

    tamu Repository record for Experimental Testing and Behavior of TxDOT "Poor Boy Joint" Link Slab Detail Using Flush Panels (opens in a new tab)

  5. Before and after comparison of traditional five-day and four-day workweeks for TxDOT maintenance forces

    The Texas Department of Transportation (TxDOT) has sought to reduce expenditures by better utilizing their maintenance forces through a compressed workweek. The focus of this thesis is a before and after comparison of maintenance crews at TxDOT during a standard 5-day forty hour workweek and a …

    texas Repository record for Before and after comparison of traditional five-day and four-day workweeks for TxDOT maintenance forces (opens in a new tab)

  6. Concrete Mix Design for TxDOT CRCP Repair: Utilizing Rapid Set Cement (RSC) with Nano Calcium Carbonate

    Continuously reinforced concrete pavement (CRCP) is widely utilized for its durability and low maintenance requirements, making it a preferred choice for high-traffic roads. However, aging CRCP sections often require repair due to distress and deterioration. This research aims to propose an optimal …

    ttu Repository record for Concrete Mix Design for TxDOT CRCP Repair: Utilizing Rapid Set Cement (RSC) with Nano Calcium Carbonate (opens in a new tab)

  7. Experimental Testing and Behavior Of TxDOT "Poor-Boy" Link Slab Details for Multi-Span Bridge Decks

    … details for Texas Department of Transportation (TxDOT) standard bridges and modifications to those details. Several bridge specimens featuring link slabs were constructed and subjected to load to induce negative bending across the link slab. Two of these specimens followed existing TxDOT …

    tamu Repository record for Experimental Testing and Behavior Of TxDOT "Poor-Boy" Link Slab Details for Multi-Span Bridge Decks (opens in a new tab)

  8. Evaluation of the TxDOT Texas cone penetration test and foundation design method including correction factors, allowable total capacity, and resistance factors at serviceability limit state

    … regarding the predictive validity of the TxDOT TCP method for deep foundation design. The allowable predicted total capacity determined from the TCP foundation design charts could be considered to be reasonable based on a strength-based model, moderately over-conservative, to …

    ttu Repository record for Evaluation of the TxDOT Texas cone penetration test and foundation design method including correction factors, allowable total capacity, and resistance factors at serviceability limit state (opens in a new tab)

  9. Advance planning in highway project development processes : key variable identification & categorization

    … during the Texas Department of Transportation’s (TxDOT) right-of-way acquisition process, a succession of planning activities and legal constraints exists. Many of these restrictions set precedence in the sequence of activities that TxDOT must follow when undertaking its project development …

    texas Repository record for Advance planning in highway project development processes : key variable identification & categorization (opens in a new tab) Restricted access

  10. Pullout resistance of mechanically stabilized earth reinforcements embedded in coarse backfill and measured in a large scale test system

    … walls, the Texas Department of Transportation (TxDOT) initiated a research study to update these F* values to better suit TxDOT specified backfill materials which have superior performance characteristics in comparison to backfill materials on which the AASHTO guidelines have been based. As a …

    ttu Repository record for Pullout resistance of mechanically stabilized earth reinforcements embedded in coarse backfill and measured in a large scale test system (opens in a new tab)

  11. Construction and monitoring of an experimental highway pavement section for a long-term study on the effectiveness of cement as a subgrade stabilizer in fine-grained soils

    … by the Texas Department of Transportation (TxDOT) to make comparisons of the two stabilization methods under similar conditions. Soil samples were obtained from both test sites. For comparison, similar tests were performed on the soil samples obtained from each site. Initial testing …

    ttu Repository record for Construction and monitoring of an experimental highway pavement section for a long-term study on the effectiveness of cement as a subgrade stabilizer in fine-grained soils (opens in a new tab)

  12. Work process : determination of a schedule for the IH 635 state highway improvement using the linear scheduling method, Dallas County

    … of a Texas Department of Transportation (TxDOT) highway improvement project. The Linear Scheduling Method (LSM) is applied through the use of Microsoft Excel spreadsheets and graphs, and gives a working day schedule output. The data used came from Traffic Control Plans provided by TxDOT …

    texas Repository record for Work process : determination of a schedule for the IH 635 state highway improvement using the linear scheduling method, Dallas County (opens in a new tab) Restricted access

  13. Potential value extraction from TxDOT’s right of way and other property assets

    … including Texas Department of Transportation (TxDOT), have been challenged by inadequate funding from traditional federal and state fuel taxes, increasing construction cost, aging highway system, traffic congestions, and recent natural disasters, compromising their primary mission to provide …

    texas Repository record for Potential value extraction from TxDOT’s right of way and other property assets (opens in a new tab)

  14. Revamping aggregate property requirements for portland cement concrete

    Current Texas Department of Transportation (TxDOT) procedures for evaluating coarse aggregate for portland cement concrete (PCC) have been in place for over 39 years. Item 421 in the TxDOT "Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges" describes the …

    texas Repository record for Revamping aggregate property requirements for portland cement concrete (opens in a new tab)

  15. Development of a Pavement Maintenance and Rehabilitation Project Formation and Prioritization Methodology that Reflects Agency Priorities and Improves Network Condition

    … use by the Texas Department of Transportation (TxDOT) in preparing their four-year PMPs. Several key decision factors were considered and TxDOT decision makers were surveyed to weigh these factors as to their influence on prioritizing M&R projects. These were then used to develop a priority …

    tamu Repository record for Development of a Pavement Maintenance and Rehabilitation Project Formation and Prioritization Methodology that Reflects Agency Priorities and Improves Network Condition (opens in a new tab)

  16. The development of a conceptual framework for a district 4-Year Pavement Management Plan

    The Texas Department of Transportation (TxDOT) is concerned about the widening gap between preservation needs and available funding. Funding levels are not adequate to meet the preservation needs of the roadway network; therefore projects listed in the 4-Year Pavement Management Plan must be ranked …

    texas Repository record for The development of a conceptual framework for a district 4-Year Pavement Management Plan (opens in a new tab)

  17. Combined transportation and utility construction : assessment of CTUC strategy on recent projects

    … demand for a streamlined network of highways, TxDOT is making substantial efforts to reduce project delivery times and their associated costs to the traveling public. This research endeavor assesses the effectiveness of combining utility relocation with highway construction. This approach is …

    texas Repository record for Combined transportation and utility construction : assessment of CTUC strategy on recent projects (opens in a new tab) Restricted access

  18. Implementation of ConcreteWorks software in Texas highway construction

    … of Transportation. ConcreteWorks gives TxDOT engineers, contractors, and inspectors the ability to manage the structural design, mix proportions, and construction processes in order to minimize maximum concrete temperatures as well as temperature gradients. The free program has seen …

    texas Repository record for Implementation of ConcreteWorks software in Texas highway construction (opens in a new tab)

  19. Design criteria for strength and serviceability of inverted-T straddle bent caps

    … often requires lane closures. For these reasons TxDOT funded Project 0-6416 aimed at obtaining a better understanding of the structural behavior of inverted-T bent caps and developing new design criteria to minimize such cracking in the future. Several tasks of the aforementioned project are …

    texas Repository record for Design criteria for strength and serviceability of inverted-T straddle bent caps (opens in a new tab)

  20. Development of FEA models to predict the behavior of steel bridge piles strengthened with FRP jackets and grout

    … this, the Texas Department of Transportation (TxDOT) initiated a research project to develop cost-effective, yet reliable methods to repair/strengthen the corrosion-damaged bridge steel piles. This study was performed as part of the TxDOT project with focus on the development of finite element …

    ttu Repository record for Development of FEA models to predict the behavior of steel bridge piles strengthened with FRP jackets and grout (opens in a new tab)

Page 1 of 12