Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 118 for “"Value Management"”.

  1. Evaluation and Value Management in Science

    The nature of values has been an ongoing topic of discussion in philosophy, particularly in ethics. However, as the issue of how values should play a role in science has become more prominent, the discussion has not always paid due emphasis on clarifying the nature of values as perhaps it should …

    waterloo Repository record for Evaluation and Value Management in Science (opens in a new tab)

  2. A Comparative Study of Production‑Based Earned Value Management (PEVM) and Conventional Earned Value Management (EVM) in Construction Projects

    Earned Value Management (EVM) is widely recognized by Project Management Institute and various US government agencies as a recommended method for measuring and analyzing contractor cost and schedule performance and forecasting Estimate at Completion (EAC). However, since the release of …

    concordia Download PDF for A Comparative Study of Production‑Based Earned Value Management (PEVM) and Conventional Earned Value Management (EVM) in Construction Projects (opens in a new tab)

  3. Selecting value management processes for implementation on capital facility projects

    A variety of innovative management processes, which are also interchangeably termed as best practices, value enhancing practices, and value management, are increasingly being introduced into capital facility projects, thereby causing among project stakeholders great concern about which process to …

    texas Repository record for Selecting value management processes for implementation on capital facility projects (opens in a new tab) Restricted access

  4. THE STRATEGIC APPLICATION OF SOFT VALUE MANAGEMENT TO CONSTRUCTION PROJECTS

    The emergence of value methodology could be dated back to Second World War where there was a general shortage of raw materials. Mr Larry Miles, an electrical engineer with General Electric was tasked to develop a methodology to harness the potential of achieving better product performance and lower …

    nus Repository record for THE STRATEGIC APPLICATION OF SOFT VALUE MANAGEMENT TO CONSTRUCTION PROJECTS (opens in a new tab) Download file for THE STRATEGIC APPLICATION OF SOFT VALUE MANAGEMENT TO CONSTRUCTION PROJECTS (opens in a new tab)

  5. An Improved Earned Value Management Method Integrating Quality and Safety

    … a sincere desire to improve construction project management methods to improve efficiency. Historically, quality and safety underperformances result from undermanaged quality control and safety activities. The cost and schedule impacts associated with poor quality work have always had an impact on …

    lsu-thes Repository record for An Improved Earned Value Management Method Integrating Quality and Safety (opens in a new tab)

  6. Forecasting cost at completion with growth models and Earned Value Management

    … forecasting capabilities of the existing Earned Value Management methods by refining traditional index-based approach through nonlinear regression analysis. The main novelty of the research is that this is a cost-schedule integrated approach which interpolates characteristics of a sigmoidal …

    poli-torino Repository record for Forecasting cost at completion with growth models and Earned Value Management (opens in a new tab)

  7. Analysis and application of earned value management to the Naval Construction Force

    This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing …

    nps Repository record for Analysis and application of earned value management to the Naval Construction Force (opens in a new tab)

  8. A knowledge based structure for implementing Value Management in the design of office buildings

    Value Management (VM) is an organised effort directed at analyzing the functionsof systems, supplies, equipments and facilities, for the purpose of achieving therequired functions at lowest overall cost, consistent with requirements for performance,including reliability, delivery, maintainability …

    salford Download PDF for A knowledge based structure for implementing Value Management in the design of office buildings (opens in a new tab)

  9. A Strategic Evaluation Model for Hotel Investments: A Value Management Approach for Key Stakeholders

    … and rank said determinants in developing a Value Management approach to evaluate hotel investments. A Sequential Exploratory Mixed-Methods research design was adopted, with the preliminary inductive approach utilising textual thematic analysis identifying 75 components across 11 categories. …

    uwtsd Repository record for A Strategic Evaluation Model for Hotel Investments: A Value Management Approach for Key Stakeholders (opens in a new tab) Download PDF for A Strategic Evaluation Model for Hotel Investments: A Value Management Approach for Key Stakeholders (opens in a new tab)

  10. Effectiveness of value management processes as preventive strategies against frequently occurring root causes of disputes

    … of Construction Industry Institute (CII) Value Management Processes (VMP) as preventive strategies against frequently occurring root causes of disputes. As its two primary functions, this research served to develop a list identifying root causes of disputes as well as collect data from a …

    texas Repository record for Effectiveness of value management processes as preventive strategies against frequently occurring root causes of disputes (opens in a new tab) Restricted access

  11. The integration of risk and value management : a framework for public private partnership project management

    … study aims to develop an integrated risk and value management (IRVM) framework that could be applied in the procurement of major infrastructure development projects, predominantly delivered through a PPP: the study then empirically validates the framework. Using a mixed method approach, …

    adelaide Repository record for The integration of risk and value management : a framework for public private partnership project management (opens in a new tab)

  12. Managing data science projects to gain business value : Management van data science projecten voor waardecreatie

    … cultuur, hebben op de verschillende projectmanagementfactoren. Ook wordt inzicht gegeven in de manier waarop organisaties bij de totstandkoming en het management van de data science projecten rekening houden met het belang van de datastrategie en data gedreven cultuur. Stakeholdermanagement …

    openu Repository record for Managing data science projects to gain business value : Management van data science projecten voor waardecreatie (opens in a new tab) Download PDF for Managing data science projects to gain business value : Management van data science projecten voor waardecreatie (opens in a new tab)

  13. Deficient contractor business systems: applying the Value At Risk (VAR) model to earned value management systems

    The focus of our MBA project is in Earned Value Management System (EVMS). This MBA project objectively and quantitatively portrays EVMS risk in a way that supports a monetary withhold decision and can withstand push-back (to include litigation) from the defense contractor. The government is …

    nps Repository record for Deficient contractor business systems: applying the Value At Risk (VAR) model to earned value management systems (opens in a new tab)

  14. An analysis of Earned Value Management Implementation within the F-22 System Program Office's Software Development

    Department of Defense (DoD) use of Earned Value Management (EVM) program control tool has significantly increased in the last ten years. DoD acquisition policy and training promotes EVM as a cost and schedule management tool, tracking the earned value of the work completed per the baseline plan. …

    nps Repository record for An analysis of Earned Value Management Implementation within the F-22 System Program Office's Software Development (opens in a new tab)

  15. EFFECT OF THE EARNED VALUE MANAGEMENT SYSTEM (EVMS) COMPLIANCE REVIEW THRESHOLD INCREASE ON DATA INTEGRITY AND CONTRACTOR PERFORMANCE

    … Regulation Supplement (DFARS)-required Earned Value Management System (EVMS) compliance reviews and their effect on contractor Earned Value Management (EVM) performance and data integrity metrics. The primary objective is to determine if the 2015 DFARS deviation, which raised the dollar-value …

    nps Repository record for EFFECT OF THE EARNED VALUE MANAGEMENT SYSTEM (EVMS) COMPLIANCE REVIEW THRESHOLD INCREASE ON DATA INTEGRITY AND CONTRACTOR PERFORMANCE (opens in a new tab)

  16. An analysis of the benefits and application of Earned Value Management (EVM) project management techniques for DOD programs that do not meet DOD policy thresholds

    … of this research was to demonstrate how Earned Value Management (EVM) principles can be applicable for non-major programs that spend money within the Department of Defense. This Joint Applied Project provided a tailorable EVM approach, both for contracts that do not meet the threshold, and …

    nps Repository record for An analysis of the benefits and application of Earned Value Management (EVM) project management techniques for DOD programs that do not meet DOD policy thresholds (opens in a new tab)

Page 1 of 6