Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 8 of 8 for “"Vatnsorka"”
-
Virkjun Hrossadalsár í Hafraneslandi
Lokaverkefni þetta er greinargerð um undirbúning smávirkjana, ásamt því að vera hönnun og gróft arðsemismat á örvirkjun á Hafranesi. Stuttlega er fjallað um virkjanir í næsta nágrenni.
-
Vatnshrútur
Verkefnið fjallar um hönnun á vatnshrúti. Vatnshrútur er vatnsdæla sem knýr sig sjálfmeð tilkomu fallorku. Markmið verkefnisins er hanna og herma vatnshrút sem er ætlaður í ákveðin læk sem heitir Ölduvaðslækur. Hönnunin er háð ákveðnum upphafskilyrðum eins og fallhæð, vatnsstraumi, dæluhæð og …
-
Skiptir upprunaábyrgð raforku á Íslandi máli?
Í þessari ritgerð er leitast við að kanna hvort viðskiptalegur uppruni raforku á Íslandi skipti máli. Umhverfismál fá sífellt meiri athygli og umfjöllun. Ákall ungs fólks um öflugri aðgerðir í loftslagsmálum hefur verið áberandi á meðan á skrifum þessum hefur staðið. Með tilkomu skráningar uppruna …
-
Hydroelectric power station : Nigerleq
This report contains a pre-feasibility study and an evaluation of a potential new 3 MW hydroelectric power station utilizing two separate reservoirs located in the Nigerleq area in close proximity to the city of Paamiut in Western Greenland. This purpose of this research is to determine if the …
-
Phasor Measurement Unit (PMU) : based system for event detection on synchronous generators
Unusual generator events are sometimes seen in the Phasor Measurement Unit (PMU) data in the Icelandic power system, probably due to the small size. The use of PMU data with event detection algorithms, along with modeling, could be a method of capturing these events for analysis. The goals of this …
-
Techno-economic analysis of hydrogen production with electricity from Fljótsdalur hydropower plant in Iceland
The Icelandic government has set ambitious goals to achieve carbon neutrality before 2040 and to cut green house gas emissions by 40% before 2030. In this process, there are many obstacles to overcome, among them the energy transition for long-distance transport on land and sea. To that end, …
-
Optimization and profitability of hydro power combined with wind power
Co-operation of wind and hydropower could have positive synergistic effects because of higher wind speeds in the winter and more water runoff during summer and also because water is saved while running the wind turbines instead of hydro power plants. In this study a location for wind turbines named …
-
Power production forecasting for a small hydro power plant to increase operational reliability for both monthly and daily forecasting
Power production oversight is a crucial part in decreasing waste and increasing the utilization of the resource of the power plant. The risk of selling electricity from a hydro power plant lies in both resource waste and unforeseen cost due to an increase or decrease in power production resulting …