Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 44 for “"Work Order"”.

  1. Work Order Selection and Assignment

    Made available in DSpace on 2014-12-09T17:13:45Z (GMT). No. of bitstreams: 1 6812217.pdf: 7102575 bytes, checksum: 5415b5e7c0404f65e7b129f729302a77 (MD5) Previous issue date: 1968

    uiuc Repository record for Work Order Selection and Assignment (opens in a new tab)

  2. Work Order Prioritization Using Neural Networks to Improve Building Operation

    … facilities. Processing and prioritizing work orders constitute a big part of facility management, given the large number of work orders submitted daily. Current practices for prioritizing work orders are mainly user-driven and lack consistency in collecting, processing, and managing a …

    vt Repository record for Work Order Prioritization Using Neural Networks to Improve Building Operation (opens in a new tab)

  3. Operational performance benchmarking for commercial buildings by using text analytics on work order logs and tenant survey data

    … to detect anomalous floors, equipment, and work-order categories in large commercial buildings. To this end, this thesis presents a method to extract operational performance metrics from computerized maintenance management systems (CMMS) and text-based tenant surveys. The method was …

    carleton Repository record for Operational performance benchmarking for commercial buildings by using text analytics on work order logs and tenant survey data (opens in a new tab)

  4. Developing a traffic control device maintenance management system interfacing with Gis

    … physical plant to interface with a work management system. Information pertaining to the number and condition of such features is required for planning, operating, maintaining, managing and budgeting needs. This thesis summarizes the development of a user-friendly, computerized …

    unlv Repository record for Developing a traffic control device maintenance management system interfacing with Gis (opens in a new tab) Download PDF for Developing a traffic control device maintenance management system interfacing with Gis (opens in a new tab)

  5. Value Proposition of COBie at University of Washington

    … System (CMMS) of the owner where the maintenance work orders are managed. The value of COBie for Facility Management is determined in two phases of turn over, and operations and maintenance. The value of COBie at University of Washington in turn over phase was investigated previously, and this …

    washington Repository record for Value Proposition of COBie at University of Washington (opens in a new tab)

  6. Tengir : employee system

    … system the employees can clock in and out of work, order lunch and use the company’s shop. This system also includes administrative access, where an administrator can view and manage staff attendances, lunch orders and shop purchases.

    reykjavik Repository record for Tengir : employee system (opens in a new tab)

  7. Usable and Dynamic Interface for Mobile Reporting

    … a software solution for taking care of everyday work tasks such as time reporting, work order handling and equipment handling using mobile devices. Service providers that have field personnel, such as electricians and carpenters, commonly use it. This solution offers a paperless working …

    chalmers Repository record for Usable and Dynamic Interface for Mobile Reporting (opens in a new tab)

  8. An experimental investigation of shortest repair time for maintenance scheduling

    … Repair Time scheduling procedure for reducing work order waiting time. In order to perform the analysis and test the feasibility of this scheduling procedure, several simulation models were developed. The simulation results showed that SRT can reduce downtime. A series of experiments with …

    ut-knoxville Repository record for An experimental investigation of shortest repair time for maintenance scheduling (opens in a new tab)

  9. Study and analysis of value stream for Yesco production

    … of lean manufacturing concepts to the make-to-order production process sector with a focus on the entertainment sign industry. The goal of this research is to investigate the production: process of Young Electric Sign Company (YESCO) and develop a current state value stream map for different …

    unlv Repository record for Study and analysis of value stream for Yesco production (opens in a new tab) Download PDF for Study and analysis of value stream for Yesco production (opens in a new tab)

  10. Potable Water Leakage Prediction and Detection using Geospatial Analysis

    … using traditional acoustic detection methods, work order research, and GPR. The resulting data show that spatial analysis coupled with geospatial analysis of field pressure information improves water loss mitigation.

    etsu Repository record for Potable Water Leakage Prediction and Detection using Geospatial Analysis (opens in a new tab) Download PDF for Potable Water Leakage Prediction and Detection using Geospatial Analysis (opens in a new tab)

  11. A Case Study of the Use of BIM and Construction Operations Building Information Exchange (COBie) for Facility Management

    … of database, Technology and Effect on work order response times. A qualitative analysis is conducted to study the application of these concepts and identify any problems encountered. A case study is conducted on three projects where BIM and COBie were used for facility management. It is …

    tamu Repository record for A Case Study of the Use of BIM and Construction Operations Building Information Exchange (COBie) for Facility Management (opens in a new tab)

  12. AIA - Assistente digital para manutenção predial: desenvolvimento de um protótipo funcional com potencial de integração informacional baseada em BIM-FM

    … processes and the lack of data integration. This work presents the development of the AIA (Integrated Assistant for Building Maintenance Support) platform, a Minimum Viable Product (MVP) built under the Design Science Research (DSR) methodology, structured in five stages. The methodology included …

    brazil-ufrn Repository record for AIA - Assistente digital para manutenção predial: desenvolvimento de um protótipo funcional com potencial de integração informacional baseada em BIM-FM (opens in a new tab)

  13. Development of a Mathematical Model for the Estimation of Required Maintenance for a Homogenous Facilities Portfolio Using Multiple Linear Regression

    … facility-attribute data from a maintenance work-order system and develop a prediction equation by using multiple regression analysis for predicting required maintenance. The derived prediction equation’s results were compared with those of three popular models discussed in the research. The …

    utk-theses Repository record for Development of a Mathematical Model for the Estimation of Required Maintenance for a Homogenous Facilities Portfolio Using Multiple Linear Regression (opens in a new tab)

  14. Atleidimas iš darbo, kai darbuotojas vieną kartą šiurkščiai pažeidžia darbo pareigas /

    … and local legal acts of companies, in this work theoretical and practical problem of dismissal from work when employee once outrageously breaches work duties are analyzed: At first theoretical problematic of concept’s outrage breach revealing is researched comparing this concept with other …

    vilnius Repository record for Atleidimas iš darbo, kai darbuotojas vieną kartą šiurkščiai pažeidžia darbo pareigas / (opens in a new tab)

  15. Integrating perceptual, semantic and syntactic information in sentence production

    The experimental work and the theoretical model presented in this thesis explore the behaviour of the sentence production system in perceptually, conceptually, and syntactically changing environments across languages. Nine experiments examine how speakers of different languages integrate available …

    glasgow Download PDF for Integrating perceptual, semantic and syntactic information in sentence production (opens in a new tab)

  16. A Hybrid Approach for Developing, Extending, and Implementing Industrial Maintenance Knowledge Graphs and Semantic Ontologies to Support Smart Maintenance Diagnostics

    … informal nature. This thesis will propose a framework for transforming maintenance log data, which is often in the form of natural language text, into formal knowledge graphs. The proposed method generates a knowledge graph that encodes the semantic relationships between multiple maintenance …

    texas-state Repository record for A Hybrid Approach for Developing, Extending, and Implementing Industrial Maintenance Knowledge Graphs and Semantic Ontologies to Support Smart Maintenance Diagnostics (opens in a new tab)

  17. AR TECHNOLOGY: EFFICIENCY IMPROVEMENT TOOL FOR SHIPBOARD MAINTENANCE

    … process relies on the written description of a work order, which besides the ship compartment, offers little guidance regarding the precise physical location of the maintenance item. This ambiguity causes inefficiencies in the execution of the repair. Augmented Reality (AR) has strong evidence …

    nps Repository record for AR TECHNOLOGY: EFFICIENCY IMPROVEMENT TOOL FOR SHIPBOARD MAINTENANCE (opens in a new tab)

  18. Controlling nonpoint pollution in Virginia's urbanizing areas: an institutional perspective

    … the effectiveness of the institutional framework of the Commonwealth of Virginia in the implementation and enforcement of nonpoint source (NPS) pollution control measures in the state's urbanizing areas. The institutional framework is developed primarily around the existing governmental …

    vt Repository record for Controlling nonpoint pollution in Virginia's urbanizing areas: an institutional perspective (opens in a new tab)

  19. A Mathematical Programming Based Procedure for the Scheduling of Lots in a Wafer Fab

    … such that the total tardiness of the product orders is minimized over the planning horizon. Second, the schedule of these lots is determined so that the cycle time of each lot released into the system is minimized. Thus, the performance measures based both on due dates and cycle time are …

    vt Repository record for A Mathematical Programming Based Procedure for the Scheduling of Lots in a Wafer Fab (opens in a new tab)

Page 1 of 3