Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 20 of 110 for “"Work Packages"”
-
The identification and management of cost significant work packages
… and management of cost significant work packages which is an amalgamation of individual cost significant items of similar nature. The objectives are twofold.
-
Workflow Evaluation of Key Work Packages in Drug Product Technologies
… analysis and discussion of end-to-end study workflows; (3) a case study evaluating a proposal to implement automation to increase efficiency and consistency of study execution. This research incorporates data across all three altitudes to be used in conjunction with methods of process flow …
-
BIM Derived Quantity Checks for Takt Planning Control in Interior Works: Identifying Capacity Sensitive Work Packages Through a BIM to Excel to Revit Workflow
… trades through defined locations and repeated work packages so that production can follow a planned rhythm. During interior works, that rhythm depends on whether the work assigned to each location can be completed within the available takt time and whether the information behind the plan …
-
A Deep Learning Approach for Forecasting Cost Estimate at Completion (EAC) in Construction Projects
… this research proposes a deep-learning framework structured into five phases, starting with exploring the literature review and finishing with the practical application of the developed model. This framework leverages historical data from completed projects and deep-learning algorithms to …
-
Estimating, planning and control systems based on production data in the construction industry.
… construction industry.Selected cost significant work sections are considered in the study and production data are formulated based on feedback information from several first sample projects. Comparisons are made between average production data and individual project data.A structured systems …
-
Estimating productivity losses due to change orders
… in the developments made in this thesis. Only 33 work-packages from these projects were utilized in the development of the present model. These work packages have an original total value of more than $110M, planned direct hours of 1,023,583 for the original scope of work and a total of change …
-
An Integrated Framework for Selecting the Optimum Sustainable Construction Execution Strategy Using Genetic Algorithm
… These decisions are especially crucial at the work package level, where different methods for significant work packages such as foundations, framing, or siding impact duration, budget, labor, and emissions due to varied resource needs and alternatives. Industry practices for selecting execution …
-
A Work Package-Based Process Model for Petrochemical Construction Planning
… plant construction projects and the impact of work packaging on planning. This study was accomplished primarily through interviews with various levels of people in the business of building petrochemical plants. This study indicated that work packages currently used are often less detailed than …
-
An information-based decision making framework for evaluation and forecasting a project cost and completion date
… and comprehensive decision making framework to pursue the successful achievement of projects’ goals within cost and on time. The main objective is to develop an information-based tool for evaluating and forecasting a project cost and completion during the execution. The research focuses …
-
A fault-tolerant software algorithm for a network of transputers
… presents a software algorithm that resends work packages to processors when one or more of the worker processors fails or when the link with one or more processors fails. There are two resend criteria used in this algorithm: "resend at end of initial assignment" and "resend at time out". The …
-
Analysis of the economic risks caused by environmental issues in large infrastructure projects
… performance, and the development of a framework that will enable the analysis of the uncertainty in project economic variables caused by such issues. The focus of the research is on the natural environment. The risk analysis framework is developed with the aim of enabling project proponents …
-
An Integrated Framework for Managing Labour Resources Data in Industrial Construction Projects: A Knowledge Discovery in Data (KDD) Approach
… resources causes major problems for companies working on multiple industrial construction projects. To address these problems, an integrated framework is developed based on a five-step knowledge discovery in data model. The framework transfers existing multidimensional historical data from …
-
Schedule adherence in a naval shipyard : a case study
… schedule, personnel resources, and authorized work packages for an individual ship. The discussion then shifts to a detailed description of the management aids used to monitor and assess overhaul progress and of the techniques employed, using these aids, to seek schedule adherence on several …
-
Physicochemical characterisation, kinetic investigation and process modelling of the thermal decomposition of polymers found in end of life first-generation PV modules
… The thesis is structured into three discrete work packages outlining a physicochemical characterisation study of the encapsulant and backsheet polymers, a kinetic investigation of both polymers, and a process modelling study indicative of the delamination of end-of-life PV modules. <br/>
-
Parallel and Distributed Motif Discovery in Temporal Networks - A feasibility study applying thread parallelism and community structure
Temporal networks are used to model complex systems in topics such as epidemiology, finance, and computer networks. Motifs are subgraphs of a directed graph that are representative of the structure of that particular graph. Motifs have been extended to temporal networks. Motif discovery is a …
-
From Digital Models to Construction Sequences: A Voxel-Based Framework for Automated Industrial Construction Planning
… constraints, and a strong dependency between work sequence, workface availability, and productivity. Although Building Information Modeling (BIM) and Industry Foundation Classes (IFC) provide rich geometric and semantic information about project components, they do not directly define …
-
Runtime Detection and Prevention for Structure Query Language Injection Attacks
… in the database. This thesis proposes a new framework for the detection and prevention of new and common types of SQL injection attacks. The programme of research is divided in several work packages that start from addressing the problem of the web application in general and SQL injection in …
-
Policy based runtime verification of information flow.
… contributions being developed as a new framework, theory, model or algorithm. The methodology of the proposed approach is made up of eight work packages. One addresses the research background and the research project requirements. Six are scientific research work packages. The last work …
-
Solar Ready: Harmonizing the Solar Ready Scope for Safer & more productive Solar Deployments
… for future implementation. An analysis of the work processes performed during solar system installation identifies those work packages that are suitable for pre-installation within the scope of new construction. The installation process is a composite of several specialty building trades …
-
Morphological homogeneity, phylogenetic heterogeneity and systematic complexity in species-rich groups: a case study of floral evolution in Myrteae (Myrtaceae)
… phylogenetic and morphological analyses in two work packages (WP): WP1 increases understanding of systematics and floral evolution in Myrteae based on multiloci molecular matrices for a near complete generic sample. The framework is used to interpret biogeography, diversification and …
Page 1 of 6