Results 1 to 20 of 25 for “"Work Packaging"”
-
Enhanced work packaging : design through workface execution
All projects employ work packaging to divide the project scope into manageable portions of work for planning and execution. Enhanced work packaging, however, provides an organized and structured approach to planning through the project lifecycle in order to provide the construction work face with …
-
Identification of strategies to overcome barriers for the implementation of advanced work packaging
Work packaging is not a new concept for the construction industry. One work packaging method is Advanced Work Packaging (AWP), a construction-driven process that adopts the philosophy of “beginning with the end in mind”. Even though AWP was established as a CII Best Practice in 2015 and case …
-
Assessing advanced work packaging in industrial construction - quantitative evidence and qualitative investigation of implementation
… of construction field time is spent on direct work, the portion of a craft worker’s time that physically advances the project scope. Advanced Work Packaging (AWP) is a construction- driven methodology, designated a best practice by the Construction Industry Institute (CII) in 2015, that aligns …
-
Advanced Work Packaging from project definition through site execution : driving successful implementation of WorkFace Planning
Capital projects use work packaging to divide their projects' scope into manageable portions of work for planning and execution, all to achieve improved productivity and increased predictability. However, currently, no common industry standard for work packaging is widely and uniformly implemented …
-
Modelo para gestão das restrições no sistema Last Planner com apoio do Advanced Work Packaging
… o uso do método de planejamento Advanced Work Packaging (AWP), visando tirar proveito de suas características, aliando-as ao SLP no sentido de trazer melhorias na análise e gerenciamento das restrições em empreendimentos da construção. Oriundo de obras industriais e majoritariamente …
-
A Framework to Assess the Costs and Benefits of Utilizing Advanced Work Packaging (AWP) in Industrial Construction
… industry institute (CII) is advanced work packaging (AWP). The term advanced work packaging refers to a disciplined process for project planning and execution; it was developed to address challenges such as cost and schedule overruns in the industrial construction sector. AWP aims to …
-
Evaluating Artificial Intelligence and Machine Learning in the Development of Next-generation Advanced Work Packaging for Expeditionary Engineering
… technologies may affect Next-Generation Advanced Work Packages (AWPs) for expeditionary construction. For large owners of global construction portfolios like the largest real property owner in the world, the U.S. Department of War/Defense, learning lessons that can reduce resource consumption and …
-
Evaluating Artificial Intelligence and Machine Learning in the Development of Next-generation Advanced Work Packaging for Expeditionary Engineering
… technologies may affect Next-Generation Advanced Work Packages (AWPs) for expeditionary construction. For large owners of global construction portfolios like the largest real property owner in the world, the U.S. Department of War/Defense, learning lessons that can reduce resource consumption and …
-
Evaluating Artificial Intelligence and Machine Learning in the Development of Next-generation Advanced Work Packaging for Expeditionary Engineering
… technologies may affect Next-Generation Advanced Work Packages (AWPs) for expeditionary construction. For large owners of global construction portfolios like the largest real property owner in the world, the U.S. Department of War/Defense, learning lessons that can reduce resource consumption and …
-
Perspectives ontologiques sur l'Advanced Work Packaging (AWP) dans le management de projet de construction : Les contributions des innovations en blockchain et construction
… l'intégration des méthodologies de l'Advanced WorkPackaging (AWP), de la Construction Lean (LC) et de la Réalisation de Projet Intégrée (RPI)au sein du secteur de la construction en France pour faire face aux défis de l'industrie tels queles inefficacités, les coûts élevés et les préoccupations …
-
A Work Package-Based Process Model for Petrochemical Construction Planning
… plant construction projects and the impact of work packaging on planning. This study was accomplished primarily through interviews with various levels of people in the business of building petrochemical plants. This study indicated that work packages currently used are often less detailed than …
-
LOOK-AHEAD SCHEDULING FOR ELECTRICAL CONTRACTORS
… Published short term planning methods, such as Workface Planning, Enhanced Work Packaging, and Last Planner, which have demonstrated success in other fields of construction, can be used to improve productivity in electrical contracting. This study designed a best practice tailored to electrical …
-
An Integrated Simulation-based Planning Approach for Construction Projects
… closely related. This research provides a framework for cost and schedule integration, and transforms the model to simulation-based planning in which the uncertainties of project cost and schedule are evaluated through computer simulation. This has been achieved through explicitly incorporating …
-
Automated Construction Work Package Decision-Making Model Using RSMeans and LSTM Based Deep Learning
Construction projects involve complicated workflows with efficient resource management. One of the methods for successful project planning is Work Packaging (WP.) Composition of the WP has been done by human understanding, resulting in several critical problems, such as challenging WP of the …
-
Increasing engagement with the supply chain to improve the performance of power sector projects
… were identified. Opportunities varied from framework agreement with suppliers and modularization to improvements in supplier's contracts and early design freeze. In order to determine the relationship between the opportunities and project performance, a survey was designed, and 30 responses were …
-
Design of a hermetically sealed MEMS resonator with electrostatic actuation and capacitive third harmonic sensing
… as parasitic leakage and noise. Unlike previous work, packaging and electrical contacts have been integrated into the fabrication to create a hermetically sealed device that can easily be incorporated into other MEMS designs. Most resonators operate in vacuum because air damping at higher …
-
PERSEVERANCE: Predictive Engineering with Resilient Simulation and AI-Enabled Reasoning
… Novel Computational Engineering, a unifying framework that integrates simulation, artificial intelligence (AI), and optimization to support resilience analysis across critical domains. The first study focuses on mission-critical asset management and maintenance planning. It introduces a suite of …
-
Dimensional/Viscosimetric properties and branching rate of poly(sodium 2-acrylamido-2-methylpropane sulfonate) of high molar mass used for Enhanced Oil Recovery
… le cadre de la thèse, quatre volets (WP pour work packaging) sont abordés afin de répondre au mieux à cette problématique concernant sa structure. Le premier volet (WP1) consiste à caractériser les différents polymères industriels à travers différents outils analytiques qui sont la …
-
Investigation of the Adaptation of WorkFace Planning at the Organization and Project Levels and the Development of a Mathematical Model to Quantitatively Evaluate the Effectiveness of WorkFace Planning
WorkFace Planning (WFP) is an Alberta-based industry best practice aimed at improving productivity on industrial construction projects by eliminating delays caused by excessive onsite planning and inefficient resource coordination. However, no formal study has been conducted to investigate how the …
-
Improving frontline supervision in industrial construction
… yet time-consuming tasks during a typical work day. While many studies acknowledge the role of frontline supervisors especially foremen in supervising their crew, construction foremen are known as the marginal men in the industry and are comparatively understudied. Considering their role in …