Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 10 of 10 for “"Workface Planning"”
-
Investigation of the Adaptation of WorkFace Planning at the Organization and Project Levels and the Development of a Mathematical Model to Quantitatively Evaluate the Effectiveness of WorkFace Planning
WorkFace Planning (WFP) is an Alberta-based industry best practice aimed at improving productivity on industrial construction projects by eliminating delays caused by excessive onsite planning and inefficient resource coordination. However, no formal study has been conducted to investigate how the …
-
Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints
… decision support for project scheduling and workface planning under time-dependent resource constraints is limited in industrial-construction. Previous project scheduling research endeavors in the construction engineering and management domain focused on formulating resource-constrained …
-
Advanced Work Packaging from project definition through site execution : driving successful implementation of WorkFace Planning
… scope into manageable portions of work for planning and execution, all to achieve improved productivity and increased predictability. However, currently, no common industry standard for work packaging is widely and uniformly implemented within the North American capital projects industry. As …
-
LOOK-AHEAD SCHEDULING FOR ELECTRICAL CONTRACTORS
… often than not, this subpar performance is a planning issue. Published short term planning methods, such as Workface Planning, Enhanced Work Packaging, and Last Planner, which have demonstrated success in other fields of construction, can be used to improve productivity in electrical …
-
Integer-Programming-Assisted Path-Float-Based Method for Time-Cost Tradeoff Optimization in Project Planning
… tradeoff (TCT) optimization is a classic planning problem appealing to construction management; yet, existing analytical methods are found inadequate to make a significant impact in practice. Heuristic methods lack a theoretical basis to ensure arriving at optimum solutions in solving …
-
Data-driven Simulation-based Framework for Efficient Scheduling of Industrial Construction Projects
… of detailed information in the early planning phase. Thus, initial industrial construction schedules are often developed based on the subjective experiences of practitioners that are often overly ambitious, resulting in compressed timelines that require increased costs to achieve …
-
Enhancing Activity-on-Node Network Diagramming Technique for Modeling Interdependent Workflows in Planning Fabrication Projects
… in different stages of the project. Hence, the workface operation realities often deviate away from the actual planning bringing down the overall productivity. Unless the changes and variations (e.g., material logistics) during operations can be sufficiently and cost-effectively reflected in the …
-
Assessing advanced work packaging in industrial construction - quantitative evidence and qualitative investigation of implementation
… strategy as the primary driver of upstream planning. Despite documented benefits of up to 25% field productivity improvement and 10% reduction in total installed cost (TIC), AWP adoption remains uneven, no standardized method exists to measure the depth of its implementation, and …
-
A Framework to Assess the Costs and Benefits of Utilizing Advanced Work Packaging (AWP) in Industrial Construction
… development of more sophisticated construction planning and project control methods. One of the methods developed by the construction industry institute (CII) is advanced work packaging (AWP). The term advanced work packaging refers to a disciplined process for project planning and execution; it …
-
Perspectives ontologiques sur l'Advanced Work Packaging (AWP) dans le management de projet de construction : Les contributions des innovations en blockchain et construction
Cette thèse examine l'intégration des méthodologies de l'Advanced WorkPackaging (AWP), de la Construction Lean (LC) et de la Réalisation de Projet Intégrée (RPI)au sein du secteur de la construction en France pour faire face aux défis de l'industrie tels queles inefficacités, les coûts élevés et …