Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 44 for “"accelerated construction"”

  1. ACCELERATED CONSTRUCTION DECISION MAKING PROCESS

    … Traffic disruption during maintenance and construction activities frequently results in disruptions to local economies and communities; and raises issues of safety and congestion. The use of traditional technologies and techniques for infrastructure rehabilitation are not effective enough …

    ohiolink Repository record for ACCELERATED CONSTRUCTION DECISION MAKING PROCESS (opens in a new tab)

  2. ACCELERATED CONSTRUCTION AND REHABILITATION OF BRIDGES

    … aging transportation network necessitate highway construction to initiate and intensify efforts to accelerate repair and rehabilitation. Statistics show that vehicle miles have grown by 80 % between 1982 -2000 while the lane miles increased by only 3.8% during the same period. Any effort to close …

    ohiolink Repository record for ACCELERATED CONSTRUCTION AND REHABILITATION OF BRIDGES (opens in a new tab)

  3. Mechanical Bar Splices for Accelerated Construction of Bridge Columns

    … used to connect precast members to accelerate construction of concrete bridges and buildings. Current codes prohibit the use of couplers in the plastic hinge regions of bridge columns in high seismic zones. This may be because of a lack of systematic test data on the coupler performance, …

    sdstate Repository record for Mechanical Bar Splices for Accelerated Construction of Bridge Columns (opens in a new tab)

  4. Innovative Shear Connections for the Accelerated Construction of Composite Bridges

    Accelerated bridge construction methods are being progressively used to construct and replace bridges in North America. Unlike traditional bridge construction methods, accelerated bridge construction methods allow bridges to be built in a shortened period of time on the construction site. These …

    waterloo Repository record for Innovative Shear Connections for the Accelerated Construction of Composite Bridges (opens in a new tab)

  5. Application of Polyurethane Products in Accelerated Construction of Innovative Noise Barrier

    … sheets. The main challenge in roadside construction is the obstruction of roadways during the construction, which may result in traffic congestion, public dissatisfaction, car collision and subsequently fatalities. In order to decrease the risk of roadside construction, accelerated and …

    uwo Repository record for Application of Polyurethane Products in Accelerated Construction of Innovative Noise Barrier (opens in a new tab)

  6. Development of DBT Bridge System with Continuous Joints for Accelerated Construction

    <p>Speed of construction has become a critical issue to minimize disruption of traffic and commerce. One of the promising systems for accelerated bridge construction is the use of the decked bulb-tee (DBT) girders for the bridge superstructure. An integral deck that is precast and prestressed with …

    utk-theses Repository record for Development of DBT Bridge System with Continuous Joints for Accelerated Construction (opens in a new tab)

  7. Polymer Concrete Joints for Precast and 3D-Printed Bridge Systems in Accelerated Construction

    … for prefabricated bridge element systems in accelerated construction. Although PC has been successfully used in non-structural applications, such as repairs and bridge deck overlays, its broader structural implementation in bridge systems is limited due to the lack of design-relevant …

    unr Repository record for Polymer Concrete Joints for Precast and 3D-Printed Bridge Systems in Accelerated Construction (opens in a new tab)

  8. Exploration of 3D printing of concrete for structural health monitoring and accelerated construction

    Automation in construction through three-dimensional Printing (3DP) is gaining momentum in civil engineering due to its indomitable advantage over traditional construction approaches, such as reduced costs, improved quality, faster construction, increased sustainability with green concrete, and …

    iastate Repository record for Exploration of 3D printing of concrete for structural health monitoring and accelerated construction (opens in a new tab)

  9. A Pre-Tensioned, Rocking Bridge System for Accelerated Construction and Enhanced Seismic Performance

    … bent system has been developed to reduce on-site construction time, minimize residual displacements even after a large earthquake, and reduce seismic damage in comparison with conventional cast-in-place construction. Precast connections used in the system have been tested successfully under …

    washington Repository record for A Pre-Tensioned, Rocking Bridge System for Accelerated Construction and Enhanced Seismic Performance (opens in a new tab)

  10. Exploration of Innovative Concrete Masonry Blocks to Meet Emerging Manufacturing and Construction Techniques for Improved Structural Performance and Accelerated Construction Speed

    Masonry structures construction involves placing blocks together with mortar to create structures. Concrete masonry blocks are commonly used in North America for load-bearing walls, typically measuring 390 × 190 × 190 mm with two voids. Recently, technological advancements in robotics have …

    alberta Repository record for Exploration of Innovative Concrete Masonry Blocks to Meet Emerging Manufacturing and Construction Techniques for Improved Structural Performance and Accelerated Construction Speed (opens in a new tab)

  11. A transposon gene delivery system for the accelerated construction of HEK293S stable cell lines and its application for the study of rhodopsin retinitis pigmentosa mutants

    … to overcome these limitations thus enabling the construction of several HEK293S inducible stable cell lines in under a month. Here, two groups of rhodopsin RP mutants were investigated. Group one comprised enigmatic mutants E122G, R252P, S298D, K311E. E122G had a λmax shifted to 481 nm and Meta …

    essex Repository record for A transposon gene delivery system for the accelerated construction of HEK293S stable cell lines and its application for the study of rhodopsin retinitis pigmentosa mutants (opens in a new tab)

  12. BENCHMARKING STUDY OF BRIDGE COST AND CONSTRUCTION TIME

    … of Transportation are considering the use of accelerated construction techniques as a means of reducing traffic congestion during construction. Such techniques may cost more and DOT engineers must justify the increased cost through comparison to user costs. However, in order to determine the …

    ohiolink Repository record for BENCHMARKING STUDY OF BRIDGE COST AND CONSTRUCTION TIME (opens in a new tab)

  13. Column-Supported Embankments: Full-Scale Tests and Design Recommendations

    … There are two principal reasons to use CSEs: 1) accelerated construction compared to more conventional construction methods such as prefabricated vertical drains (PVDs) or staged construction, and 2) protection of adjacent facilities from distress, such as settlement of existing pavements when a …

    vt Repository record for Column-Supported Embankments: Full-Scale Tests and Design Recommendations (opens in a new tab)

  14. Multi-parameter bidding in highway construction and rehabilitation projects

    … road user costs caused by rehabilitation or reconstruction projects and limited resources due to insufficient capital investments, State Highway Agencies (SHAs) have started to utilize innovative contracting methods by incorporating construction time and life-cycle cost into the bidding …

    okstate Repository record for Multi-parameter bidding in highway construction and rehabilitation projects (opens in a new tab)

  15. Evaluation of Experimental Bridges in Tennessee

    … Moment Connection in order to facilitate the accelerated construction of steel girder bridges. This connection allows the girders of a multispan steel bridge to be erected as simple spans and then to be made continuous prior to the dead load of the deck being applied. Since 2003, the …

    utk-theses Repository record for Evaluation of Experimental Bridges in Tennessee (opens in a new tab)

  16. Resistance mechanism of simple-made-continuous connections in skew and non-skew steel girder bridges using conventional and accelerated types of construction

    … economical than steel bridges using conventional construction methods. Construction and material cost are two major factors that can affect the total cost of a bridge construction project. Since no control can be taken over material costs, any response must focus on the design and construction …

    nebraska Repository record for Resistance mechanism of simple-made-continuous connections in skew and non-skew steel girder bridges using conventional and accelerated types of construction (opens in a new tab)

  17. Laboratory and field testing and evaluation of precast bridge elements

    <p>The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Black Hawk County (BHC) has developed a precast modified beam-in-slab bridge (PMBISB) system for use with accelerated …

    iastate Repository record for Laboratory and field testing and evaluation of precast bridge elements (opens in a new tab)

  18. Development of Improved Connection Details for Voided Slab Bridges

    … clearances due to their small section depths, accelerated construction times, and high torsional stiffness. The current longitudinal connection detail, a partial depth grouted shear key, has been known to fail in many of these bridges. The failure leads to reflective cracking in the wearing …

    vt Repository record for Development of Improved Connection Details for Voided Slab Bridges (opens in a new tab)

  19. Precast concrete bridge barriers for accelerated bridge construction

    … transportation organizations have embraced Accelerated Bridge Construction (ABC) to reduce both the traffic impacts and societal costs. One of the most common means to achieve ABC is to utilize prefabricated elements, which are connected together on-site to construct a bridge. ABC will not …

    iastate Repository record for Precast concrete bridge barriers for accelerated bridge construction (opens in a new tab)

Page 1 of 3