Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 5 of 5 for “"acceleration of construction"”

  1. Knowledge sharing within the Kingdom of Saudi Arabia large construction organisations

    An increasing number of Kingdom of Saudi Arabia (KSA) construction organisations are turning to knowledge sharing as a key to leverage their distinctive core competencies in their pursuit of competitive advantage. However, the construction industry is one of the most challenging environments where …

    wlv Repository record for Knowledge sharing within the Kingdom of Saudi Arabia large construction organisations (opens in a new tab)

  2. An analysis framework for public-private partnerships

    A number of decisions confront both the public and private sectors when considering the use of a Public-Private Partnership (PPP) approach for a given project. They include: identifying the design alternatives which best satisfy public needs and the project's constraint set; what PPP approach is …

    ubc Repository record for An analysis framework for public-private partnerships (opens in a new tab)

  3. An interpretivist approach for the development of a behavioural framework to support the adoption of waste minimisation behaviour of contractors : the case study of Jordan

    In recent decades, with the rapid development of urbanisation and the acceleration of construction, renovation and demolition activities worldwide, enormous volumes of construction waste (CW) have been generated at a colossal rate. CW accounts for approximately 36% of the total solid waste received …

    salford

  4. An interpretivist approach for the development of a behavioural framework to support the adoption of waste minimisation behaviour of contractors : the case study of Jordan

    In recent decades, with the rapid development of urbanisation and the acceleration of construction, renovation and demolition activities worldwide, enormous volumes of construction waste (CW) have been generated at a colossal rate. CW accounts for approximately 36% of the total solid waste received …

    salford Repository record for An interpretivist approach for the development of a behavioural framework to support the adoption of waste minimisation behaviour of contractors : the case study of Jordan (opens in a new tab)

  5. Možnosti urychlení výstavby monolitického rámu

    Předmětem bakalářské práce je návrh vyztužení a možnosti urychlení výstavby železobetonové monolitické rámové konstrukce, která je součástí stavby sportovní haly. Práce obsahuje statický výpočet s ověřením sloupů a vazníku monolitického rámu a řešení vedení výztuže v jednotlivých konstrukčních …

    cz-tech Repository record for Možnosti urychlení výstavby monolitického rámu (opens in a new tab)