Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 8 of 8 for “"advancement of construction"”
-
Development of a cross-flow fan powered quad-rotor unmanned aerial vehicle
The research presented is dedicated to the advancement of construction techniques in order to implement new designs of a vehicle suited for cross-flow fan propulsion. This is accomplished by designing a quad-rotor cross-flow fan that incorporates lessons learned from previous generation models as …
-
Development of Human Pose Analyzing Algorithms for the Determination of Construction Productivity in Real-time
To enhance the capability of rapid construction, an automated on-site productivity measurement system is developed. Employing the concepts of Computer Vision and Artificial Intelligence, the developed system wirelessly acquires a sequence of images of construction activities. It first processes …
-
Site management teams and project performance in the UK construction industry
… with good performance. Within the United Kingdom construction industry the need for team working is extensive. A proper understanding of teams and the advancement of construction team management capacity would have far-reaching benefits for the sector. The research programme investigates the …
-
Framework for optimizing the construction process in Saudi Arabia: the integration of lean construction, building information modeling (BIM), and emerging technologies
(English) The construction industry in Saudi Arabia is experiencing rapid growth driven by the ambitious Vision 2030, but challenges related to inefficiencies, cost overruns, and delays persist. This research presents a comprehensive framework designed to optimize the construction process in Saudi …
-
Development And Implementation Of A Proactive Safety Performance Evaluation System For General Contractors
Construction safety is an essential aspect of the construction industry and measuring safety performance has been of continuing concern. Most of the preceding studies concentrated on two widely used metrics in industry to evaluate and improve safety performance, EMR and incidence rates. However, it …
-
Characterization of workability and structuring in ternary binders by statistical methods (DOE and PCA)
… aims to provide a comprehensive understanding of the characterization and structuring of ternary binders composed of Portland Cement (PC), Calcium Aluminate Cement (CAC), and Calcium Sulfate (CŜ). Ternary binders exhibit unique characteristics that make them suitable for various advanced …
-
Digital and Operational Advancement in Construction Logistics A Case Study of Construction Logistics Management at BRA
Construction logistics management (CLM) and construction supply chain management (CSCM) are crucial for the construction industry’s performance progress and potential improvement of production efficiency. Research shows that construction logistics largely affect the overall project costs and have a …
-
Vybrané části STP pro výstavbu administrativně bytového komplexu Sochorova
Diplomová práce řeší vybrané části stavebně-technologického projektu administrativně-bytového komplexu Sochorova v Brně, Žabovřeskách. Obsahuje stavebně-technologickou studii 1.etapy se stručným popisem postupu výstavby, doloženém grafickými schématy postupu jednotlivých etap, časový a finanční …