Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 16 of 16 for “"air handling system"”.

  1. A digital simulation of a dual-duct air handling system

    … a dynamic digital simulation of a dual-duct air handling system. The individual control loops and system components of the dual-duct system which was studied are explained in detail. The testing and data recording devices used in the investigation are described. An appropriate model for the …

    ut-knoxville Repository record for A digital simulation of a dual-duct air handling system (opens in a new tab)

  2. Digital control for an existing variable-air-volume air handling system

    … thesis presents the modifications to a variable-air-volume (VAV) system designed to improve the system efficiency. An improved control strategy is applied using direct digital control. The system operates in a medium-size office building (85,000 ft.<sup>2</sup> ) and is used only for cooling. The …

    ut-knoxville Repository record for Digital control for an existing variable-air-volume air handling system (opens in a new tab)

  3. Field Evaluation and Anaysis of a Liquid Desiccant Air Handling System

    A thermal liquid desiccant air handling machine was procured, installed, and field tested. The goal of the present investigation is to evaluate the field performance of the machine and characterize its operation for the temperature range of a solar thermal array. The system studied includes a …

    queens Repository record for Field Evaluation and Anaysis of a Liquid Desiccant Air Handling System (opens in a new tab)

  4. Development of an integrated air handling system for large commercial buildings

    … in 1949 to 17,397 trillion BTUs in 2002. HVAC systems in large commercial buildings consume about half of the total energy. The energy used by HVAC systems is in excess of the sum total of the building loads. Excess energy usage is primarily caused by simultaneous cooling and heating systems. …

    nebraska Repository record for Development of an integrated air handling system for large commercial buildings (opens in a new tab)

  5. Precooling Ventilation Air for Hospital Operating Rooms and the Affects on Terminal Box Reheat

    … of climate on the energy performance of two HVAC system configurations—AL1, a conventional air handling system, and AL2, which incorporates a pre-cooling coil and discharge air temperature (DAT) reset strategy. Using EnergyPlus simulations, each system was modeled across multiple U.S. cities …

    uno Repository record for Precooling Ventilation Air for Hospital Operating Rooms and the Affects on Terminal Box Reheat (opens in a new tab)

  6. Detection of Harmful Chemicals in the Air using Portable Membrane Inlet Mass Spectrometry

    … to the detection of harmful chemicals in the air. Earth-based separations and reverse gas stack modelling are useful mathematical tools that can be used to locate the source of a chemical release by back calculation. Earth-based separations studies the way different molecules will diffuse and …

    unt Repository record for Detection of Harmful Chemicals in the Air using Portable Membrane Inlet Mass Spectrometry (opens in a new tab)

  7. Conditioning outdoor air for industrial processes

    … research investigates an existing heat exchanger system and subsequent modifications to condition process air. Three different methods will be examined to condition outdoor air to specified conditions; namely, the relative humidity and temperature of the air supplied being processed will be …

    iastate Repository record for Conditioning outdoor air for industrial processes (opens in a new tab)

  8. Development of an integrated building load and ground source heat pump model to assess heat pump and ground loop design and performance in a commercial office building

    … causes design and performance challenges to GSHP systems in residential and commercial building applications. An integrated building load and GSHP model is developed in this thesis to test approaches to reduce GSHP cost, to properly size ground heat exchanger (GHEX) installations and to offer …

    texas Repository record for Development of an integrated building load and ground source heat pump model to assess heat pump and ground loop design and performance in a commercial office building (opens in a new tab)

  9. A Study of Dust Movement through Construction Barriers

    Airborne infection agents can and do infect patients who have a lung disease or who are coping with a weakened immune systems or in some circumstances otherwise apparently healthy people. A rise in the rate of fungal infection for a particular class of immunosuppressed patients occurred in the last …

    tamu Repository record for A Study of Dust Movement through Construction Barriers (opens in a new tab)

  10. Modeling and control of SI and SI-HCCI hybrid combustion engines

    … SI and HCCI combustions is inevitable. It is fairly challenging to operate the engine in the two distinct combustion modes, and it is even more difficult to have smooth combustion mode transition between the two modes due to the distinct engine operational parameters over the two combustion …

    msu Repository record for Modeling and control of SI and SI-HCCI hybrid combustion engines (opens in a new tab)

  11. The design of a pilot dacility for the production of pheroid based products in an academic environment

    … funding that could accommodate the cost of an air handling unit (AHU), thereby achieving a higher level of protection for the entire facility. This change thus enabled the suitable location of component areas as required by material and operational flow. The impact of implementing the first …

    nwu-za Repository record for The design of a pilot dacility for the production of pheroid based products in an academic environment (opens in a new tab)

  12. Návrh větrání a chlazení v multifunkční budově se zubními ordinacemi

    Cílem diplomové práce bylo navrhnout systémy větrání a chlazení v třípodlažní multifunkční budově, ve které se kromě tří bytových jednotek nacházejí také dvě zubní ordinace s příslušným zázemím. V budově byly navrženy dva nezávislé systémy nuceného větrání, které respektují různé účely vnitřních …

    brno-tech Repository record for Návrh větrání a chlazení v multifunkční budově se zubními ordinacemi (opens in a new tab)

  13. A NOVEL LIQUID DESICCANT AIR CONDITIONING SYSTEM WITH MEMBRANE EXCHANGERS AND VARIOUS HEAT SOURCES

    Liquid desiccant air conditioning (LDAC) has received much attention in recent years. This is mainly because LDAC systems are able to control latent loads in a more energy efficient way than conventional air conditioning systems. Although many research studies have been conducted on LDAC …

    sask Repository record for A NOVEL LIQUID DESICCANT AIR CONDITIONING SYSTEM WITH MEMBRANE EXCHANGERS AND VARIOUS HEAT SOURCES (opens in a new tab)

  14. Návrh větrání a chlazení v rodinném dvougeneračním domě

    Diplomová práce se zabývá problematikou větrání a chlazení v rodinném dvougeneračním domě. Je rozdělena na dvě části – teoretickou a praktickou. Teoretická část seznamuje se základními pojmy a zákonitostmi potřebnými pro následné řešení. Je zde popsán princip větrání a chlazení, části …

    brno-tech Repository record for Návrh větrání a chlazení v rodinném dvougeneračním domě (opens in a new tab)

  15. Návrh výměníku pro regeneraci tepla z odpadního vzduchu

    Diplomová práce se zabývá zpětným získáváním tepla z odpadního vzduchu v multifunkční hale. Jejím obsahem je rešeršní část, která uvádí požadované parametry vnitřního prostředí, složení vzduchotechnické jednotky a popis jednotlivých výměníků vhodných pro tento účel. Následuje návrhový výpočet …

    brno-tech Repository record for Návrh výměníku pro regeneraci tepla z odpadního vzduchu (opens in a new tab)

  16. Administrativní budova v Pustkovci

    Cílem diplomové práce je zpracování návrhu administrativní budovy s téměř nulovou spotřebou energie. Projekt je rozdělen do tří částí. První část je vypracování projektové dokumentace architektonicko-stavebního řešení pro úroveň stavebního povolení. Tato část obsahuje stavebně-konstrukční řešení, …

    brno-tech Repository record for Administrativní budova v Pustkovci (opens in a new tab)