Work Function Analysis of Vegetarian Entree Production
… of eight vegetarian entrees. The two work areas observed were the ingredient assembly area and the cooks' production area. This labor time was recorded by Work Functions to find the dis- tribution of labor time. Data from the observations were compiled using an Apple II computer system. …
-
The Development of an Automated Production System
… Aerospace Division, Orlando, Florida, for the assembly, inspection and test of printed circuit boards. The project began in January 1981 with the purpose of increasing the then existing production capability and to create the building block for the total automation of the printed circuit board …
-
Factors that Affect the Perception of Company Success by Assembly Workers in the Boat Industry
… is a challenge. This is especially true in the assembly area where the average job is unskilled and not considered a career position. The purpose of this study is to identify the individual and organizational factors that contribute to high turnover in the boating industry. This study …
-
An Initial Transportation and Mobility Needs Assessment for the Shoalwater Bay Indian Tribe
… present the need for a safety tower and uphill assembly area, it also presents transportation and mobility challenges. Using community engagement, secondary data analysis, and a community survey, this thesis identifies the Tribe’s transportation needs and challenges; some of the immediate, short …
-
Least-cost Sites for Cooperative Egg Marketing Federations for Eastern South Dakota
… (2) To determine the least-cost locations of two area cooperative egg marketing federation plants to serve these 25 cooperative associations; and, (3) to determine whether a single plant or two plants would better serve the 25 cooperative associations. Egg receipts data of 25 cooperative egg …
-
A Total Cost Analysis Model of Construction Logistics Solutions Comparing Direct Delivery and Delivery via a Construction Logistics Center at JM
… leaving the supplier to being placed at the assembly area at the site. The cost data in the TCA are gathered from JM’s framework agreements with suppliers and the CLC-operator. The activities identified in each logistics process are gathered from observations as well as the framework …
-
Explaining large observed variation in construction cost of nuclear power plants through correlated random variables
… of the discount rate, the size of the on-site assembly area, the use of different welding technologies, and testing was evaluated for the nuclear island of the WEC-SMR. A methodology to perform stochastic analyses through Iman-Conover method to account for correlation between costs and …
-
Analysis of the Impact of External Factors on Human Errors in a Typical Aero-Engine Plant
Aero-engine assembly activities type and volume limit the manufacturers’ ability to automate all processes; thus, the assembly of engines and many supporting processes heavily rely on the operators’ skills. Human operators show significant variability in their performance, which is usually referred …
-
Numerical methods for queues with shared service
… end product in a box prior to sending it to the assembly area. The parts and their inventories being the customers and queues, we get ``shared service'' as kitting cannot proceed if some parts are absent. Still in the area of inventory management, the decoupling inventory of a hybrid …
-
Obecní dům, Lhota
Předmětem diplomové práce je vypracování projektové dokumentace pro provádění stavby občanského vybavení. Jedná se o polyfunkční budovu, ve které se nachází obecní úřad, knihovna a kulturní sál. Stavba je samostatně stojící, skládá se ze dvou vzájemně oddilatovaných částí, část A – Kulturní sál a …
-
Kulturní centrum Brno
Práce se věnuje návrhu kulturního centra v Brně na dosud nezastavěné proluce oproti Obilnému trhu na ulici Údolní. Urbanistické řešení zachovává všechny stávající užívané budovy a novostavbou doplňuje uliční čáru okolní historické zástavby. Širší vstupní předprostor kulturního centra je tvořen …
-
Sportovně - rekreační centrum Vsetín, Ohrada
Diplomové práci předcházel specializovaný ateliér, zaměřený na vypracování urbanisticko-architektonického návrhu v oblasti „Vsetín - Ohrada". V této předdiplomové práci jsem se zabývala především analýzami a předběžným návrhem území. Nově navržené objekty mají za úkol přetvořit celé území, které v …