Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 3 of 3 for “"bill of quantity."”.

  1. Study of fast cost estimation system for building projects in China

    In the field of construction engineering, effective management of projects relies on domain knowledge and experience. However, many domain problems cause difficulty on performing projects in China. Such problems include difference between planned and market economies, difference between fixed-price …

    adelaide Repository record for Study of fast cost estimation system for building projects in China (opens in a new tab)

  2. Stanovení výše pojistného plnění za škodu na rodinném domě ve Zlíně způsobenou sesuvem půdy

    Diplomová práce se zabývá tématem likvidace pojistné události na vybraném rodinném domě, je stanovena výše pojistného plnění za škodu způsobenou sesuvem půdy. V první, teoretické části diplomové práce jsou objasněny základní pojmy týkající se tří hlavních témat – oceňováním nemovitostí, způsobu …

    brno-tech Repository record for Stanovení výše pojistného plnění za škodu na rodinném domě ve Zlíně způsobenou sesuvem půdy (opens in a new tab)

  3. Stanovení výše pojistného plnění za škodu na rodinném domě v Brně – Přízřenicích způsobenou požárem

    Diplomová práce řeší náležitosti a postup při stanovení výše pojistného plnění po pojistné události na rodinném domě ve vybraném časovém období. Dělí se na teoretickou část a praktickou. V úvodě teoretické části je nastíněna tématika pojišťovnictví a pojištění, jejích vznik, vývoj a členění. Další …

    brno-tech Repository record for Stanovení výše pojistného plnění za škodu na rodinném domě v Brně – Přízřenicích způsobenou požárem (opens in a new tab)