Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 13 of 13 for “"bills of quantities"”.

  1. An Investigation of the Contractor's Use of Bills of Quantities

    The bill of quantities is a document extensively used throughout the building industry, and has remained substantially unaltered since the introduction of the first edition of the Standard Method Of Measurement Of Building Works in 1922. This research answers the question, what use is the bill of …

    aston Download PDF for An Investigation of the Contractor's Use of Bills of Quantities (opens in a new tab)

  2. Computer aided architectural evaluation and design : a cost modelling experiment.

    This dissertation addresses the problem of Computer Aided Architectural Evaluation and Design, with particular reference to building cost evaluation and cost modelling. It identifies the lack of building evaluation tools in the CAAD environment, and suggests an integrated approach to building …

    whiterose Download PDF for Computer aided architectural evaluation and design : a cost modelling experiment. (opens in a new tab)

  3. AI-Driven Automation of Life Cycle Assessment for New Residential Buildings

    … (AI) driven framework to automate LC of new residential buildings, reducing the time and complexity of LCA data preparation. The approach integrates Natural Language Processing (NLP), fuzzy string matching, and supervised machine learning (ML) to extract and map construction materials …

    sevilla Repository record for AI-Driven Automation of Life Cycle Assessment for New Residential Buildings (opens in a new tab)

  4. AI-Enabled Framework for Whole-Life Cycle Assessment of Building Refurbishment

    … largely due to the environmental impacts of construction materials and processes. As most buildings that will be used in the coming decades already exist, refurbishment offers significant opportunities to reduce embodied emissions by extending building service life and limiting new …

    sevilla Repository record for AI-Enabled Framework for Whole-Life Cycle Assessment of Building Refurbishment (opens in a new tab)

  5. Application of Optimisation Techniques to Planning and Estimating Decisions in the Building Process

    … developed for multi-storey reinforced concrete office buildings.<br/><br/>The development of the model has been based on interviews completed with Planners, Estimators and Researchers within 2 of the top 20 (in terms of turnover) UK main contractors, and on published literature, bar charts and …

    southwales Repository record for Application of Optimisation Techniques to Planning and Estimating Decisions in the Building Process (opens in a new tab) Download PDF for Application of Optimisation Techniques to Planning and Estimating Decisions in the Building Process (opens in a new tab)

  6. Porovnání ceny stavebního objektu v ČR a zahraničí

    Tato diplomová práce se zabývá cenami, rozpočtováním a kalkulacemi v našich a zahraničních podmínkách. Práce dále analyzuje a vyhodnocuje výhody a nevýhody jednotlivých způsobů vzniku ceny a samotnou cenu stavebního objektu v České republice a zahraničí.

    brno-tech Repository record for Porovnání ceny stavebního objektu v ČR a zahraničí (opens in a new tab)

  7. DESIGN?AND?BUILD PROCUREMENT SYSTEM

    One of the main changes apparent in the local construction industry is the move from tried and traditional procurement systems, towards design-and-build procurement. Design-and-build continues to grow steadily in unabated popularity. Without a doubt, the characteristic single point responsibility …

    nus Repository record for DESIGN?AND?BUILD PROCUREMENT SYSTEM (opens in a new tab) Download file for DESIGN?AND?BUILD PROCUREMENT SYSTEM (opens in a new tab)

  8. Stavebně technologická studie výstavby penzionu

    Bakalářská práce řeší studií hlavních technologických etap výstavby penzionu v Tišnově. Zpracována byla především technická zpráva řešeného objektu, technologická studie realizace hlavních technologických etap, časový a finanční plán výstavby, základní koncepce staveništního provozu, výkaz výměr, …

    brno-tech Repository record for Stavebně technologická studie výstavby penzionu (opens in a new tab)

  9. Stavebně technologická studie výstavby administrativní budovy v Ostravě

    Předmětem bakalářské práce je stavebně technologická studie pro administrativní budovu v Ostravě – Hrabové. Ze zpracované dokumentace je jedná především technickou zprávu, technologickou studii realizace hlavních technologických etap výstavby pro zadaný objekt, časový a finanční plán výstavby, …

    brno-tech Repository record for Stavebně technologická studie výstavby administrativní budovy v Ostravě (opens in a new tab)

  10. Administrativní centrum Hodonín - stavebně technologický projekt

    Obsahem diplomové práce je realizace třípodlažní zděné administrativní budovy s provozem ve městě Hodoníně. Textová část obsahuje technickou zprávu ke stavebně technologickému projektu, technickou zprávu dopravních vztahů, studii realizace hlavních technologických etap objektu SO 01, projekt …

    brno-tech Repository record for Administrativní centrum Hodonín - stavebně technologický projekt (opens in a new tab)

  11. Stavebně technologická studie hrubé stavby Obecního úřadu v Opočně

    Stavebně technologická studie hrubé stavby Obecního úřadu v Opočně obsahuje technickou zprávu, situaci stavby se širšími vztahy dopravních tras, výkaz výměr, technologický předpis pro provedení základů, svislých nosných konstrukcí a vodorovných nosných konstrukcí, výkres zařízení staveniště a …

    brno-tech Repository record for Stavebně technologická studie hrubé stavby Obecního úřadu v Opočně (opens in a new tab)