Showing 1 to 20 of 322 for “"bridge construction"”.

  1. Mark's Art and Bridge Construction

    … a definition of him. To make the communication bridge complete the stulptures are constructed to allow the viewer to take part in the final form. By moving the work, he is as involved in the concept, form, and material as I have been in making the piece.

    central-wash Repository record for Mark's Art and Bridge Construction (opens in a new tab)

  2. Highway bridge construction production rates for time estimation

    … the importance and process of estimating project construction time have increased in significance as roadway user costs themselves have become more significant. In estimating project construction times, beyond the process of synthesizing activity durations, few parameters are more significant than …

    texas Repository record for Highway bridge construction production rates for time estimation (opens in a new tab) Restricted access

  3. Precast concrete bridge barriers for accelerated bridge construction

    … organizations have embraced Accelerated Bridge Construction (ABC) to reduce both the traffic impacts and societal costs. One of the most common means to achieve ABC is to utilize prefabricated elements, which are connected together on-site to construct a bridge. ABC will not be effective …

    iastate Repository record for Precast concrete bridge barriers for accelerated bridge construction (opens in a new tab)

  4. Acceleration of bridge construction with prolonged service life

    <p>A large number of bridges in the US are close to their lifespan or are really old. These bridges either need a replacement or some kind of rehabilitation. This has led to increase in the bridge construction projects and with a simultaneous increase in traffic demand, there is a need to …

    iastate Repository record for Acceleration of bridge construction with prolonged service life (opens in a new tab)

  5. A Heuristic Model for Predicting Bridge Construction Requirements

    Made available in DSpace on 2014-12-10T22:22:13Z (GMT). No. of bitstreams: 1 7500418.pdf: 3798625 bytes, checksum: f7e79f855786e7ea7edafc2957bbd78e (MD5) Previous issue date: 1974

    uiuc Repository record for A Heuristic Model for Predicting Bridge Construction Requirements (opens in a new tab)

  6. Guideline for Implementing Accelerated Bridge Construction in South Dakota

    … to investigate the implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time and interruption to traffic. Less interruption to traffic also …

    sdstate Repository record for Guideline for Implementing Accelerated Bridge Construction in South Dakota (opens in a new tab)

  7. Categorizing Accelerated Bridge Construction Projects for Improving Decision-Making

    Accelerated Bridge Construction, also known as ABC, is a methodology that seeks to improve project development of bridges by reducing the overall project schedule and the impact on the traveling public by implementing innovative technologies and strategies in any phase of project development. …

    vt Repository record for Categorizing Accelerated Bridge Construction Projects for Improving Decision-Making (opens in a new tab)

  8. A Pre-Tensioned Bridge Bent System for Accelerated Bridge Construction

    Nearly all bridge bents (intermediate supports) are constructed of cast-in-place reinforced concrete. Such bridges have served the nation well in the past, but to meet current design expectations, they need to be improved in three areas: 1) speed of construction, 2) seismic resiliency, and 3) …

    washington Repository record for A Pre-Tensioned Bridge Bent System for Accelerated Bridge Construction (opens in a new tab)

  9. Innovative solutions in bridge construction, rehabilitation, and structural health monitoring

    … the development of innovative technologies for bridge construction, rehabilitation, and structural health monitoring, respectively, at different stages of the technology transfer process...The research impact is twofold: first is the introduction of promising innovative technologies in …

    must-thes Repository record for Innovative solutions in bridge construction, rehabilitation, and structural health monitoring (opens in a new tab)

  10. The Effect of Alternative Delivery on Accelerated Bridge Construction Projects

    <p>Accelerated Bridge Construction (ABC) is an option that state transportation agencies can use to repair or replace bridges in a shorter amount of time. This option offers a way to save on user costs and to increase the safety of the traveling public and the workers by reducing the amount of time …

    iastate Repository record for The Effect of Alternative Delivery on Accelerated Bridge Construction Projects (opens in a new tab)

  11. Innovations in integral abutment connection details for accelerated bridge construction

    <p>During bridge construction, closures have significant impacts on traffic flow for the public. To alleviate this impact, the presence of precast elements is being introduced in the design and construction of bridges, which would increase the efficiency of construction and convert month-, or even …

    iastate Repository record for Innovations in integral abutment connection details for accelerated bridge construction (opens in a new tab)

  12. Exploring Fiber-Reinforced Polymer Concrete for Accelerated Bridge Construction Applications

    … use of prefabricated superstructure elements in bridge construction reduces on-site construction time, improves work-zone safety, and can reduce overall project costs. For prefabricated elements to be used efficiently for accelerated bridge construction (ABC), the precast components, such as deck …

    washington Repository record for Exploring Fiber-Reinforced Polymer Concrete for Accelerated Bridge Construction Applications (opens in a new tab)

  13. Earth shoring for cast-in-place and post tensioned bridge construction

    … planners a model for the design, selection, and construction of cast-in-place and post-tensioned concrete bridges. Concrete bridges have traditionally been built using conventional falsework to support the loads, but failures have sometimes occurred in conventional falsework because of improper …

    ut-knoxville Repository record for Earth shoring for cast-in-place and post tensioned bridge construction (opens in a new tab)

  14. Precast Column-Footing Connections for Accelerated Bridge Construction in Seismic Zones

    Accelerated bridge construction (ABC) has become increasingly popular in the eyes of state and federal transportation agencies because of its numerous advantages. To effectively execute ABC projects, designers utilize prefabricated structural elements that can be quickly assembled to form …

    unr Repository record for Precast Column-Footing Connections for Accelerated Bridge Construction in Seismic Zones (opens in a new tab)

  15. Seismic Studies of Superstructure and Substructure Connections for Accelerated Bridge Construction

    Accelerated bridge construction (ABC) refers to a bridge construction method that incorporates innovative techniques and materials to efficiently reduce construction time and traffic disruption. Prefabrication of bridge components is one of a highly effective ABC method. The prefabricated elements …

    unr Repository record for Seismic Studies of Superstructure and Substructure Connections for Accelerated Bridge Construction (opens in a new tab)

  16. As-built schedule comparison between urban and rural bridge construction projects

    … difference in duration between urban and rural bridge construction projects. It provides useful information for both contractors and organizations, such as Iowa DOT. This information allows the setting up of reasonable and reliable as-planned schedules for urban area bridge construction projects …

    iastate Repository record for As-built schedule comparison between urban and rural bridge construction projects (opens in a new tab)

  17. Durability and Fatigue Behavior of CIP Concrete Connections for Accelerated Bridge Construction

    … (DBTs) or between precast panels for accelerated bridge construction are investigated. The procedure for selecting durable closure pour (CP) materials for the connections is discussed firstly. The accelerated construction is quantified as two categories: overnight cure and 7-day cure of CP …

    utk-theses Repository record for Durability and Fatigue Behavior of CIP Concrete Connections for Accelerated Bridge Construction (opens in a new tab)

  18. Shifted Plastic Hinge Column Connections Using Grouted Sleeves for Accelerated Bridge Construction

    Accelerated bridge construction (ABC) is being increasingly used in new bridge construction and repair. ABC typically requires prefabricated elements joined with mechanical couplers. Grouted sleeves (GSs) offer good construction tolerances and load transfer between precast elements. However, …

    ucf Repository record for Shifted Plastic Hinge Column Connections Using Grouted Sleeves for Accelerated Bridge Construction (opens in a new tab)