Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 2 of 2 for “"bridge construction costs"”.

  1. An Expert System Integrated with a Bridge Information Management System (BrIMS), Cost Estimating, Deterioration Forecasting, and Linear Scheduling at the Conceptual Design Stage

    Major bridge stakeholders such as federal and provincial transportation agencies are in dire need for objective knowledge-based systems that assist decision-makers in the selection of bridge type. Besides that, estimating bridge construction costs at the conceptual design stage is an increasing …

    ottawa-retro Repository record for An Expert System Integrated with a Bridge Information Management System (BrIMS), Cost Estimating, Deterioration Forecasting, and Linear Scheduling at the Conceptual Design Stage (opens in a new tab)

  2. The Influence of the Recommended LRFD Guidelines for the Seismic Design of Highway Bridges on Virginia Bridges

    … Guidelines for the seismic design of highway bridges in Virginia was investigated by analyzing two existing bridges. The first bridge has prestressed concrete girders and is located in the Richmond area. The second bridge has steel girders and is located in the Bristol area. The analysis …

    vt Repository record for The Influence of the Recommended LRFD Guidelines for the Seismic Design of Highway Bridges on Virginia Bridges (opens in a new tab)