Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 13 of 13 for “"built construction"”.

  1. Developing a Hands-On Class Exercise for Modular Construction, 3D Design, and 4D Schedule

    Modular construction shows promise as a viable alternative to stick-built construction. A major challenge with the widespread adoption of modular construction is the construction industry’s focus on minimizing risk and defaulting to the comfort and familiarity of stick-built construction. This …

    unlv Repository record for Developing a Hands-On Class Exercise for Modular Construction, 3D Design, and 4D Schedule (opens in a new tab) Download PDF for Developing a Hands-On Class Exercise for Modular Construction, 3D Design, and 4D Schedule (opens in a new tab)

  2. Geometric Quality Assessment of a Modular House using BIM and Photogrammetric Point Clouds

    As-built documentation of modular structures is an important set of records for a project, that consist of construction drawings and specifications, project design modifications, prefabrication, and component assembly. In particular, manual geometric quality assessments of a structure’s …

    unlv Repository record for Geometric Quality Assessment of a Modular House using BIM and Photogrammetric Point Clouds (opens in a new tab) Download PDF for Geometric Quality Assessment of a Modular House using BIM and Photogrammetric Point Clouds (opens in a new tab)

  3. Waste reduction in multi-family construction: a comparative study

    In a linear economy, construction and demolition (C&D) waste is considered to have zero value and, thus, most C&D waste ends up in landfills. However, key stakeholders have begun to improve waste management practices, focusing on waste reduction, material reuse and recycling in an effort to meet …

    colostate Repository record for Waste reduction in multi-family construction: a comparative study (opens in a new tab)

  4. Explaining large observed variation in construction cost of nuclear power plants through correlated random variables

    … as the large delays and cost escalation during construction, make nuclear reactors unattractive for investors. The history of nuclear power plants construction in the US shows the necessity to properly estimate construction costs and cost uncertainty and contingency. Uncertainties during …

    gatech Repository record for Explaining large observed variation in construction cost of nuclear power plants through correlated random variables (opens in a new tab)

  5. Peripheral modernities: Urban imaginaries, housing, and informality on the edge of Chongqing

    … urbanisation by portraying public housing built on the urban periphery as a form of equitable development. Long-term fieldwork in the recently urbanised district of Dazhulin revealed a space which became home to diverse social groups displaced by urban restructuring. By investigating the …

    whiterose Download PDF for Peripheral modernities: Urban imaginaries, housing, and informality on the edge of Chongqing (opens in a new tab)

  6. A reality-based cost-benefit analysis of high performance residences in Victoria, BC

    … contractors to gain a firm understanding of the construction details required to achieve the various levels of the “Step-Code” in the newest edition of the BCBC. It was important to gain this information specific to Victoria B.C. to make an appropriate estimation of the actual “cost challenge” …

    uvic Repository record for A reality-based cost-benefit analysis of high performance residences in Victoria, BC (opens in a new tab)

  7. The human-machine interface (HMI) and re-bar detection aspects of a non-destructive testing (NDT) robot

    The Construction Industry is for the greater part unfamiliar with the operation of automation and robotics devices. Furthermore, the extent to which the existing labour force can be re-trained, or be justifiably supported by specialist personnel, remains unclear. Arising from this, it is thence …

    city-london Download PDF for The human-machine interface (HMI) and re-bar detection aspects of a non-destructive testing (NDT) robot (opens in a new tab)

  8. Representing the planned vs. as-built story for linear projects in urban environment using data visualization

    … data are generated during the execution of construction projects, especially large-scale infrastructure projects. Emphasized in this thesis is how data visualization can provide important insights during the planning, implementation and post project analysis phases of linear projects in an …

    ubc Repository record for Representing the planned vs. as-built story for linear projects in urban environment using data visualization (opens in a new tab) Download PDF for Representing the planned vs. as-built story for linear projects in urban environment using data visualization (opens in a new tab)

  9. Impact of Spatial Cognitive Abilities on the Effectiveness of Augmented Reality in Construction and Fabrication

    Modular construction has emerged to help address the challenges posed to the construction industry by stagnant productivity rates and a shortage of skilled labor as it allows for greater automation and for work to be completed in a controlled fabrication shop environment as opposed to on a …

    waterloo Repository record for Impact of Spatial Cognitive Abilities on the Effectiveness of Augmented Reality in Construction and Fabrication (opens in a new tab)

  10. QUADRUPED ROBOT AIDED CONSTRUCTION INSPECTION AND DOCUMENTATION

    … for overseeing and identifying these construction deviations mainly falls on the site supervisor and general contractors, who visually and manually inspect the construction’s progress. This method is time-consuming, expensive, and offers limited productivity and accuracy. Additionally, …

    cornell Repository record for QUADRUPED ROBOT AIDED CONSTRUCTION INSPECTION AND DOCUMENTATION (opens in a new tab)

  11. Productivity Monitoring of Construction Workers Based on Spatiotemporal Activity Recognition

    … is an essential but time-consuming part of large construction projects. Therefore, automating this process using surveillance cameras has gained a lot of interest among researchers. A human observer can extract both detailed and abstract information from surveillance videos to estimate …

    concordia Download PDF for Productivity Monitoring of Construction Workers Based on Spatiotemporal Activity Recognition (opens in a new tab)

  12. Framework for the Strategic Management of Dimensional Variability of Structures in Modular Construction

    Challenges in construction related to dimensional variability exist because producing components and assemblies that have perfect compliance to dimensions and geometry specified in a design is simply not feasible. The construction industry has traditionally adopted tolerances as a way of mitigating …

    waterloo Repository record for Framework for the Strategic Management of Dimensional Variability of Structures in Modular Construction (opens in a new tab)

  13. Rodinný dům

    Tato bakalářská práce má za cíl vypracovat projektovou dokumentaci pro novostavbu rodinného domu ve městě Brně. Novostavba je určena pro jednu jednogenerační rodinu k celoročnímu užívání s možností dočasného ubytování hostů v jednom pokoji. Součástí domu je garáž. Objekt má 2 nadzemní podlaží, je …

    brno-tech Repository record for Rodinný dům (opens in a new tab)