  1. CABLE RELIABILITY OF CABLE-STAYED BRIDGES

    … of the system. James River Bridge, a harp-shaped cable-stayed bridge located 20 miles south-east of Richmond, Virginia is selected in this study. CSIBridge was used for developing a linear elastic model of the bridge to analyze the effect of a moving load during the event of a cable failure and …

    maryland Repository record for CABLE RELIABILITY OF CABLE-STAYED BRIDGES (opens in a new tab)

  2. Cable stayed bridges : nonlinear elastic dimensional analysis

    Cable stayed bridges are the state of the art in long span bridges. Developments in cable response analysis and computer hardware and software have allowed engineers to design and build many cable stayed bridges. Bridges of many different configurations with longer and longer spans are being built. …

    ubc Repository record for Cable stayed bridges : nonlinear elastic dimensional analysis (opens in a new tab) Download PDF for Cable stayed bridges : nonlinear elastic dimensional analysis (opens in a new tab)

  3. Dynamic behaviour of curved cable-stayed bridges

    During the last decades, curved cable-stayed bridges have been regularly accepted due to their ability to cross long spans, for aesthetic reasons because of their enhanced geometric configurations and to the reduced costs involved in the bridge and roof construction. However, such structures are …

    cagliari Repository record for Dynamic behaviour of curved cable-stayed bridges (opens in a new tab)

  4. Wind Induced Vibration of Cable-Stayed Bridges

    本文データは平成22年度国立国会図書館の学位論文(博士)のデジタル化実施により作成された画像ファイルを基にpdf変換したものである

    kyoto Repository record for Wind Induced Vibration of Cable-Stayed Bridges (opens in a new tab)

  5. Time-dependent analysis of cable-stayed bridges

    Cable-stayed bridges are constructed using the cantilever method of construction and generally take a long time to build. In a concrete cable-stayed bridge, concrete properties change with time causing a change in the position of the neutral axis. In different parts of a concrete bridge creep and …

    uiuc Repository record for Time-dependent analysis of cable-stayed bridges (opens in a new tab)

  6. Dynamic and Seismic Characteristics of Cable-Stayed Bridges

    <p>Cable-stayed bridges have been gaining popularity in the last few decades as a viable, efficient, economical and aesthetically appealing design for spanning medium to long crossings. The construction of these bridges in seismic regions has created a need to more fully understand their dynamic …

    mcmaster Repository record for Dynamic and Seismic Characteristics of Cable-Stayed Bridges (opens in a new tab)

  7. Buffeting analysis of cable-stayed bridges during their erection.

    Buffeting response of cable-stayed bridges at their erection stage under yawed wind has attracted engineering attention through wind tunnel observations and studies. Cable-stayed bridges are particularly vulnerable to dynamic wind effects during their construction stages due to the lack of overall …

    ottawa-retro Repository record for Buffeting analysis of cable-stayed bridges during their erection. (opens in a new tab)

  8. Full scale dynamic testing of the Annacis cable stayed bridge

    … and reduced deck bending moments have made cable stayed bridges popular for long spans. Recently; however, large amplitude wind induced cable vibration problems have occurred on several of these long span bridges. One of these bridges had several of its longest cables fitted with discrete …

    ubc Repository record for Full scale dynamic testing of the Annacis cable stayed bridge (opens in a new tab) Download PDF for Full scale dynamic testing of the Annacis cable stayed bridge (opens in a new tab)

  9. A decision model for the erection of cable-stayed bridges

    … is illustrated by a case study of an actual cable-stayed bridge proposed for construction. The erection of the bridge is carried out during a short period compared to the service life of the structure. This difference is a ratio of the order of 1 year to 75 years. It is reasonable to expect …

    ubc Repository record for A decision model for the erection of cable-stayed bridges (opens in a new tab) Download PDF for A decision model for the erection of cable-stayed bridges (opens in a new tab)

  10. Behaviour of Cable-Stayed Bridges with High Modulus CFRP Cables

    A number of cable-stayed bridges have undergone costly cable replacements as a result of cable corrosion. Additionally, steel cables are prone to fatigue due to stress variations under traffic loads. In light of these issues, an interest in alternative cable materials has developed, with carbon …

    ottawa-retro Repository record for Behaviour of Cable-Stayed Bridges with High Modulus CFRP Cables (opens in a new tab)

  11. Active Control of a Cable -Stayed Bridge Against Earthquake Excitations

    The performance of the LQG- and H2-based controllers was less than satisfactory, in the sense that the performance was not as good for the evaluation model as it was for the design model. The controller designed with mu-tools, on the other hand, was robust, and the resulting evaluation criteria …

    uiuc Repository record for Active Control of a Cable -Stayed Bridge Against Earthquake Excitations (opens in a new tab)

  12. Dynamic analysis and active control of two cable-stayed bridge

    … the transient and steady state response of a two cable-stayed bridge has been investigated. The bridge has been modeled as a two degree freedom system in bending and torsion, excited by both buffeting and self-excited loads. The existing suspension cables have been used as active tendons by which …

    vt Repository record for Dynamic analysis and active control of two cable-stayed bridge (opens in a new tab)

  13. Investigation of the Dynamic Performance of a Cable-Stayed Footbridge

    … creation of longer, lighter, slender and stylish Cable-Stayed Foot Bridges (CSFB). Hence, modern CSFB can be characterized by interacting phenomena like cable nonlinearities, deck dynamic instability and deck lateral oscillations due to pedestrian walking. These phenomena, if intertwined, may …

    trento Repository record for Investigation of the Dynamic Performance of a Cable-Stayed Footbridge (opens in a new tab)

  14. Flutter Analysis of Stonecutters Cable-stayed Bridge using Finite Element Model

    … the flutter response of the Stonecutters Cable-Stayed Bridge in Hong Kong, which has a twin deck configuration, under the effect of wind. The aerodynamic instability response of the bridge steel deck of the main span is mainly the focus of the current project. Initially, a complete finite …

    ottawa-retro Repository record for Flutter Analysis of Stonecutters Cable-stayed Bridge using Finite Element Model (opens in a new tab)

  15. Design of a cable-stayed precast post-tensioned box girder bridge

    An overview of current practice in the field of cable-stayed post-tensioned precast box girder technology and construction is presented. Likewise, a preliminary design for a 600 foot main span cable-stayed post-tensioned box girder bridge is presented. The analysis considers dead load, and live …

    vt Repository record for Design of a cable-stayed precast post-tensioned box girder bridge (opens in a new tab)

  16. The performance of hybrid long-span cable stayed bridges using advanced composites

    The development of the cable-stayed bridge central span has almost reached the technical limit for traditional materials, construction technology and bridge system capability. An innovative solution has been proposed in this research, which introduces a new hybrid long span cable stayed bridge …