Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 1 of 1 for “"calcium bromide injection"”

  1. Full scale calcium bromide injection with subsequent mercury oxidation and removal within wet flue gas desulphurization system: experience at a 700 MW coal-fired power facility

    … MW size unit. A lower-cost option involves the injection of activated carbon into an existing cold-side electrostatic precipitator. Both options would incur the cost of activated carbon, upwards of $3M per year. The combination of selective catalytic reduction (SCR) reactors and wet flue gas …

    uab Repository record for Full scale calcium bromide injection with subsequent mercury oxidation and removal within wet flue gas desulphurization system: experience at a 700 MW coal-fired power facility (opens in a new tab)