Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 15 of 15 for “"change proposals"”.

  1. Government management of contractor submission of value engineering change proposals

    … motivation to submit value engineering change proposals. A comparative analysis of the DOD Value Engineering Program with private industry's value analysis program and also an examination of how the Hughes Aircraft Company has used the DOD Value Engineering Program, resulted in three …

    nps Repository record for Government management of contractor submission of value engineering change proposals (opens in a new tab)

  2. NVH Improvement in D4/D6 Marine Diesel Engines: Design Change Proposals to reduce Noise and Vibrations in the D4 and D6 engines

    Noise, Vibration and Harshness (NVH) in marine diesel engines has gained recent attention, and many outboard competitors have shown significant improvements in this area. Optimal NVH standards ensure enhanced performance, environmental sustainability, and passenger comfort. This thesis aims to …

    chalmers Repository record for NVH Improvement in D4/D6 Marine Diesel Engines: Design Change Proposals to reduce Noise and Vibrations in the D4 and D6 engines (opens in a new tab)

  3. A user's manual for the Cost Effectiveness Analysis Model (CEAMOD) version 3.0

    … doing cost effectiveness analysis on Engineering Change Proposals (ECPs) for aircraft engines. The model uses expected values to calculate changes in life cycle costs that result from implementation of the ECP. A detailed analysis of the spreadsheet's calculations is provided to explain to users …

    nps Repository record for A user's manual for the Cost Effectiveness Analysis Model (CEAMOD) version 3.0 (opens in a new tab)

  4. A Study of the Deficiencies of the Federal Budgetary System as it Applies to the United States Air Force

    … is not only possible but essential. Many change proposals have been submitted over the past two decades. Some have been impractical or impossible to inaugurate. However, other proposals, though difficult to apply to existing budget procedures, seem to offer great promise. This thesis is a …

    unm Repository record for A Study of the Deficiencies of the Federal Budgetary System as it Applies to the United States Air Force (opens in a new tab)

  5. Preliminary analysis of the J-52 aircraft engine Component Improvement Program

    … trends for the period 1984-1990. Ten Engineering Change Proposals (SCPs) are then examined. Analysis shows that while only one of the ten ECP related fixes can be directly related to a tangible increase in engine performance, the overall trends have been promising with regard to improving engine …

    nps Repository record for Preliminary analysis of the J-52 aircraft engine Component Improvement Program (opens in a new tab)

  6. Commercial technology for aviation configuration management.

    … engineer the process for approving configuration changes and create an information technology system to manage the process. During this study, I have identified two major challenges to naval aviation configuration policy. They are: (1) the process used to review and approve Engineering Change …

    nps Repository record for Commercial technology for aviation configuration management. (opens in a new tab)

  7. Issues and Challenges in Implementing the 1999 Curriculum for Visual Arts: Case Study in a Junior School.

    … title ‘Visual Arts’, have been quite extensive. Changes to the subject involve a broadening o f subject content. In terms o f pedagogy, the 1999 curriculum for Visual Arts calls for a return to the child-centred, heuristic, teacherfacilitated methods espoused in the 1971 curriculum and emphasises …

    maynooth Download PDF for Issues and Challenges in Implementing the 1999 Curriculum for Visual Arts: Case Study in a Junior School. (opens in a new tab)

  8. Design of Front Cab Suspension System for a New Generation Volvo Trucks

    … till the product is launched which results in change of boundary conditions during the thesis project. This report complies with the changes made till January 2005. The thesis work starts with the product planning phase, where all the requirements of the product are established, analysis of the …

    chalmers Repository record for Design of Front Cab Suspension System for a New Generation Volvo Trucks (opens in a new tab)

  9. ‘Talk about constitutional government in New Zealand’: New Zealand’s Constitution in Hansard, 1854-2020

    … Because NZ’s whole constitution could perhaps be changed by simple parliamentary majority, this thesis describes the history of constitutional thought, as expressed by NZ’s MPs in the 536,079,187 words of Hansard compiled between 1854 and 2020. I ask three questions of the debates: what is NZ’s …

    auckland-ms Repository record for ‘Talk about constitutional government in New Zealand’: New Zealand’s Constitution in Hansard, 1854-2020 (opens in a new tab)

  10. Relational and technological process concept utilizing a human-in-the-loop-centered methodology for USSOCOM

    … needs through initiatives like Engineering Change Proposals (ECPs) as well as assist starter models for new programs and projects. The containment tree format aids in developing USSOCOM MBSE and opens possibilities for automation tools as well as an easily transferrable modeling package for …

    colostate Repository record for Relational and technological process concept utilizing a human-in-the-loop-centered methodology for USSOCOM (opens in a new tab)

  11. Ownership, organizational politics and information systems

    … scope of system development or organizational change and ownership perceptions to the likelihood of political difficulties. It then explores the links to organizational theory. The applicability and usefulness of the model is then argued through its application to a variety of case drawn from …

    unsw Repository record for Ownership, organizational politics and information systems (opens in a new tab)

  12. Leadership and social change: a contest for influence

    Social change is fundamentally a process of collective mobilization—of standing up for what ‘we’ believe in and against which that violates the values that define who ‘we’ are. Leaders play a central role in mobilizing social change. It is through a process of social influence that such a ‘we’ is …

    anu Repository record for Leadership and social change: a contest for influence (opens in a new tab)

  13. Návrh změn marketingového mixu společnosti

    Táto bakalárska práca sa zaoberá návrhom zmien marketingového mixu spoločnosti Golden Gate CZ a.s., ktorá sa zameriava na predaj investičných kovov, kryptomien a investičných fondov, pričom hlavným produktom spoločnosti sú investičné kovy. Teoretická časť poskytuje podklady z odbornej literatúry, …

    brno-tech Repository record for Návrh změn marketingového mixu společnosti (opens in a new tab)

  14. Posouzení informačního systému firmy a návrh změn

    Diplomová práce je zaměřena na posouzení informačního systému společnosti a návrh změn vedoucích k zefektivnění chodu firmy. První kapitola je věnována teoretickým východiskům z oblasti informačních systémů a strategické analýzy. Druhá část analyzuje vnitřní a vnější prostředí společnosti a její …

    brno-tech Repository record for Posouzení informačního systému firmy a návrh změn (opens in a new tab)

  15. ES-3A aircraft Navy developmental testing

    … to be implemented in future engineering change proposals will be required to utilize Link-11, SATCOM and the ARC-182 No. 1 BUCC. Link-11, and AN/ALR-76 will require additional mission software improvements to enable the ES-3A to reach its full TEW&R potential. Specifically, the Link-11 …

    ut-knoxville Repository record for ES-3A aircraft Navy developmental testing (opens in a new tab)