Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 6 of 6 for “"claim management"”.

  1. A simulation of case management operations at the Workers' Compensation Board: a decision support tool for human resource allocation

    … project aims at developing a simulation model of claim management operations to facilitate decision-making in resource allocation. In this context, resource allocation refers to the alignment of staff to claims. The components of the problem include the number of staff required and the types of …

    ubc Repository record for A simulation of case management operations at the Workers' Compensation Board: a decision support tool for human resource allocation (opens in a new tab) Download PDF for A simulation of case management operations at the Workers' Compensation Board: a decision support tool for human resource allocation (opens in a new tab)

  2. Ethik, Ökonomie und faire Preise – Eine explorative Analyse der Wirkungszusammenhänge im Schweizer Baugewerbe

    … extent to which ethics in the form of an Ethics Management System (EMS) can support construction economics in fair pricing. A critical review of the literature on ethics, economics, and pricing management in the Swiss construction industry reveals that the economic market mechanism is unable to …

    middlesex Download PDF for Ethik, Ökonomie und faire Preise – Eine explorative Analyse der Wirkungszusammenhänge im Schweizer Baugewerbe (opens in a new tab)

  3. Gestión de Controversias aplicadas en un Contrato a Suma Alzada en la modalidad de ejecución Fast Track para un Proyecto Privado de Infraestructura de Salud en el Norte del Perú

    El Trabajo de Investigación presenta el caso de la construcción de una clínica en el norte del país, que empezó como un proyecto con un alcance definido y con un contrato a suma alzada, pero que durante la ejecución y por iniciativa del propietario se dieron tantos cambios que lo convirtieron en la …

    upc-peru Repository record for Gestión de Controversias aplicadas en un Contrato a Suma Alzada en la modalidad de ejecución Fast Track para un Proyecto Privado de Infraestructura de Salud en el Norte del Perú (opens in a new tab)

  4. Delay-caused claims in infrastructure projects under design-bid-build delivery systems

    Delay-caused claims lead to cost overruns in infrastructure projects due to the cost of construction time and impacts on related services. The purpose of this study was to evaluate the causes and effects of these claims on road and bridge projects and to create an effective claims management …

    colostate Repository record for Delay-caused claims in infrastructure projects under design-bid-build delivery systems (opens in a new tab)

  5. Propuesta de mejora en la gestión de pedidos y reclamos de una empresa del sector bancario

    El presente trabajo aborda la gestión ineficiente de pedidos y reclamos de una entidad del sector bancario peruano. El problema central radica en la actual dependencia de las tiendas físicas para la atención de estos requerimientos. Esta situación genera un uso inadecuado del tiempo del personal de …

    upc-peru Repository record for Propuesta de mejora en la gestión de pedidos y reclamos de una empresa del sector bancario (opens in a new tab) Restricted access

  6. Využití finanční analýzy ve finančním rozhodování

    Diplomová práce analyzuje finanční situaci podniku v letech 2002 - 2006 na základě vybraných metod finanční analýzy. Cílem je odhalení problematických oblastí. Je provedena analýza současného stavu řízení pohledávek a navržení možných způsobů zlepšení řízení pohledávek v podniku.

    brno-tech Repository record for Využití finanční analýzy ve finančním rozhodování (opens in a new tab)