Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 9 of 9 for “"column construction"”

  1. Kavos aparatų gamybos cechas Šilalėje /

    … PART; 2. THE CALCULATION OF HOLDING CONSTRUCTIONS; 3. TECHNOLOGICAL AND ECONOMICAL PART; 4. CALCULATION OF THE BUILDING’S HEATING SYSTEM The plot of factory, detailed map, the general information about the buildings, facade, constructions of the building and engineering communications …

    vilnius Repository record for Kavos aparatų gamybos cechas Šilalėje / (opens in a new tab)

  2. Slender reinforced concrete columns.

    The analysis of slender reinforced concrete columns is complicated because the non-linearities o f the materials (caused by the cracking o f concrete and time-dependent effects) are combined with the geometric non-linearity which characterises the behaviour of such columns. A simple, analytical …

    whiterose Repository record for Slender reinforced concrete columns. (opens in a new tab)

  3. Liquefaction Mitigation in Silty Sands at Salmon Lake Dam Using Stone Columns and Wick Drains

    Stone columns are an established method of liquefaction mitigation in clean sands (fines content <15%). Although stone columns are considered less effective in silty soils, an increase in the area replacement ratio or the addition of wick drains may still produce improvement in the normalized blow …

    byu Repository record for Liquefaction Mitigation in Silty Sands at Salmon Lake Dam Using Stone Columns and Wick Drains (opens in a new tab)

  4. Integrating design and construction to improve constructability through an effective usage of IT

    … that bridging the gap between design andconstruction is essential for improving product quality, cost, lead time, andmaterials waste. The design of buildings has been separated from its productionsince at least the mid 19th century with professions growing up reinforcing thisdivision. The …

    salford Repository record for Integrating design and construction to improve constructability through an effective usage of IT (opens in a new tab)

  5. Integrating design and construction to improve constructability through an effective usage of IT

    … that bridging the gap between design andconstruction is essential for improving product quality, cost, lead time, andmaterials waste. The design of buildings has been separated from its productionsince at least the mid 19th century with professions growing up reinforcing thisdivision. The …

    salford Repository record for Integrating design and construction to improve constructability through an effective usage of IT (opens in a new tab)

  6. The use of recycled and secondary aggregates within granular columns

    The construction industry utilises 90 % of aggregates. It is recognised that the overuse or mismanagement of a resource can lead to its depletion or exhaustion. The reliance of the construction industry on primary aggregates is unsustainable and the overexploitation of sand and other primary …

    birmingham Repository record for The use of recycled and secondary aggregates within granular columns (opens in a new tab)

  7. Rodinný dům

    Navrhovaný rodinný dům je součástí nové rozvojové plochy ležící v těsné blízkosti existujícího výrobního areálu Woodcomp, specializujícího se na výrobu leteckých vrtulí. Projekt se nachází v městské části Dolínek v Odolené Vodě, v oblasti s rozlohou přibližně 700-1000 m², která se mírně svažuje k …

    cz-tech Repository record for Rodinný dům (opens in a new tab)

  8. Bytový dům s polyfunkcí

    Předmětem řešení diplomové práce je novostavba bytového domu s polyfunkcí. Jedná se o podsklepený čtyřpodlažní objekt. Konstrukční systém je sloupový s monolitickými železobetonovými stropy a jednoplášťovou střechou. V podzemním podlaží se nachází hromadná garáž. V přízemí je na jižní straně …

    brno-tech Repository record for Bytový dům s polyfunkcí (opens in a new tab)

  9. Prodejní a skladová hala VaP Bransouze ve Znojmě, hrubá vrchní stavba

    Tato bakalářská práce řeší technologickou etapu hrubé vrchní stavby prodejní a skladové haly VaP Bransouze s.r.o. ve Znojmě. Práce obsahuje technikou zprávu, zařízení staveniště, výkaz výměr, technologický předpis, organizaci výstavby, časové plánování, návrh strojní sestavy, kontrolní a zkušební …

    brno-tech Repository record for Prodejní a skladová hala VaP Bransouze ve Znojmě, hrubá vrchní stavba (opens in a new tab)