Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 13 of 13 for “"connection conditions"”.

  1. Seismic performance of concrete wall-steel beam connections

    … guidelines for concrete wall-steel beam connections, underscores the need for comprehensive research to ensure that these structures behave as intended during earthquakes. Bolted web plate connections, commonly found in steel framing systems, are typically used to connect steel beams to …

    auckland-ms Repository record for Seismic performance of concrete wall-steel beam connections (opens in a new tab)

  2. The political representation cycle and citizen satisfaction with the Democratic process

    … individual characteristics - personal economic conditions, whether a voter identifies with a winning political party, etc. - or institutional structures to determine what drives the level of satisfaction with democracy in a country. The former explanations are unable to account for systematic …

    missouri Repository record for The political representation cycle and citizen satisfaction with the Democratic process (opens in a new tab)

  3. Multi-agent reinforcement learning for inter-cell interference management in hotspots scenarios

    … dense urban environments and massive connection conditions. The results show that the proposed framework consistently outperforms static and single-agent baselines, achieving throughput gains of up to 99.4%, particularly under high-interference conditions and for low-performing users. …

    brazil-ufrn Repository record for Multi-agent reinforcement learning for inter-cell interference management in hotspots scenarios (opens in a new tab)

  4. Time-dependent behavior of pin-bearing bolted connections in pultruded fiber reinforced polymer composites under normal and elevated temperatures

    … systems made of FRP materials requires connections between elements; these connections must be considered when assessing the overall behavior of the structure. A large number of previous studies have focused on the influence of various connection parameters on the short-term response of …

    gatech Repository record for Time-dependent behavior of pin-bearing bolted connections in pultruded fiber reinforced polymer composites under normal and elevated temperatures (opens in a new tab)

  5. Experimental and numerical investigation of human-induced vibration performance in mass timber office buildings

    … a tool to assess the impact of various boundary/connection conditions and material input parameters suggested in various design guides. In particular, the effect of parameters such as the dynamic modulus of concrete, shear stiffness of the glulam beam-to-CLT and CLT-to-concrete connectors, and …

    uvic Repository record for Experimental and numerical investigation of human-induced vibration performance in mass timber office buildings (opens in a new tab)

  6. Assessment of Steel Truss Bridges Using Distributed Strain Measurements

    … optic sensors and linear potentiometers. The connection conditions were varied by either removing or loosening bolts between vertical and diagonal members. A response change was detected by both sensor technologies when all bolts were loosened versus tightened. Varying degrees of corrosion and …

    queens Repository record for Assessment of Steel Truss Bridges Using Distributed Strain Measurements (opens in a new tab)

  7. Multidimensional and High Frequency Heat Flux Reconstruction Applied to Hypersonic Transitional Flows

    … the Green's function is obtained independently. Connection conditions for the system Green's function are derived by imposing continuity of heat flux and temperature concurrently at all interfaces. The solution heat flux is decomposed on a space-time basis with the temporal basis a …

    vt Repository record for Multidimensional and High Frequency Heat Flux Reconstruction Applied to Hypersonic Transitional Flows (opens in a new tab)

  8. Ανάπτυξη μεθόδου για τον παραμετρικό σχεδιασμό Tensegrity πλεγμάτων διπλής καμπυλότητας: γεωμετρική επίλυση και ψηφιακή απεικόνιση

    … two layers of the network, to ensure the proper connection conditions of the units. For the development of the outer layer of the network various processes based on the application of conformal mapping projections are tested, focusing mainly on Mercator projection. Specifically, the methods are …

    greece Repository record for Ανάπτυξη μεθόδου για τον παραμετρικό σχεδιασμό Tensegrity πλεγμάτων διπλής καμπυλότητας: γεωμετρική επίλυση και ψηφιακή απεικόνιση (opens in a new tab)

  9. Měřicí systém pro terénní zkoušky souladu fotovoltaických elektráren

    S nárůstem počtu obnovitelných zdrojů energie byly na nové instalace kladeny nové požadavky na jejich řízení, ať už autonomní (reagující na podmínky v místě připojení) nebo dispečerské. Důležitým krokem pro uvedení fotovoltaických elektráren (FVE) do provozu je provedení zkoušek souladu, které je …

    brno-tech Repository record for Měřicí systém pro terénní zkoušky souladu fotovoltaických elektráren (opens in a new tab)

  10. Analýza hraničních stavů distribuční sítě s vysokým počtem fotovoltaických zdrojů

    Diplomová práce navrhuje změny v posuzování připojitelnosti nových zdrojů do distri-buční soustavy. Ve vyhodnocovacím procesu uvažuje reálnější model fotovoltaického zdroje s proměnlivým výkonem v průběhu času v závislosti na lokálních podmínkách. Tento model je aplikován na reálnou oblast a práce …

    brno-tech Repository record for Analýza hraničních stavů distribuční sítě s vysokým počtem fotovoltaických zdrojů (opens in a new tab)

  11. Analýza hraničních stavů distribuční sítě s vysokým počtem fotovoltaických zdrojů

    Diplomová práce navrhuje změny v posuzování připojitelnosti nových zdrojů do distri-buční soustavy. Ve vyhodnocovacím procesu uvažuje reálnější model fotovoltaického zdroje s proměnlivým výkonem v průběhu času v závislosti na lokálních podmínkách. Tento model je aplikován na reálnou oblast a práce …

    brno-tech Repository record for Analýza hraničních stavů distribuční sítě s vysokým počtem fotovoltaických zdrojů (opens in a new tab)

  12. Elektroprojekt rodinného domu s fotovoltaickým systémem

    Bakalářská práce se zabývá zpracováním projektové dokumentace elektroinstalace rodinného domu s fotovoltaickým systémem. Práce je rozdělena na teoretickou a projektovou část. V teoretické části jsou uvedeny požadavky platné legislativy, technických norem a připojovacích podmínek. Dále jsou popsány …

    brno-tech Repository record for Elektroprojekt rodinného domu s fotovoltaickým systémem (opens in a new tab)

  13. Posouzení možnosti připojení nového zdroje z hlediska napěťových poměrů

    Připojení nových zdrojů elektrické energie do sítě je důležité pro stávající síť z důvodu její zatížitelnosti a dimenzování. Je třeba zhodnotit, zda možnost připojení nového zdroje do sítě je reálná a neohrožující plynulý chod distribuční soustavy. Tato práce má ukázat jaké podmínky je potřeba …

    brno-tech Repository record for Posouzení možnosti připojení nového zdroje z hlediska napěťových poměrů (opens in a new tab)