Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 20 of 36 for “"construction execution"”
-
BIM planner : a digital BIM and Lean Construction based prototype to control construction execution
… industries. In Architecture, Engineering, and Construction (AEC) industry, the guidelines, and philosophies, such as Building Information Modelling (BIM) or Lean Construction (LC), implementation is leading Industry 4.0. Moreover, the combined use of BIM and LC with digital tools increases the …
-
An Integrated Framework for Selecting the Optimum Sustainable Construction Execution Strategy Using Genetic Algorithm
Planning is a vital stage in construction, involving decisions that determine success or failure, such as setting objectives, allocating resources, scheduling, and assessing risk, all of which influence the project's direction. Poor planning can lead to cost overruns, delays, and quality issues, …
-
From physical site to digital insight; Real-time site data and digital twins for project management in the construction execution phase
The construction industry is characterized by complexity and fragmented informa tion flows. At the same time, the sector continues to face challenges related to delays, cost overruns, and safety risks during the execution phase. This study aims to evaluate the potential of vision-based Digital Twin …
-
A Static Scheduler for critical timing constraints
… of a software system through the development and execution of a prototype of the system under construction. Execution of the prototype is controlled by an Execution Support System (ESS) within the framework of CAPS. One of the critical elements of the ESS is the Static Scheduler which extracts …
-
Contractors’ Perspectives on Airfield and Highway Hot Mix Asphalt Pavement Projects
… and involve different management styles, construction execution methods, and project specifications. Failure to consider and quantify project differences may cause delays and financial repercussions. Therefore, this research answers the question, “From a paving contractor’s perspective, …
-
GESTÃO DE ATENDIMENTO AMBULATORIAL CENTRALIZADO EM EMPREENDIMENTO COM MÚLTIPLOS PRESTADORES DE SERVIÇO TERCEIRIZADOS: UM ESTUDO DE CASO DE UM EMPREENDIMENTO PARA REFINARIA
… multiple companies engaged simultaneously in the construction execution. It examines the gains and difficulties with the implementation of a pioneering model for centralized service ambulatory of all the outsourced companies employees, in order to execute a project to modernize any Refinery. The …
-
Instabilidade e projetos de vida: as incertezas do mundo no caminho dos estudantes do ensino médio
… They can influence these young people in the construction, execution and conquest of their projects: instability and individualization process. Objective: The present research has three objectives: to analyze and discuss the future expectations that high school students and high school …
-
Defects on Building Facades in Desa Bakti Employee Housing, Universiti Teknologi Malaysia, Skudai, Johor, Malaysia
… various flaws and lacking such as design defect, construction, execution of work, material’s performance/selection etc. As building façade is exposed to the weather and environment so that defects can easily occur on it, especially in the tropical region. Studies have proved that the common …
-
Automatic progress monitoring using sensing technologies and building information modeling in precast construction
Precast construction demands strict dimensional tolerances and tightly coordinated logistics, yet monitoring practice remains largely manual and fragmented. This research presents a comprehensive framework that integrates advanced sensing technologies with Building Information Modeling (BIM) to …
-
Proof-of-Concept: Safety Hazard Identification and Impact Minimization Using 3D BIM and VR Devices Through the Case-Studies
Construction hazard is a global issue. Despite numerous research studies, safety guidelines and procedures, fatalities and severe injuries still occur on construction job sites. This research has been performed to identify the research gaps and potentially improve worker behavior along the most …
-
A Deep Learning Approach for Forecasting Cost Estimate at Completion (EAC) in Construction Projects
… relationships, and financial losses for construction execution companies. To improve cost forecasting accuracy, this research proposes a deep-learning framework structured into five phases, starting with exploring the literature review and finishing with the practical application of the …
-
Verifying information flow and metaprogramming in dynamically typed languages
… a formalism that captures the construction, execution and manipulation of code templates. The resulting language is called SLamJS. An information flow analysis for SLamJS is developed and its correctness is proved. This builds on the existing analysis 0CFA, but adds support for …
-
Avaliação de desempenho humano individual e em equipe em simulações interativas distribuídas de treinamento
… s Computer Department, to support the modeling, construction, execution, management and control of complex training simulations, using emergency preparedness and response as application areas. This work is part of that system and aims to create an individual and/or group performance evaluation …
-
Decision Making in the Oil and Gas Construction Project Management: Structured VS Discretionary
… from significant and unreasonable delays in construction project execution. The project's planning part goes to its final stages, but the implementation phase gets stagnated due mostly to delay in decision-making. Objectives/Amis: Investigating the potential impact of five factors influencing …
-
Site-level integration of information technologies in construction : an empirical study of information technology adoption
… (IT) that can be harnessed to support construction projects at the site-level (e.g. tablets devices) continues to increase substantially. Most computer devices and IT resources today are designed for mobility, providing construction onsite personnel potential access to electronic …
-
Un ambiente de aprendizaje desde la perspectiva socio-critica de la modelación matemática: pensando la competencia democrática en el aula de clase
This research presents the construction, execution and reflection on a learning environment within the framework of the mathematics class, oriented to the exploration of the development of democratic competence with students of the 3-04 year 2022 course of the Alberto Castilla Business Technical …
-
Re-framing : an investigation of performance at the intersection of space
… The analysis formulates the process of construction, execution and reception of the performances in terms of a number of interesting and interacting spaces. The focus is on the practice and effects of creating combinations and interactions between these otherwise discreet spaces. The …
-
Investigating students’ use of mathematical tools and representations in undergraduate physics problem-solving
… use a modified version of the ACER (Activation-Construction-Execution-Reflection) framework to analyze students’ solutions and to identify patterns of mathematical skill use on traditional problems. We apply techniques borrowed from network analysis and the Resources Framework to build a …
-
Research-based assessment design in physics: including scientific practices and feedback for physics faculty
… students' responses using the ACER (Activation-Construction-Execution-Reflection) framework. Our assessment tasks elicited students' abilities to intertwine concepts with mathematics and written solutions elicited evidence of their abilities to intertwine them most of the time. We present a …
-
Assessing advanced work packaging in industrial construction - quantitative evidence and qualitative investigation of implementation
Industrial construction projects face persistent productivity and predictability challenges: most projects exceed their authorized budgets, and only about one-third of construction field time is spent on direct work, the portion of a craft worker’s time that physically advances the project scope. …
Page 1 of 2