Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 78 for “"construction schedule"”.

  1. Toward the development of a knowledge-based construction schedule planning system

    … a knowledge-based system for use in the construction industry to accomplish the automatic generation of initial construction schedules. The schedule can be transformed into a logical network that provides a physical representation of the construction operations plan. The prototype system, …

    must-thes Repository record for Toward the development of a knowledge-based construction schedule planning system (opens in a new tab)

  2. Assessment of highway construction schedule review problems of Departments of Transportation : case study of Texas

    Schedule review is an important aspect of schedule management for the owners like the state Department of Transportation (DOTs) to successfully deliver projects on time. However, the quality of schedules submitted by the contractors varies greatly, without having the required formats and …

    texas Repository record for Assessment of highway construction schedule review problems of Departments of Transportation : case study of Texas (opens in a new tab)

  3. Autonomous Robot-Enabled Data Collection, Classification, and Processing Method for Real-Time Construction Schedule Updating

    … advancements in the manufacturing sector, the construction industry has been lagging in adopting computer-aided and robotic technologies. This has resulted in inefficient and unproductive construction procedures not being fully addressed. Construction progress tracking is an essential part of …

    gatech Repository record for Autonomous Robot-Enabled Data Collection, Classification, and Processing Method for Real-Time Construction Schedule Updating (opens in a new tab)

  4. Examining opportunities to improve the pre-construction schedule performance of Seattle Public Utilities scope in Seattle Department of Transportation capital projects

    … and analyzes opportunities to improve the schedule performance of the City of Seattle’s water, sewer, and drainage improvements that are delivered through transportation capital projects. This issue is particularly salient, as Seattle’s water, sewer, and garbage ratepayers are spending over …

    washington Repository record for Examining opportunities to improve the pre-construction schedule performance of Seattle Public Utilities scope in Seattle Department of Transportation capital projects (opens in a new tab)

  5. Impacts of internal communication on dynamic schedules in mega highway projects

    Traditionally, construction project management has consisted of three main areas of focus: 1- cost, 2- schedule, and 3- quality. This style of project management primarily developed for new projects has changed during the development and maintenance of transportation infrastructure projects in past …

    ubc Repository record for Impacts of internal communication on dynamic schedules in mega highway projects (opens in a new tab) Download PDF for Impacts of internal communication on dynamic schedules in mega highway projects (opens in a new tab)

  6. Recognition, modeling and pricing of flexibility in construction of cave mining systems

    … with numerous challenges in maintaining their construction schedule expectations. Any delay in construction impacts on the production schedule and, in turn, reduces the project value. In order to increase the expected economic value, the construction schedule needs to be accelerated through …

    ubc Repository record for Recognition, modeling and pricing of flexibility in construction of cave mining systems (opens in a new tab) Download PDF for Recognition, modeling and pricing of flexibility in construction of cave mining systems (opens in a new tab)

  7. Benefits and Barriers of Offsite Construction in Hospital Projects

    … methods to realize these benefits on their construction projects. One area that project owners continue to look at is modular construction. This study set out to understand the benefits and barriers of using modular construction on hospital projects. Despite the abundance of research related …

    washington Repository record for Benefits and Barriers of Offsite Construction in Hospital Projects (opens in a new tab)

  8. Effect of Porosity on the Creep Rupture Behavior of Low Alloy Steel Weldments.

    … materials. The resulting loss of productivity construction schedule delays, and of course, costs for rework more than adequately justify a careful scrutiny of welding acceptance standards.

    uab Repository record for Effect of Porosity on the Creep Rupture Behavior of Low Alloy Steel Weldments. (opens in a new tab)

  9. Timelining the Construction in Immersive Virtual Reality System Using BIM Application

    Architectural, Engineering, and Construction (AEC) industry has been using 4D construction models (graphical illustration of the construction of a 3D building design with time as the 4th dimension) for many years to improve an existing construction schedule by identifying inconsistencies and out of …

    tamu Repository record for Timelining the Construction in Immersive Virtual Reality System Using BIM Application (opens in a new tab)

  10. Custom residential housing construction : a case study.

    … Builders, Inc. (a successful custom home construction firm in Gainesville, Florida). The goal was to broaden my technical engineering knowledge and gain practical construction experience. The majority of time was spent developing a critical path construction schedule for a typical home. …

    nps Repository record for Custom residential housing construction : a case study. (opens in a new tab)

  11. A Comparison of Predicted Brace Loads in Temporary Retaining Structures and Observed Brace Loads in Two Full Scale Test Sections

    … U.S. Army Corps of Engineers (USACE) during the construction of two covered canals in New Orleans, Louisiana. At each site, a cast-in-place concrete culvert was constructed within a sheeted and braced excavation. Information provided by Eustis Engineering Company to the USACE is presented …

    uno Repository record for A Comparison of Predicted Brace Loads in Temporary Retaining Structures and Observed Brace Loads in Two Full Scale Test Sections (opens in a new tab)

  12. Meeting the challenge of installing CANES during new ship construction on LPD 28

    … Furnished Equipment (GFE) supporting the Ship Construction schedule. This thesis analyzes whether to install the legacy Shipboard Wide Area Network (SWAN), where the FGI is firm, or install the newer Consolidated Afloat Network Enterprise System (CANES), where the GFI is evolving, on LPD 28 …

    nps Repository record for Meeting the challenge of installing CANES during new ship construction on LPD 28 (opens in a new tab)

  13. Developing a framework for using artificial intelligence to update and maintain 4D BIM schedules

    Natural language interfaces can transform the construction industry by enhancing accessibility and reducing administrative workload in the day-to-day operations of project teams. This thesis introduces the Voice-Integrated Scheduling Assistant for 4D BIM (VISA4D) tool that integrates speech …

    manitoba Repository record for Developing a framework for using artificial intelligence to update and maintain 4D BIM schedules (opens in a new tab)

  14. Analysis of Liquidated Damages Provisions of Highway Standard Specifications in the USA

    A construction schedule is a plan outlining the order and timing of the activities ofconstruction in a project. Specifications may stipulate a course of action or penalties if the progress of work falls short of the defined Schedule. To ensure uniform state-wide guidelines in construction, each …

    washington Repository record for Analysis of Liquidated Damages Provisions of Highway Standard Specifications in the USA (opens in a new tab)

  15. A contextual AR model based system on-site construction planning

    The creation of an effective construction schedule is fundamental to the successful completion of a construction project. Effectively communicating the temporal and spatial details of this schedule are vital, however current planning approaches often lead to multiple or misinterpretations of the …

    wlv Repository record for A contextual AR model based system on-site construction planning (opens in a new tab) Download file for A contextual AR model based system on-site construction planning (opens in a new tab)

  16. Assessment of rapid, non-nuclear compaction control devices

    … it is very rapid and thus does not delay the construction schedule. However, due to increased regulatory restrictions and growing concerns over the safety of using a device with a nuclear source, there is an increased effort to find a possible alternative to the nuclear gauge for compaction …

    texas Repository record for Assessment of rapid, non-nuclear compaction control devices (opens in a new tab) Restricted access

  17. Stakeholder Perception on Supply Chain Coordination in Prefabricated Building Projects

    The construction industry is becoming more complex and uncertain. More projects are directed towards being fully or partially prefabricated projects due to the lack of skilled labor, shortening the construction schedule and time, better quality and environment control, and reducing the cost, …

    washington Repository record for Stakeholder Perception on Supply Chain Coordination in Prefabricated Building Projects (opens in a new tab)

  18. Desenvolvimento de um sistema de planejamento, gestão de serviços e controle de custos em obras de construção civil

    The increasing competitiveness of the construction industry, set in an economic environment in which the offer is now greater than the demand , causes the prices of many products and services, are strongly influenced by the processes of production and the final consumer. Thus, to become more …

    brazil-ufrn Repository record for Desenvolvimento de um sistema de planejamento, gestão de serviços e controle de custos em obras de construção civil (opens in a new tab)

  19. Staging of investment in desalination facilities and associated storage facilities.

    … for the arrival at an optimum and feasible construction schedule hold the answer to the decision question: how much to build and when. The application of the time-capacity approach is used in the problem of staging of investment in desalination capacity and associated storage facilities. The …

    arizona-thes Repository record for Staging of investment in desalination facilities and associated storage facilities. (opens in a new tab)

  20. THE EFFECT OF PROJECT SPECIFIC VARIABLES ON THE LEVEL OF DETAIL OF CONSTRUCTION SCHEDULES

    Schedule is an important tool used in the planning and control of projects. Effective use of scheduling can improve productivity and result in savings for the client and the contractor. The lower costs and increasing efficiency of computers and software have helped in popularizing the use of …

    nus Repository record for THE EFFECT OF PROJECT SPECIFIC VARIABLES ON THE LEVEL OF DETAIL OF CONSTRUCTION SCHEDULES (opens in a new tab) Download file for THE EFFECT OF PROJECT SPECIFIC VARIABLES ON THE LEVEL OF DETAIL OF CONSTRUCTION SCHEDULES (opens in a new tab)

Page 1 of 4