Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 78 for “"construction schedule"”.
-
Toward the development of a knowledge-based construction schedule planning system
… a knowledge-based system for use in the construction industry to accomplish the automatic generation of initial construction schedules. The schedule can be transformed into a logical network that provides a physical representation of the construction operations plan. The prototype system, …
-
Assessment of highway construction schedule review problems of Departments of Transportation : case study of Texas
Schedule review is an important aspect of schedule management for the owners like the state Department of Transportation (DOTs) to successfully deliver projects on time. However, the quality of schedules submitted by the contractors varies greatly, without having the required formats and …
-
Autonomous Robot-Enabled Data Collection, Classification, and Processing Method for Real-Time Construction Schedule Updating
… advancements in the manufacturing sector, the construction industry has been lagging in adopting computer-aided and robotic technologies. This has resulted in inefficient and unproductive construction procedures not being fully addressed. Construction progress tracking is an essential part of …
-
Examining opportunities to improve the pre-construction schedule performance of Seattle Public Utilities scope in Seattle Department of Transportation capital projects
… and analyzes opportunities to improve the schedule performance of the City of Seattle’s water, sewer, and drainage improvements that are delivered through transportation capital projects. This issue is particularly salient, as Seattle’s water, sewer, and garbage ratepayers are spending over …
-
Impacts of internal communication on dynamic schedules in mega highway projects
Traditionally, construction project management has consisted of three main areas of focus: 1- cost, 2- schedule, and 3- quality. This style of project management primarily developed for new projects has changed during the development and maintenance of transportation infrastructure projects in past …
-
Recognition, modeling and pricing of flexibility in construction of cave mining systems
… with numerous challenges in maintaining their construction schedule expectations. Any delay in construction impacts on the production schedule and, in turn, reduces the project value. In order to increase the expected economic value, the construction schedule needs to be accelerated through …
-
Benefits and Barriers of Offsite Construction in Hospital Projects
… methods to realize these benefits on their construction projects. One area that project owners continue to look at is modular construction. This study set out to understand the benefits and barriers of using modular construction on hospital projects. Despite the abundance of research related …
-
Effect of Porosity on the Creep Rupture Behavior of Low Alloy Steel Weldments.
… materials. The resulting loss of productivity construction schedule delays, and of course, costs for rework more than adequately justify a careful scrutiny of welding acceptance standards.
-
Timelining the Construction in Immersive Virtual Reality System Using BIM Application
Architectural, Engineering, and Construction (AEC) industry has been using 4D construction models (graphical illustration of the construction of a 3D building design with time as the 4th dimension) for many years to improve an existing construction schedule by identifying inconsistencies and out of …
-
Custom residential housing construction : a case study.
… Builders, Inc. (a successful custom home construction firm in Gainesville, Florida). The goal was to broaden my technical engineering knowledge and gain practical construction experience. The majority of time was spent developing a critical path construction schedule for a typical home. …
-
A Comparison of Predicted Brace Loads in Temporary Retaining Structures and Observed Brace Loads in Two Full Scale Test Sections
… U.S. Army Corps of Engineers (USACE) during the construction of two covered canals in New Orleans, Louisiana. At each site, a cast-in-place concrete culvert was constructed within a sheeted and braced excavation. Information provided by Eustis Engineering Company to the USACE is presented …
-
Meeting the challenge of installing CANES during new ship construction on LPD 28
… Furnished Equipment (GFE) supporting the Ship Construction schedule. This thesis analyzes whether to install the legacy Shipboard Wide Area Network (SWAN), where the FGI is firm, or install the newer Consolidated Afloat Network Enterprise System (CANES), where the GFI is evolving, on LPD 28 …
-
Developing a framework for using artificial intelligence to update and maintain 4D BIM schedules
Natural language interfaces can transform the construction industry by enhancing accessibility and reducing administrative workload in the day-to-day operations of project teams. This thesis introduces the Voice-Integrated Scheduling Assistant for 4D BIM (VISA4D) tool that integrates speech …
-
Analysis of Liquidated Damages Provisions of Highway Standard Specifications in the USA
A construction schedule is a plan outlining the order and timing of the activities ofconstruction in a project. Specifications may stipulate a course of action or penalties if the progress of work falls short of the defined Schedule. To ensure uniform state-wide guidelines in construction, each …
-
A contextual AR model based system on-site construction planning
The creation of an effective construction schedule is fundamental to the successful completion of a construction project. Effectively communicating the temporal and spatial details of this schedule are vital, however current planning approaches often lead to multiple or misinterpretations of the …
-
Assessment of rapid, non-nuclear compaction control devices
… it is very rapid and thus does not delay the construction schedule. However, due to increased regulatory restrictions and growing concerns over the safety of using a device with a nuclear source, there is an increased effort to find a possible alternative to the nuclear gauge for compaction …
-
Stakeholder Perception on Supply Chain Coordination in Prefabricated Building Projects
The construction industry is becoming more complex and uncertain. More projects are directed towards being fully or partially prefabricated projects due to the lack of skilled labor, shortening the construction schedule and time, better quality and environment control, and reducing the cost, …
-
Desenvolvimento de um sistema de planejamento, gestão de serviços e controle de custos em obras de construção civil
The increasing competitiveness of the construction industry, set in an economic environment in which the offer is now greater than the demand , causes the prices of many products and services, are strongly influenced by the processes of production and the final consumer. Thus, to become more …
-
Staging of investment in desalination facilities and associated storage facilities.
… for the arrival at an optimum and feasible construction schedule hold the answer to the decision question: how much to build and when. The application of the time-capacity approach is used in the problem of staging of investment in desalination capacity and associated storage facilities. The …
-
THE EFFECT OF PROJECT SPECIFIC VARIABLES ON THE LEVEL OF DETAIL OF CONSTRUCTION SCHEDULES
Schedule is an important tool used in the planning and control of projects. Effective use of scheduling can improve productivity and result in savings for the client and the contractor. The lower costs and increasing efficiency of computers and software have helped in popularizing the use of …
Page 1 of 4