Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 83 for “"construction stage"”.
-
The Instructional Leadership of School Principals in the “Construction Stage” Hopes, Reality, and Future
… of school principal's experience regarding the construction stage, the instructional leadership and the career stage. Focusing on principal's perceptions, needs and practices. Participants are principals, graduates of new training program in Israel. Findings constructed from unstructured …
-
Integrated nonlinear modelling of floating wind turbine
… To reduce the large capital cost associated with construction, the design of such platforms will need a reliable and sophisticated design tool that can perform load and response analysis in a comprehensive and fully integrated manner. This thesis presents an integrated nonlinear model for …
-
Work Zone Effects On Performance Of A Toll Plaza
No-lane closure workzone is typical during the construction of open road tolling lanes of a toll plaza. The influence of no-lane closure on toll plazas' performance is unknown because very few studies have been conducted to address this topic. The open road tolling (ORT) has become the new trend of …
-
Development of a management framework to improve the building services engineering design process; a case study of engineering management in an Irish consultancy practice
… design process is a major source of problems at construction stage, even to the extent of undermining systematic management. Managerial practitioners have wrestled with this productivity gap for many years, and the time has come to innovate. The current approach to BSE management is inherently …
-
Experimental and analytical investigations of the thermal behavior of prestressed concrete bridge girders including imperfections
… geometry and stress state of the girder in each construction stage. The final construction stage then exposed the girder to thermal effects and performed a geometric nonlinear analysis which also considered the nonlinear behavior of the elastomeric bearing pads. This solution detected an …
-
An evaluation of how VfM can be achieved from a government’s perspective in relation to school building projects in Ireland
… ensure VfM is achieved. These areas include the construction and post occupancy stage of each of these procurement options. In order to achieve this a review of the literature is presented which begins with a definition of what value means and goes on to investigate how VfM can be achieved at the …
-
Numerical study of a large diameter shaft in old alluvium
… using PLAXIS to simulate the excavation and construction of a large diameter circular shaft in Old Alluvium at the Changi Water Reclamation Plant. The excavation support system consisted of a diaphragm wall and internal ring walls. PLAXFLOW was used in conjunction with PLAXIS to perform …
-
Bridge deterioration models
… method of bridge management, from the conceptual stage through the construction stage, and throughout the useful life of our bridges. State agencies need to expand their data collection process so as to include additional information pertinent to the formulation of a credible system. This is …
-
Deflection comparisons of different wooden floor systems
… , 2"x6", and 2"x8" joists at four different stages of construction. Stage A was joist alone; stage B joists plus 1/2" plywood subflooring; stage C, stage B plus 25/32" oak strip flooring laid parallel to the joists; and stage D, stage B plus oak strip flooring laid perpendicular to joists. …
-
The motivation of quantity surveyors in the Malaysian construction industry for improved job performance
The construction industry is significantly influenced by the competitive environment, and due to this, economy and quality of life have been affected and inevitably, the way people work has also changed in order to sustain them. In the construction industry, the employees’ motivation is important, …
-
A contractual framework for two-stage early-contractor involvement (2S-ECI) in New Zealand commercial construction projects : a thesis submitted in fulfilment of the requirements for the degree of Doctor of Philosophy (PhD) in Construction at Massey University, School of Built Environment, Massey University, Albany, Auckland, New Zealand
Two-stage early contractor involvement (2S-ECI) is a two-stage procurement process for firstly employing a contractor during the design stage, and then entering into a contract for construction. 2S-ECI contractual practices remain generally unknown in New Zealand despite the well-documented …
-
Essays in Contract Theory
… of a sequential project with design and construction, in which an owner chooses between unbundling and bundling the tasks; with moral hazard in design effort and private information about construction cost, bundling links the stages by allowing design incentives to depend on the reported …
-
Taking Turns: A Conversational Approach to Ecological Design
… of a conceptual design but did not reach construction stage before the close of fieldwork.'Embodied conversation' describes the design process, characterized by alternating modes of interaction, turn-taking, negotiation of differences, and emergence of meaning and purpose. This approach …
-
Analysis of time-dependent effects on segmental prestressed concrete curved box-girder bridges
… of such structures throughout their various stages of construction and service load history. The analysis accounts for the effects of concrete creep and shrinkage, prestressed steel relaxation, differences in age between concrete segments, sequence of construction and changes in geometry and …
-
The Applicability of Geoelectrical Methods in Pre-Investigation for Construction in Rock
Construction in rock is associated with risks because knowledge of the geology and ground conditions is limited. Unforeseen rock conditions involve a large risk to the project and can in the end entail delays and extra costs. To minimize the risks, an optimized pre-investigation program has to be …
-
Carbon Impact of Shared Spaces in Urban High Density Residential Projects: China
… behavior along with the carbon emission of construction material and building’s heating/cooling energy consumption is of the same importance, while the former has always been ignored. In the design phase, decisions regarding shared spaces will influence the building’s shape, thus anyway …
-
Optimal time for contractors to enter infrastructure projects A case study of a Swedish ECI project
The design- and construction stage of infrastructure projects are often two separate, fragmented processes. Early contractor involvement (ECI) is a project delivery method where the goal is to include construction knowledge into the design phase. This is done by procuring the contractor during the …
-
Economic comparison between a wellhead geothermal power plant and a traditional geothermal power plant
… wellhead power plants. The focus is on the plant construction stage of the project development. In this study I defined a hypothetical steamfield, created different scenarios for the steamfield utilization where the advantages of wellhead power plants could be shown, and compared them using the …
-
Environmental Impacts of Prefabricated Construction: CO2 Emissions Comparison of Precast and Cast-In-Place Concrete Case Study
Construction activities are one of the major contributors to climate change by greenhouse gas emissions. While the use of prefabrication has certain advantages in terms of environmental impacts through material and time efficiency, it is not clear nor has enough data for the quantities and factors …
-
3D Point Cloud Reconstruction of a Single Image using Deep Learning
An essential yet challenging step in the 3D reconstruction problem is to train a machine or a robot to model 3D objects. Many 3D reconstruction applications depend on real-time data processing, so computational efficiency is a fundamental requirement in such systems. Despite considerable progress …
Page 1 of 5