Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 131 for “"construction stage."”

  1. Comparison of backward and forward construction stage analysis procedures of cable stayed bridges

    … and cable forces are determined. Afterwards, construction stage analysis is done to find cable forces in each construction stage. In the end, these determined cable forces in each construction stage should satisfy the desired cable forces, internal forces of the girder and pylons, and desired …

    metu Repository record for Comparison of backward and forward construction stage analysis procedures of cable stayed bridges (opens in a new tab)

  2. The Instructional Leadership of School Principals in the “Construction Stage” Hopes, Reality, and Future

    … of school principal's experience regarding the construction stage, the instructional leadership and the career stage. Focusing on principal's perceptions, needs and practices. Participants are principals, graduates of new training program in Israel. Findings constructed from unstructured …

    amu-pl Repository record for The Instructional Leadership of School Principals in the “Construction Stage” Hopes, Reality, and Future (opens in a new tab) Restricted access

  3. Implementation of quality management systems in engineering design practices during the construction stage: case study

    … of QMSs to increase the adherence to quality on construction projects. The treatise reports on the findings emanating from a quantitative study that entailed the completion of a self-administered survey questionnaire conducted among engineers/engineering technologists, along with the review of …

    nmmu Repository record for Implementation of quality management systems in engineering design practices during the construction stage: case study (opens in a new tab)

  4. Implementation of Quality Management Systems in Engineering Design Practices During the Construction Stage – Case Study

    … of QMSs to increase the adherence to quality on construction projects. The treatise reports on the findings emanating from a quantitative study that entailed the completion of a self -administered survey questionnaire conducted among engineers / engineering technologists, along with the review of …

    nmmu Repository record for Implementation of Quality Management Systems in Engineering Design Practices During the Construction Stage – Case Study (opens in a new tab)

  5. Integrated nonlinear modelling of floating wind turbine

    … To reduce the large capital cost associated with construction, the design of such platforms will need a reliable and sophisticated design tool that can perform load and response analysis in a comprehensive and fully integrated manner. This thesis presents an integrated nonlinear model for …

    city-london Repository record for Integrated nonlinear modelling of floating wind turbine (opens in a new tab)

  6. Work Zone Effects On Performance Of A Toll Plaza

    No-lane closure workzone is typical during the construction of open road tolling lanes of a toll plaza. The influence of no-lane closure on toll plazas' performance is unknown because very few studies have been conducted to address this topic. The open road tolling (ORT) has become the new trend of …

    ucf Repository record for Work Zone Effects On Performance Of A Toll Plaza (opens in a new tab)

  7. Development of a management framework to improve the building services engineering design process; a case study of engineering management in an Irish consultancy practice

    … design process is a major source of problems at construction stage, even to the extent of undermining systematic management. Managerial practitioners have wrestled with this productivity gap for many years, and the time has come to innovate. The current approach to BSE management is inherently …

    salford

  8. Development of a management framework to improve the building services engineering design process; a case study of engineering management in an Irish consultancy practice

    … design process is a major source of problems at construction stage, even to the extent of undermining systematic management. Managerial practitioners have wrestled with this productivity gap for many years, and the time has come to innovate. The current approach to BSE management is inherently …

    salford Repository record for Development of a management framework to improve the building services engineering design process; a case study of engineering management in an Irish consultancy practice (opens in a new tab)

  9. Experimental and analytical investigations of the thermal behavior of prestressed concrete bridge girders including imperfections

    … geometry and stress state of the girder in each construction stage. The final construction stage then exposed the girder to thermal effects and performed a geometric nonlinear analysis which also considered the nonlinear behavior of the elastomeric bearing pads. This solution detected an …

    gatech Repository record for Experimental and analytical investigations of the thermal behavior of prestressed concrete bridge girders including imperfections (opens in a new tab)

  10. An evaluation of how VfM can be achieved from a government’s perspective in relation to school building projects in Ireland

    … ensure VfM is achieved. These areas include the construction and post occupancy stage of each of these procurement options. In order to achieve this a review of the literature is presented which begins with a definition of what value means and goes on to investigate how VfM can be achieved at the …

    salford

  11. Developing a holistic financial risk management framework to optimize financial performance of public-private partnership projects in Ghana

    … to $20 million to reach the financial closure stage of the projects. Whiles most of the expenditure of the projects are recorded at the construction stage of the projects, pre-construction stage was also found to be a major point of incurring huge financial risks. The analysis of the data with …

    uws Repository record for Developing a holistic financial risk management framework to optimize financial performance of public-private partnership projects in Ghana (opens in a new tab)

  12. An evaluation of how VfM can be achieved from a government’s perspective in relation to school building projects in Ireland

    … ensure VfM is achieved. These areas include the construction and post occupancy stage of each of these procurement options. In order to achieve this a review of the literature is presented which begins with a definition of what value means and goes on to investigate how VfM can be achieved at the …

    salford Repository record for An evaluation of how VfM can be achieved from a government’s perspective in relation to school building projects in Ireland (opens in a new tab)

  13. Bridge deterioration models

    … method of bridge management, from the conceptual stage through the construction stage, and throughout the useful life of our bridges. State agencies need to expand their data collection process so as to include additional information pertinent to the formulation of a credible system. This is …

    njit Repository record for Bridge deterioration models (opens in a new tab)

  14. Numerical study of a large diameter shaft in old alluvium

    … using PLAXIS to simulate the excavation and construction of a large diameter circular shaft in Old Alluvium at the Changi Water Reclamation Plant. The excavation support system consisted of a diaphragm wall and internal ring walls. PLAXFLOW was used in conjunction with PLAXIS to perform …

    nus Repository record for Numerical study of a large diameter shaft in old alluvium (opens in a new tab)

  15. Deflection comparisons of different wooden floor systems

    … , 2"x6", and 2"x8" joists at four different stages of construction. Stage A was joist alone; stage B joists plus 1/2" plywood subflooring; stage C, stage B plus 25/32" oak strip flooring laid parallel to the joists; and stage D, stage B plus oak strip flooring laid perpendicular to joists. …

    vt Repository record for Deflection comparisons of different wooden floor systems (opens in a new tab)

  16. The motivation of quantity surveyors in the Malaysian construction industry for improved job performance

    The construction industry is significantly influenced by the competitive environment, and due to this, economy and quality of life have been affected and inevitably, the way people work has also changed in order to sustain them. In the construction industry, the employees’ motivation is important, …

    salford

  17. The motivation of quantity surveyors in the Malaysian construction industry for improved job performance

    The construction industry is significantly influenced by the competitive environment, and due to this, economy and quality of life have been affected and inevitably, the way people work has also changed in order to sustain them. In the construction industry, the employees’ motivation is important, …

    salford Repository record for The motivation of quantity surveyors in the Malaysian construction industry for improved job performance (opens in a new tab)

  18. Two new approaches in anomaly detection with field data from bridges both in construction and service stages

    … that UCII has monitored since the bridge’s construction stage. At the heart of UCII’s monitoring system is the ability to detect any anomalies; among these anomalies might be damages caused by structural changes due to creep, shrinkage, crack and so forth. The existing anomaly detection …

    ohiolink Repository record for Two new approaches in anomaly detection with field data from bridges both in construction and service stages (opens in a new tab)

  19. Essays in Contract Theory

    … of a sequential project with design and construction, in which an owner chooses between unbundling and bundling the tasks; with moral hazard in design effort and private information about construction cost, bundling links the stages by allowing design incentives to depend on the reported …

    washington Repository record for Essays in Contract Theory (opens in a new tab)

Page 1 of 7