  1. Temperature Effects on Integral Abutment Bridges During Early Construction Stages

    … on integral abutment bridges during early construction stages. Particular emphasis was placed on the evaluation of the resultant state of stress of the upper portion of the steel piling and portions of the girders immediately adjoining the integral abutment. A full-scale model representing …

    sdstate Repository record for Temperature Effects on Integral Abutment Bridges During Early Construction Stages (opens in a new tab)

  2. Temperature Effects on Integral Abutment Bridges During Final Construction Stages

    … integral abutment type bridge during the final stages of construction. This study is a continuation of the research carried out by Mumtaz B. Sarsam. Particular attention was given to the evaluation of the resultant state of stress in the end portion of the girder near and contained within the …

    sdstate Repository record for Temperature Effects on Integral Abutment Bridges During Final Construction Stages (opens in a new tab)

  3. Life cycle assessment of the geothermal power plant in the Patuha geothermal field, Indonesia

    … on the environment of the geothermal drilling, construction, and operation of the Patuha geothermal power plant. The LCA method for this research relies on the general framework outlined in ISO 14040:2006 and ISO 14044:2006 for environmental management. Following the impact analysis considered …

    reykjavik Repository record for Life cycle assessment of the geothermal power plant in the Patuha geothermal field, Indonesia (opens in a new tab)

  4. Cadeia de valor Leagile no desenvolvimento do projeto e construção de usinas eólicas offshore: proposta de framework de diretrizes

    … chain of offshore wind energy, especially the stages of project and construction determine, to a large extent, the price of electricity. Starting from the budget, you need to implement installation and planning techniques to increase your competitiveness. A strategy that can increase or perform …

    brazil-ufrn Repository record for Cadeia de valor Leagile no desenvolvimento do projeto e construção de usinas eólicas offshore: proposta de framework de diretrizes (opens in a new tab)

  5. Interactive design of braced excavations

    Construction of braced excavations in major urban areas has increased over the last few decades. It is a major concern of the designer to limit ground movement around an excavation in order to prevent damage to adjacent structures, utilities and roads. Existing design methods can accurately predict …

    vt Repository record for Interactive design of braced excavations (opens in a new tab)

  6. Computational modeling of prestress transfer, end-region cracks and shear behavior in prestressed concrete I-girders employing large-diameter strands

    … transfer with consideration of performance from construction stages, over the course of the service life, and up to the ultimate limit state can provide key insight into the suitability of using of 0.7-in. (17.8-mm) diameter strands. Further, it could serve as an economical tool for the …

    texas Repository record for Computational modeling of prestress transfer, end-region cracks and shear behavior in prestressed concrete I-girders employing large-diameter strands (opens in a new tab)

  7. A Helping Hand: Design process of a soft anthropomorphic end-effector for the construction industry.

    … designed for use with a collaborative robot on a construction site. As the construction industry changes to meet the demands of increasing populations and lack of skilled trades workers, new approaches are needed. This research explores the possibilities of a collaborative robot working on a …

    unsw Repository record for A Helping Hand: Design process of a soft anthropomorphic end-effector for the construction industry. (opens in a new tab)

  8. DATA-DRIVEN MODELING OF IN-SERVICE PERFORMANCE OF FLEXIBLE PAVEMENTS, USING LIFE-CYCLE INFORMATION

    … in the performance of pavements, the quality of construction and production are also as important as the other factors. The designed properties of Hot Mix Asphalt (HMA) pavements, known as flexible pavements, are subjected to change during production and construction stages. Therefore, most of …

    temple Repository record for DATA-DRIVEN MODELING OF IN-SERVICE PERFORMANCE OF FLEXIBLE PAVEMENTS, USING LIFE-CYCLE INFORMATION (opens in a new tab)

  9. A Scenic Design For Richard O'Brien's The Rocky Horror Show

    … into the research, development, and construction processes in order to create the realized production. I explain the challenges and obstacles I faced in the development and construction stages and how my communication with members of the design and production staff led to the final …

    ucf Repository record for A Scenic Design For Richard O'Brien's The Rocky Horror Show (opens in a new tab)

  10. Infografia interativa na redação: o processo de produção no Diário do Nordeste à luz da teoria do jornalismo

    … on productive routine (gatekeeping) and the construction stages of the news. This research also draws on the theoretical framework on the subject, in concepts essential characteristics of computer graphics, as well as the methodological procedures and systematic empirical observations in …

    brazil-ufrn Repository record for Infografia interativa na redação: o processo de produção no Diário do Nordeste à luz da teoria do jornalismo (opens in a new tab)

  11. Multichannel digital voltmeter using the LM3S8962 evaluation board

    … obstacles were encountered in the design and construction stages. A description of the obstacles, and how they were overcome is described. The end design of both the shield circuit and software is then detailed end-to-end, along with an explanation of how to use the end product. Finally, the …

    texas Repository record for Multichannel digital voltmeter using the LM3S8962 evaluation board (opens in a new tab)

  12. INTEGRATION OF HUMAN FACTORS ENGINEERING AT THE EARLY DESIGN OF HYDROCARBON AND CHEMICAL PROCESSING FACILITIES

    … group of activities occurs during the design and construction stages of capital or upgrade projects. While the remaining activities occur during startup and operations. This thesis describes both groups. However, the main focus is on the former, more specifically at the conceptual design stage …

    tamu Repository record for INTEGRATION OF HUMAN FACTORS ENGINEERING AT THE EARLY DESIGN OF HYDROCARBON AND CHEMICAL PROCESSING FACILITIES (opens in a new tab)

  13. Extending Building Information Modeling (BIM) interoperability to geo-spatial domain using semantic web technology

    … the planning process during the design and construction stages. Currently, building (and geospatial) data are shared between BIM software tools through a common data format, such as Industry Foundation Classes (IFC). Because of the diversity and complexity of domain knowledge across BIM and …

    gatech Repository record for Extending Building Information Modeling (BIM) interoperability to geo-spatial domain using semantic web technology (opens in a new tab)

  14. Evaluation of the situation at Korsvägen during the construction period of Västlänken – A case study of a layout proposal

    The construction of Västlänken will have a large impact on the city of Gothenburg in many aspects. As a consequence of Västlänken, Korsvägen will be transformed into a construction site during several years. The focus of this master thesis is based on three main topics regarding Korsvägen; …

    chalmers Repository record for Evaluation of the situation at Korsvägen during the construction period of Västlänken – A case study of a layout proposal (opens in a new tab)

  15. The role of the environmental manager in the Air Force

    … were projects in the design, funded or under construction stages. The greatest delay in pollution abatement project occurred at the funding stage. Because many projects must compete for limited funds, a systems model was devised which would permit the environmental manager to compare various …

    vt Repository record for The role of the environmental manager in the Air Force (opens in a new tab)

  16. Buffeting analysis of cable-stayed bridges during their erection.

    … vulnerable to dynamic wind effects during their construction stages due to the lack of overall structural stiffness. The most critical stage is just before the bridge main span is closed. At this time, a cable-stayed bridge resembles a long cantilever structure supported by cables, and …

    ottawa-retro Repository record for Buffeting analysis of cable-stayed bridges during their erection. (opens in a new tab)

  17. Providing the health care facility utilizing a comprehensive team approach

    … efforts during the facility planning and design stages. During the 70's the health care client will be faced with more challenges than have ever existed in the past. The complex interdisciplinary nature of health facilities as well as the varied interdepartmental relationships have enhanced the …

    vt Repository record for Providing the health care facility utilizing a comprehensive team approach (opens in a new tab)

  18. Whole life performance of building facades in tropics via maintainability assessment system

    … and intangible perspectives of fa??ade design, construction, maintenance and related risks that affect fa??ade maintainability and hence benchmark the level of fa??ade maintainability. In this study, 59 buildings in Singapore were evaluated to identify facade failures and establish the risk …

    nus Repository record for Whole life performance of building facades in tropics via maintainability assessment system (opens in a new tab) Download file for Whole life performance of building facades in tropics via maintainability assessment system (opens in a new tab)

  19. Early-age thermo-mechanical behaviour of concrete Supercontainers for radwaste disposal

    … they also ensure shielding protection during construction and transport. A self-compacting concrete (SCC) and a Traditional Vibrated Concrete (TVC) are bein considered for the choice of the cementious buffer, enclosing the radwaste. The use of SCC will ease considerably the precast process and …

    ghent Repository record for Early-age thermo-mechanical behaviour of concrete Supercontainers for radwaste disposal (opens in a new tab)

  20. Modelling deep mixing on the passive side of a deep excavation in soft soil - A pilot study to evaluate the effect of lime-cement columns on the passive side of excavation in soft soil

    … Västlänken. Inclinometers were installed on the construction site to measure the wall displacements as well as sensors to measure the forces in the struts. To further deepen the under-standing of the behavior of a LC stabilized excavation a numerical model is created using Creep-SCLAY1S model and …

    chalmers Repository record for Modelling deep mixing on the passive side of a deep excavation in soft soil - A pilot study to evaluate the effect of lime-cement columns on the passive side of excavation in soft soil (opens in a new tab)