Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 216 for “"construction time"”.

  1. Highway earthwork and pavement production rates for construction time estimation

    … decades, the complexity and size of highway construction projects have increased dramatically. Because of this change, Contract Time estimates for most construction projects have been based on the critical path method (CPM). However, with the use of the CPM, many problems associated with …

    texas Repository record for Highway earthwork and pavement production rates for construction time estimation (opens in a new tab)

  2. Sempar — A Tool for Construction-Time Specification of Linting in Parsers

    A linter is a good tool to aid developers, however they are most common in larger, well-used languages such as Java or Python. They aid by giving feedback to the developer regarding their code, for example about code style or bad practices. A common problem is that it is hard to find linters for …

    chalmers Repository record for Sempar — A Tool for Construction-Time Specification of Linting in Parsers (opens in a new tab)

  3. Modelling building construction speed by using linear regression analysis, artificial neural networks and n-dimensional finite elements

    The estimation of the time required to construct building projects has been a topic of great interest to many researchers and practitioners. Delays are a common problem in the construction industry and may be motivated by different factors. In this context, prediction of the construction time of …

    alicante Repository record for Modelling building construction speed by using linear regression analysis, artificial neural networks and n-dimensional finite elements (opens in a new tab)

  4. Faster data structures and graphics hardware techniques for high performance rendering

    … with different requirements. As an example, real-time applications such as computer games have completely different restrictions and demands than offline rendering of feature films. A game has to render quickly using only limited resources, yet present visually adequate images. Film and visual …

    lund Repository record for Faster data structures and graphics hardware techniques for high performance rendering (opens in a new tab) Download PDF for Faster data structures and graphics hardware techniques for high performance rendering (opens in a new tab)

  5. Multifunktionsrigg för komponentprovning

    … largest consulting companies mainly active in construction and infrastructure. Today, there are high demands on trucks and their construction. They should both be lightweight, strong and fuel efficient. It is also very expensive to test the whole vehicle at development. It makes testing of …

    chalmers Repository record for Multifunktionsrigg för komponentprovning (opens in a new tab)

  6. Management of biological sequences using suffix trees

    … an indexing technique that is reasonable in construction time and space utilization, and supports efficiently versatile search applications in biological sequences of various sizes, running on a typical desktop computer. The contributions of this research include development of a ST based …

    concordia Download PDF for Management of biological sequences using suffix trees (opens in a new tab)

  7. Impact of highway work zones on traffic crashes: A case study in Michigan

    … a seemingly paradoxical problem in the field of construction management: In order to fix and make roads and highways more safe, construction zones must become inherently less safe in the process. There is a high cost to taxpayers and drivers, as work zones experience a significant amount of …

    emich Repository record for Impact of highway work zones on traffic crashes: A case study in Michigan (opens in a new tab)

  8. ENGINEERING COMPRESSED STATIC FUNCTIONS AND MINIMAL PERFECT HASH FUNCTIONS

    … retrieve $v_i$ given $k_i$ (usually, in constant time). When every key is mapped into a different value this function is called \emph{perfect hash function} and when $n=m$ the data structure yields an injective numbering $S\to \lbrace0,1, \ldots n-1 \rbrace$; this mapping is called a \emph{minimal …

    milano Repository record for ENGINEERING COMPRESSED STATIC FUNCTIONS AND MINIMAL PERFECT HASH FUNCTIONS (opens in a new tab)

  9. Acceleration of bridge construction with prolonged service life

    … This has led to increase in the bridge construction projects and with a simultaneous increase in traffic demand, there is a need to accelerate the bridge construction and prolong the bridge life while lowering the construction cost.</p> <p>To achieve the objective of faster construction …

    iastate Repository record for Acceleration of bridge construction with prolonged service life (opens in a new tab)

  10. Data driven process monitoring based on neural networks and classification trees

    … show a significant reduction in neural model construction time and sometimes better classification results as well. The second part of this research investigates classification trees as a promising approach to fault detection and classification. It is found that the underlying principles of …

    tamu Repository record for Data driven process monitoring based on neural networks and classification trees (opens in a new tab)

  11. A HIERARCHICAL SYSTEM VIEW AND ITS USE IN THE DATA DISTRIBUTION OF COMPOSED CONTAINERS IN STAPL

    … which reduces memory usage and improves construction time. It also reduces the amount of inter-process com- munication by improving the locality of the elements when we apply nested parallel functions on a composed concurrent container. To evaluate our approach, we implement two …

    tamu Repository record for A HIERARCHICAL SYSTEM VIEW AND ITS USE IN THE DATA DISTRIBUTION OF COMPOSED CONTAINERS IN STAPL (opens in a new tab)

  12. Techno-economic analysis of advanced small modular nuclear reactors

    … analysis is performed, for which the OCC and construction time of the LW-SMR is found to have a lower mean and standard deviation than a conventional large reactor. The LW-SMR OCC is found to have a mean of $5,233/kW with a standard deviation of $658/kW and a 90% probability of remaining …

    colostate Repository record for Techno-economic analysis of advanced small modular nuclear reactors (opens in a new tab)

  13. Broadband Macromodeling Techniques for Interconnects and Electronic Packages

    … and passivity are preserved during the model construction. Also, a new method is formulated based on vector-fitting method in z-domain. It has the advantage of faster convergence and better numerical stability compared to the s-domain vector-fitting method. The fast convergence of the method …

    uiuc Repository record for Broadband Macromodeling Techniques for Interconnects and Electronic Packages (opens in a new tab)

  14. Bamboo: An Alternative Building Material for Urban Ethiopia

    … solution concentrates on simplification of construction methods, prefabrication of structural components and vertical densification of housing units, addressing the lack of skilled labor, cost of construction time and urban land respectively. An understanding of the design solution was …

    calpoly Repository record for Bamboo: An Alternative Building Material for Urban Ethiopia (opens in a new tab)

  15. Effects of Contract Delivery Method on the LEED™ Score of U.S. Navy Military Construction Projects (Fiscal Years 2004-2006)

    … the LEED score of projects over the design and construction time horizon. The Navy uses almost exclusively Design-Bid-Build and Design-Build contracting methods to deliver Military Construction (MCON) projects. Twenty-five projects were analyzed and there were no statistically significant …

    nps Repository record for Effects of Contract Delivery Method on the LEED™ Score of U.S. Navy Military Construction Projects (Fiscal Years 2004-2006) (opens in a new tab)

  16. Rethinking modularity; designing a prototype for checkered stacking

    … of advantages in comparison to conventional construction, including reduced construction time, minimised material waste, reduced labour costs and improved quality control. However, modular construction faces challenges in relation to logistical, spatial and structural issues. Through the …

    chalmers Repository record for Rethinking modularity; designing a prototype for checkered stacking (opens in a new tab)

  17. An environment to support computer-assisted design review

    In recent years productivity of the U.S. construction industry has lagged behind other sectors of the economy, resulting in higher costs of goods and services for all consumers. Construction productivity can be enhanced by the increased use of automation in the facility delivery process. The review …

    uiuc Repository record for An environment to support computer-assisted design review (opens in a new tab)

  18. Experimental Investigation of Reinforced Concrete Beams with Lapped Reinforcement

    … must be achieved efficiently by reducing construction time and improving the capacity and durability of the structure. Precast, prestressed decked bulb tees (DBTs) serve as an excellent solution to ensure quality from an on-site precast concrete fabricator and also to reduce construction …

    ut-knoxville Repository record for Experimental Investigation of Reinforced Concrete Beams with Lapped Reinforcement (opens in a new tab)

Page 1 of 11