Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 46 for “"contract award"”.
-
Requirement Analysis: Evaluating the Degree of Heterogeneity for Determining an Appropriate Basis for Contract Award
… and the Most Advantageous Tender approach in contract award procedures. Depending on the degree of heterogeneity of the requirement, either the Lowest Tender or the Most Advantageous Tender approach could be used. However, there is no procedure to determine how to evaluate the degree of …
-
An analysis of federal Head Contracting Authority (HCA) decisions regarding overrides of statutory stays of contract award and continued performance resulting from bid protests
… agency source selection process within Federal contracting agencies by conducting an analysis of Federal Head Contract Authority (HCA) decisions to override the required statutory stay of contract award and performance, in accordance with the Competition in Contracting Act (CICA) of 1984, …
-
Insider information trading analysis of Defense companies prior to major contract awards
… purpose of this thesis is to examine government contractor stock activity prior to contract award announcements to determine if insider information inequalities may have occurred. The stock price data of four defense companies for the 30 days prior to a contract award is analyzed. The Capital …
-
FACTORS INFLUENCING TIMELINES ON NON-COMPETITIVE ACQUISITIONS GREATER THAN $500 MILLION
… time (PALT) prediction model for sole-source contract awards greater than $500 million at Air Force Life Cycle Management Center. The scope of our research is confined to PALT, which is the number of days between solicitation release and contract award. Our research team uses an ordinary least …
-
Email B2B sales negotiation : dynamic use of textual cues as influence tactics
… on sales outcomes - buyer attention and contract award - during email B2B sales negotiations. To test the proposed conceptual framework, I use a field and a controlled setting. In the field study, I collect email data for 43 B2B sales contract negotiations conducted over the course of 2.5 …
-
HIGH-INFLUENCE FACTORS FOR THE TIMELINESS OF PROJECT AWARD FOR NAVY MILITARY CONSTRUCTION
… Construction (MILCON) projects from concept to contract award fails to provide reliable and timely results. This poor performance leads to the untimely delivery of critical facilities, which directly impacts warfighting and power projection capabilities. It erodes the professional reputation of …
-
An analysis of protests of contracts awarded using the best value trade-off process from January 1998 through December 1999
… purpose of this thesis is to analyze protests of contract awards brought before the Comptroller General, General Accounting Office from January 1998 through December 1999 as a means to identify areas of possible improvement among Federal contracting agencies. Specific emphasis is on the underlying …
-
An analysis of source selection procedures for engineering support services contracts.
… thesis is to identify and discuss the key preaward problems encountered in engineering support services contracts and how these problems might be avoided in order to improve the contracting process. The research was conducted by a review of directives and policy guidance, field interviews with …
-
Acquisition of airlift services from commercial sources: a revised method.
… the Military Airlift Command has used the award of Department of Defense airlift service contracts as an incentive to encourage commercial air carriers to commit aircraft to the mobilization base embodied in the Civil Reserve Air Fleet (CRAF) program. Contracts are made in proportion to …
-
Performance Comparison of Design-Build and Construction Manager/General Contractor Highway Projects
… of DB and construction manager/general contractor (CM/GC) highway projects. Therefore, an exploratory study was conducted to compare the performance of 55 DB and 34 CM/GC highway projects from various States Departments of Transportation (DOTs) in terms of cost, change orders, and …
-
The significance of trust in the contractor selection process
… Particularly, the selection of a suitable contractor is a difficult task. This has often been carried out by way of a competitive tendering process, which is part of the project procurement management process. To make projects run more smoothly many researchers suggest that trust plays an …
-
Procured Expertise in the European Commission: Understanding its Impact and Embeddedness in Europe’s Energy, Environment and Climate Action Policies
… 2023, the European Commission published 6,275 contract award notices for the purchase of works, supplies and services, totalling billions of euros. These services included procurement of expert ‘consultant’ services to inform policy formulation, ranging from information provision and process …
-
APPLICATION OF ARTIFICIAL INTELLIGENCE IN THE DEPARTMENT OF DEFENSE TO ENHANCE THE CONTRACTING PROCESS TIMELINE
… stalls the process is in place to ensure the awarded contract meets a myriad of requirements based in policy, feasibility, and good stewardship of public resources. With this in mind, the rate of technological advancement is outpacing the procurement process’s ability to meet demand without …
-
INTELLECTUAL PROPERTY: TECHNICAL DATA AND COMPUTER SOFTWARE RIGHTS PROCUREMENT IN DEPARTMENT OF DEFENSE MAJOR WEAPON SYSTEMS
… developed during the acquisition planning and contract award phases of four Air Force major weapon system programs. The paper utilizes the research findings to identify "best practices" that can be readily applied to future acquisitions when procuring technical data and computer software rights.
-
Mobile Subscriber Equipment: the materiel fielding of a nondevelopmental system
… corps and division levels. This system went from contract award to materiel fielding in a period of less than two and a half years through the utilization of nondevelopmental item (NDI) acquisition. The accelerated acquisition cycle presented many challenges to the successful deployment of this …
-
Financial analysis of private sector firms within the DoD
… analysis. Two of these activities, the Defense Contract Audit Agency, and the Defense Contract Management Command, conduct their analysis in support of the contract award process. The remaining three activities, the Naval Center for Cost Analysis, Army Center for Resource Analysis and Business …
-
DESIGN & BUILD" OF HDB PUBLIC HOUSING : A TENDERER'S PERSPECTIVE"
… presents the position of a tenderer (the contractor and his team of consultants) in a Housing & Development Board of Singapore (HDB) Design & Build (D&B) building project. It focuses on the tenderer's perspective. This concerns efforts and procedures undertaken during the tendering stage …
-
Debriefing unsuccessful offerors: an updated approach
A common complaint among many contractors working with Army Material Command is that debriefings do not provide enough information to completely satisfy contractors as to why they were not selected for contract award when they are an unsuccessful offeror. This thesis reviews the regulations that …
Page 1 of 3