Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 75 for “"cost plus"”

  1. Decision criteria for cost-plus-award-fee contracts in major systems acquisition.

    The Cost-Plus-Award-Fee (CPAF) contract has useful application in Major Systems Acquisition during the full-scale development phase. This thesis examines the Cost-Plus-Award- Fee contract with Leavitt's Organizational Theory model which identifies goals, technology, people, structure, and …

    nps Repository record for Decision criteria for cost-plus-award-fee contracts in major systems acquisition. (opens in a new tab)

  2. Research of after-sale service system based on supply chain contract

    … during and after a warranty period. The main cost is called fixed cost which remains (more or less) unchanged irrespective of the output level or sales revenue. The cost plus contract is used traditionally. Under a cost-plus contract, a contractor is reimbursed for the cost incurred, and is …

    nanyang Repository record for Research of after-sale service system based on supply chain contract (opens in a new tab)

  3. The influence of contextual factors on cost system design and pricing decisions : a study of UK companies in the food processing and other industries

    … to provide a better understanding of product costing system design, this study utilises the contingency theory approach to investigate the contingent relationships between several contextual factors and the design of product costing system simultaneously. This study also investigates the …

    huddersfield Repository record for The influence of contextual factors on cost system design and pricing decisions : a study of UK companies in the food processing and other industries (opens in a new tab)

  4. On Managing Stochastic Decentralized Projects

    … as projects have become increasingly complex, costly, and strategically important (especially IT and product development projects). In this dissertation, we analyze a decentralized project that is composed of n serial stages with stochastic durations; the project is planned, organized, and …

    washington Repository record for On Managing Stochastic Decentralized Projects (opens in a new tab)

  5. Stavebně technologický projekt - polyfunkční domy "Žižkov"

    … dodavatele, ale použil smluvní vztah „cost plus fee“. Autor se zabývá posouzením tohoto vztahu z hlediska stavebníka. Vstupním podkladem je veškerá projektová dokumentace a vlastní zkušenosti z výstavby z pozice technický dozor investora.

    cz-tech Repository record for Stavebně technologický projekt - polyfunkční domy "Žižkov" (opens in a new tab)

  6. Designing market institutions

    … test that maximizes joint sender–certifier surplus. Senders whose beliefs fall below a lower threshold purchase no test. Senders with intermediate beliefs are fully separated, so that their test choices perfectly reveal their private information. Essay II studies the regulation of a screening …

    aalto Repository record for Designing market institutions (opens in a new tab)

  7. AN ECONOMIC ANALYSIS ON RISK SHARING, INCENTIVIZATION, AND DEFENSE PROCUREMENT CONTRACT DESIGN IN THE MAJOR DEFENSE ACQUISITION PROGRAM SETTING

    … combat information asymmetry that contributes to cost overruns, slipping timelines, and underperformance relative to initial expectations in Major Defense Acquisition Programs (MDAPs). This thesis aims to answer: What is the optimal contract structure for achieving effective risk-sharing and …

    nps Repository record for AN ECONOMIC ANALYSIS ON RISK SHARING, INCENTIVIZATION, AND DEFENSE PROCUREMENT CONTRACT DESIGN IN THE MAJOR DEFENSE ACQUISITION PROGRAM SETTING (opens in a new tab)

  8. Cost allocation systems : empirical study in Libyan manufacturing companies

    … Libya by the UN in 2003, the need for developing cost allocation systems has become necessary. This includes aspects such as privatization, foreign industries, and competition. All these factors should be considered by the cost and management accounting practitioners of the Libyan industrial …

    liverpool-jm Repository record for Cost allocation systems : empirical study in Libyan manufacturing companies (opens in a new tab)

  9. Contracting methods and management systems of remedial action contracts within the U.S. Navy's installation restoration program.

    … installations. The Navy estimates their cleanup costs will exceed $3 billion. To meet the challenges of the next century, the Navy should carefully investigate those areas of its Installation Restoration Program that can be improved. Key components of the program include: Comprehensive Long-term …

    nps Repository record for Contracting methods and management systems of remedial action contracts within the U.S. Navy's installation restoration program. (opens in a new tab)

  10. Σύστημα υποστήριξης αποφάσεων επιλογής τύπου σύμβασης κατασκευής στα πλαίσια της διαχείρισης έργων οδοποιίας

    … between more contract type options, including “cost plus fixed fee”, “cost plus incentive” and “fixed price incentive” and also the contract types “cost plus percentage fee” and “incentive/disincentive for time reduction”, for which there is currently such provision in the Greek Public Works Law …

    greece Repository record for Σύστημα υποστήριξης αποφάσεων επιλογής τύπου σύμβασης κατασκευής στα πλαίσια της διαχείρισης έργων οδοποιίας (opens in a new tab)

  11. A Reconsideration of Full-Cost Pricing

    The wide use of full-cost pricing techniques remains an explanandum in both economics and management accounting theory. This work surveys and develops possible theoretical explanations of this industrial pricing behaviour and analyses some of its implications. By recognition of the widespread use …

    lmu-germany Repository record for A Reconsideration of Full-Cost Pricing (opens in a new tab)

  12. BREEDLOVE -- An empire of the air, 1939-48

    William Clent Breedlove created an "empire of the air" by signed contracts with the Civilian Pilot Training Program and the United States Army Air Forces to train pilots for the United States military during World War II. These lucrative contracts proved very financially rewarding for him but in …

    ttu Repository record for BREEDLOVE -- An empire of the air, 1939-48 (opens in a new tab)

  13. An Evaluation of Incentive Provisions in Government Contracts

    … this type of work has been contracted for on a cost-plus-fixed-fee (CPFF) basis, the dollar amount of which has been rising steadily. In fiscal year 1953, for example, 15 per cent of all Department of Defense (DOD) procurement was on a CPFF basis, while in fiscal year 1962 the figure rose to an …

    unm Repository record for An Evaluation of Incentive Provisions in Government Contracts (opens in a new tab)

  14. Utilization of award fee contracts at Naval Regional Contracting Centers

    … contractor for above average performance. Use of cost-plus-award-fee and fixed-price-award-fee has many applications at the Field Contracting Activity level. The use of award fee contracts has many benefits and costs not associated with other types of incentives contracts. To better facilitate its …

    nps Repository record for Utilization of award fee contracts at Naval Regional Contracting Centers (opens in a new tab)

  15. An economic analysis and operations research of wildfire management

    PART ONE: The Cost plus Net Value Change (C+NVC) model provides the theoretical foundation for wildland fire economics, and provides the basis for the National Fire Management Analysis System (NFMAS). The C+NVC model is based upon the earlier least Cost plus Loss model (LC+L) expressed by Sparhawk …

    colostate Repository record for An economic analysis and operations research of wildfire management (opens in a new tab)

  16. An interleaving warehouse layout model

    … is determined on the basis of inventory cost considerations. With space requirements taken as given, the actual assignment of items to locations in the warehouse is carried out independently. Assuming an interleaving ("dual command") order picking method and the simple economic order …

    vt Repository record for An interleaving warehouse layout model (opens in a new tab)

  17. A dynamic model for the allocation of airstrikes against a lines-of-communication network.

    … are independent. Upper and lower flow bounds, cost per unit flow, maximum repair time and cost, and the vulnerability parameter for each arc are required as input data. The model selects that arc to strike which maximizes the repair cost plus the product of the increase in minimum cost …

    nps Repository record for A dynamic model for the allocation of airstrikes against a lines-of-communication network. (opens in a new tab)

Page 1 of 4