Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 35 for “"critical path method CPM"”.

  1. Impact Of Critical Path Method (CPM) Of Scheduling On On-Time Completion Of Transportation Projects

    This study addresses the effectiveness of Critical Path Method (CPM) scheduling on project delivery. Specifically, the on-time completion of projects with and without a CPM schedule is explored. The paper uses data from 2,097 South Carolina transportation projects let after February 2008 and …

    south-carolina Repository record for Impact Of Critical Path Method (CPM) Of Scheduling On On-Time Completion Of Transportation Projects (opens in a new tab)

  2. A process for determining construction contract duration for highway projects

    … highway projects. The process developed uses the critical path method (CPM) to assess complex, non-repetitive construction items, while at the same time, assessing horizontal, repetitive construction items with the linear scheduling method. This is chiefly done by the identification of strategic …

    texas Repository record for A process for determining construction contract duration for highway projects (opens in a new tab) Restricted access

  3. Návrh projektu a aplikace metodiky projektového managementu ve společnosti ZTC Holding, SE

    … teorie časové analýzy projektu, včetně metody Critical Path Method (CPM) a Ganttova diagramu. Druhá část se zaměřuje na analýzu vnějšího prostředí pomocí analýzy PESTLE, analýzy SWOT a analýzy vnitřního prostředí 7S. Tato část také pojednává o přesném vymezení projektu, jeho cílů, které jsou …

    brno-tech Repository record for Návrh projektu a aplikace metodiky projektového managementu ve společnosti ZTC Holding, SE (opens in a new tab)

  4. The U.S. Coast Guard 87’ Patrol Boat Maintenance Program: An Analysis of a Scheduling and Resource Leveling Problem

    … Primavera software, has historically used the Critical Path Method (CPM) of scheduling for their maintenance projects. With the introduction of an assembly line program to repair all East Coast 87-foot Patrol Boats named the Bow to Stern Program, the Yard resorted to manually sequencing work …

    washington Repository record for The U.S. Coast Guard 87’ Patrol Boat Maintenance Program: An Analysis of a Scheduling and Resource Leveling Problem (opens in a new tab)

  5. Application of Critical Chain Project Management to the Production Part Approval Process

    … Americas, INC has traditionally utilized various methods to manage project completions including the Critical Path Method (CPM). Though these methods have led to successful project completions, they often come with adverse effects. Due to the amount of literature and advancement in the project …

    wku-diss Repository record for Application of Critical Chain Project Management to the Production Part Approval Process (opens in a new tab)

  6. Comparing Critical Chain Project Managemenet with Critical Path Method: A Case Study

    … management. The current scheduling technique, Critical Path Method (CPM), has been widely applied for several decades, but a large number of projects fail to be completed on time and schedule delays occur in many projects. This raises question about the validity of the current project …

    wku-diss Repository record for Comparing Critical Chain Project Managemenet with Critical Path Method: A Case Study (opens in a new tab)

  7. Highway earthwork and pavement production rates for construction time estimation

    … construction projects have been based on the critical path method (CPM). However, with the use of the CPM, many problems associated with unrealistic contract timing are encountered. In order to solve these problems, many transportation agencies have attempted to establish a standard process to …

    texas Repository record for Highway earthwork and pavement production rates for construction time estimation (opens in a new tab)

  8. Two Approaches to Critical Path Scheduling for a Heterogeneous Environment

    … two algorithms based on the classic static Critical Path Method (CPM). CPM has been suggested for homogeneous environments. We adapt this method for a heterogeneous environment. One of the proposed algorithms, named EA-CPM, maps a highest priority ready task to a processor that ensures its …

    odu Repository record for Two Approaches to Critical Path Scheduling for a Heterogeneous Environment (opens in a new tab)

  9. Time, cost and performance tradeoffs in project management

    … Evaluation and Review Technique (PERT) and the Critical Path Method (CPM). Our methodology leads to more accurate results than PERT/CPM, which typically results in optimistic planning due to less than actual completion time estimates that do not consider the possibility of more than one longest …

    mcmaster Repository record for Time, cost and performance tradeoffs in project management (opens in a new tab)

  10. Adapting Critical Chain Project Management to Army Engineer Construction Projects

    … Army Engineers have utilized the systems of the Critical Path Method (CPM) and multi-level Gantt chart planning system for its construction projects. While these methods are well accepted, they are not without their flaws. Research and literature in project management has given weight to several …

    wku-diss Repository record for Adapting Critical Chain Project Management to Army Engineer Construction Projects (opens in a new tab)

  11. A methodology for parsimoniously structuring a set of activities

    … this chart in performing analyses such as the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT). Very little effort, however, has been devoted to the formulation of activity networks, which is the initial step before aforementioned analyses. This research addresses …

    vt Repository record for A methodology for parsimoniously structuring a set of activities (opens in a new tab)

  12. An Investigation of the Expanding Role of the Critical Path Method by ENR'S Top 400 Contractors

    The Critical Path Method (CPM) is a widely used tool throughout the construction industry. Since its creation, the use and application of the Critical Path Method has grown tremendously. Up to date, three studies have been performed on how Engineering News Record's (ENR) Top 400 Contractor use CPM. …

    vt Repository record for An Investigation of the Expanding Role of the Critical Path Method by ENR'S Top 400 Contractors (opens in a new tab)

  13. A Resource-constrained CPM (RCPM) Scheduling and Control Technique with Multiple Calendars

    This research presents a Resource-constrained Critical Path Method (RCPM) technique that capitalizes on and improves the existing Critical Path Method (CPM) and Resource-Constrained Scheduling (RCS) techniques. A traditional CPM schedule is not realistic since it assumes unlimited resources, some …

    vt Repository record for A Resource-constrained CPM (RCPM) Scheduling and Control Technique with Multiple Calendars (opens in a new tab)

  14. Development and application of a production rate resource for contract time determination

    … sources. A recommended process based on the critical path method (CPM) was also developed for conducting a contract time determination using the Production Rate Resource. The gathered production rate data was then tested by conducting two contract time estimations of actual TXDOT highway …

    texas Repository record for Development and application of a production rate resource for contract time determination (opens in a new tab)

  15. An Urban Comprehensive Planning Model for Resource Allocation

    … Evaluation Review Technique (PERT) and the Critical Path Method (CPM).

    sdstate Repository record for An Urban Comprehensive Planning Model for Resource Allocation (opens in a new tab)

  16. Multi-Project Scheduling for Industrialization Projects: an approach to exploit resource flexibility

    … deadlines, making effective scheduling a critical challenge. Traditional scheduling techniques such as the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT), although widely used, assume fixed activity durations and stable resource availability. Consequently, …

    minho-thes Repository record for Multi-Project Scheduling for Industrialization Projects: an approach to exploit resource flexibility (opens in a new tab) Embargoed until 2028-03-20

  17. Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects

    <p>By integrating Linear Scheduling Method (LSM) concepts with risk modeling methods and using state-of-the practice contractual risk management, a framework is proposed to manage geotechnical uncertainty in construction projects. LSM provides an effective tool for graphically depicting a …

    iastate Repository record for Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects (opens in a new tab)

  18. Assessment of highway construction schedule review problems of Departments of Transportation : case study of Texas

    … by DOT’s schedule reviewers, 2) defining the criticality of identified problems, and 3) identifying high and low critical problems that are perceived by the practitioners. To achieve these objectives, this study developed a list of construction schedule problems that are found during the …

    texas Repository record for Assessment of highway construction schedule review problems of Departments of Transportation : case study of Texas (opens in a new tab)

  19. Superpath: A Non-Computerized Probabilistic Scheduling Methodology Using First Principles of the U. S. Navy's Program Evaluation Review Technique

    The Superpath method, a non-computerized probabilistic scheduling methodology relying upon first principles of the Program Evaluation Review Technique (PERT) and a summary level, event-centric network is presented. Like PERT, a network scheduling methodology developed by the United States Navy …

    maryland Repository record for Superpath: A Non-Computerized Probabilistic Scheduling Methodology Using First Principles of the U. S. Navy's Program Evaluation Review Technique (opens in a new tab)

  20. Schedule network node time distributions and arrow criticalities

    <p>This research develops exact methods to calculate project duration distributions and to calculate Van Slyke's (1963) criticality for arrows, the probability that an arrow is on a critical path, assuming nonnegative integer duration distributions. These calculations for project duration …

    iastate Repository record for Schedule network node time distributions and arrow criticalities (opens in a new tab)

Page 1 of 2