Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 15 of 15 for “"dam design"”

  1. Carson River Dam Design Proposal

    The feasibility of constructing a dam on the East Fork of the Carson River is investigated and a design proposal is presented. Site geology, seismic hazards, economic and environmental impacts, and cost are considered. Site geology is identified using the results of previous studies and data from …

    unr Repository record for Carson River Dam Design Proposal (opens in a new tab)

  2. Probabilistic safety analysis of dams

    Successful dam design endeavor involves generating technical solutions that can meet intended functional objectives and choosing the best one among the alternative technical solutions. The process of choosing the best among the alternative technical solutions depends on evaluation of design …

    qucosa-diss Repository record for Probabilistic safety analysis of dams (opens in a new tab)

  3. Sensitivity of probable maximum flood estimates in the lower Nelson River Basin

    … about the baseline. PMF is a critical dam design and safety consideration; this research improves the understanding of PMF estimates in the context of climate change and advancements in hydrological modelling.

    manitoba Repository record for Sensitivity of probable maximum flood estimates in the lower Nelson River Basin (opens in a new tab)

  4. Electronic Computer Program For The Solution Of Slope Stability By The Wedge Method Of Analysis.

    … century and tor thirty some years after, earth dam side slopes were selected on the basis of past experience in lieu of a theoretical analysis. Justin, a noted authority on earth dam design, summarized his feelings some years ago with the following recommendations: "Some engineers contend that …

    unm Repository record for Electronic Computer Program For The Solution Of Slope Stability By The Wedge Method Of Analysis. (opens in a new tab)

  5. PERFORMANCE EVALUATION OF SEDIMENT BASIN DESIGNS FOR HIGHWAY CONSTRUCTION SITES IN TENNESSEE

    <p>Performance of three sediment basin designs were tested; they were: 1) the TDEC standard design with a forebay, 2) the TDOT design with an inlet check dam, and 3) the TDOT standard design that does not include an inlet check dam. An 1/17 of an acre scaled physical model sediment basin, was …

    ut-knoxville Repository record for PERFORMANCE EVALUATION OF SEDIMENT BASIN DESIGNS FOR HIGHWAY CONSTRUCTION SITES IN TENNESSEE (opens in a new tab)

  6. Phosphorus cycling and water quality in an agriculural watershed

    … central Manitoba, Canada have installed small dams as flood control mechanisms. Previous work has shown these dams and reservoirs are effective at decreasing total phosphorus (P) export, however questions of permanence, daily P fluctuation, and mechanisms influencing P retention still remain. …

    sask Repository record for Phosphorus cycling and water quality in an agriculural watershed (opens in a new tab)

  7. Improving the Evidence Base for Natural Flood Management: Monitoring, Experimentation, and Ensemble Analysis

    … for measuring flow through full-scale leaky dams under high-flow conditions, demonstrating its value as an emerging method for practitioners. Third, through controlled experiments at a white-water rafting course, this thesis tests how leaky dam design and degree of leakiness influence flood …

    durham Repository record for Improving the Evidence Base for Natural Flood Management: Monitoring, Experimentation, and Ensemble Analysis (opens in a new tab) Embargoed until 2027-11-15

  8. Transformation of point rainfall to areal rainfall by estimating areal reduction factors, using radar data, for Texas

    … for a variety of purposes, which include dam design and its operation, public safety, engineering projects concerned with river management and drainage as well as rainfall-runoff relations. These require knowledge about the spatial and temporal variability of average rainfall over an area. …

    tamu Repository record for Transformation of point rainfall to areal rainfall by estimating areal reduction factors, using radar data, for Texas (opens in a new tab)

  9. Avaliação da estabilidade hidráulica de diques homogêneos de enrocamento galgáveis utilizando modelo físico reduzido

    Overtopped rockfill dams are drainage structures, generally used to contain mining sediments. These structures have a lowering in the central portion of the body of dam for flooding. The spillway is incorporated into the dam. Generally these dams are constructed with 3 m to 15 m of height, and …

    brazil-ufmg Repository record for Avaliação da estabilidade hidráulica de diques homogêneos de enrocamento galgáveis utilizando modelo físico reduzido (opens in a new tab)

  10. Economic impacts and analysis methods of extreme precipitation estimates for eastern Colorado

    Dams are designed to store water and to insure human safety and as such they must withstand, in their lifetimes, any extreme precipitation event in their drainage basin. Correct estimation of this event is critical because on one hand it must provide an adequate level of safety to not occur, but it …

    colostate Repository record for Economic impacts and analysis methods of extreme precipitation estimates for eastern Colorado (opens in a new tab)

  11. Water and material balance at mine tailings impoundments : software program development and risk analysis

    … impoundments often require engineered embankment dams to facilitate containment. Failure of impoundment dams can lead to serious effects downstream due to the release of significant amounts of water and solids. Inadequate water management has been recognized as the primary cause of such failures. …

    ubc Repository record for Water and material balance at mine tailings impoundments : software program development and risk analysis (opens in a new tab)

  12. Návrh optimalizace vodohospodářského využití potoka Loděnice v lokalitě Roučmídův mlýn a v okolí

    Cílem této závěrečné práce je návrh vodohospodářského řešení pro oblast Roučmídova mlýnu v okrese Kladno, která se dlouhodobě potýká s problémy se suchem. Základním podkladem je návrh přehrady na řece Loděnice ze seznamu přehrad Plánu hlavních povodí. Na vypracování projektu použiji data z portálu …

    cz-tech Repository record for Návrh optimalizace vodohospodářského využití potoka Loděnice v lokalitě Roučmídův mlýn a v okolí (opens in a new tab)

  13. Evaluation of Probable Maximum Precipitation (PMP) for West Virginia to Predict Current and Future PMP & Utilizing Acid Mine Drainage (AMD) Sludge in Reclamation

    … maximum precipitation (PMP) is essential for dam design as well as for the inspection, operation, maintenance, and repairs of these facilities. West Virginia Department of Environmental Protection Dam Safety utilizes the 6-hr, 10-mi2 (26-km2) PMP established by Hydrometeorological Report (HMR) …

    wvu Repository record for Evaluation of Probable Maximum Precipitation (PMP) for West Virginia to Predict Current and Future PMP & Utilizing Acid Mine Drainage (AMD) Sludge in Reclamation (opens in a new tab)

  14. A history of civil engineering

    … the operation of moving machinery adopted the designation "mechanical" engineer. In time other specialties came to be recognized, and new branches such as "chemical" and "electrical" engineering were born. A century after the granting of the 1828 charter civil engineering had become only one of …

    oxford Repository record for A history of civil engineering (opens in a new tab)