Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 52 for “"delay cost"”.

  1. Tool For Calculating User Delay Cost Associated With Urban Arterial Construction Zone

    Roadway construction work zone imposes travel delay on the road users. The monetary cost of the delay is called user delay cost (UDC). Limited work has been done on quantifying UDC in Canada and their focus were rural highways. If there is a realistic estimate of UDC, it could lead to less schedule …

    calgary Repository record for Tool For Calculating User Delay Cost Associated With Urban Arterial Construction Zone (opens in a new tab)

  2. Work Zone Analysis Under Detour Settings

    A new approach of work zone delay cost analysis is developed to understand the implications of detours. This method, unlike any of the previous methods, is based on the impacts within the transportation network and let users find the shortest paths which will eventually come to equilibrium. The …

    cornell Repository record for Work Zone Analysis Under Detour Settings (opens in a new tab)

  3. Optimum Allocation of Transit Signal Priority Deployment Along a Transit Corridor: A Bilevel Optimization Approach

    The central focus of this thesis is to develop a delay cost optimization model based on the cost of total person delay determining optimal Transit Signal Priority (TSP) configuration along a specified corridor based. The optimal configuration of TSP along a corridor allows for TSP to be implemented …

    calgary Repository record for Optimum Allocation of Transit Signal Priority Deployment Along a Transit Corridor: A Bilevel Optimization Approach (opens in a new tab)

  4. Managing delays in transit through vehicle scheduling and run time variation

    … rely on efficient scheduling to keep operating costs in check. To this end, the Vehicle Scheduling Problem (VSP) assigns trips to a fleet of vehicles at minimal operational costs. However, minimizing operating costs can result in schedules that have little buffer time between trips; these …

    ubc Repository record for Managing delays in transit through vehicle scheduling and run time variation (opens in a new tab) Download PDF for Managing delays in transit through vehicle scheduling and run time variation (opens in a new tab)

  5. FLIGHT ARRIVAL SCHEDULING MODELS FOR INCORPORATING COLLABORATIVE DECISION-MAKING CONCEPTS INTO TIME-BASED FLOW MANAGEMENT

    … However, existing systems do not differentiate delay costs among different aircraft and do not take user preferences into consideration. From a business perspective, it is essential to understand user preferences and to allow users to engage in decision-making. This dissertation presents results …

    maryland Repository record for FLIGHT ARRIVAL SCHEDULING MODELS FOR INCORPORATING COLLABORATIVE DECISION-MAKING CONCEPTS INTO TIME-BASED FLOW MANAGEMENT (opens in a new tab)

  6. Impact of the Panama Canal Expansion in Global Supply Chain: Optimization Model for U.S. Container Shipment

    … and ocean transportation are interactive, (2) delay cost and toll rate at the Panama Canal do not have a significant impact on trade volume and flows of US containerized shipments after the Panama Canal Expansion mainly because delay cost and toll rate at the canal account for a small portion …

    ndsu Repository record for Impact of the Panama Canal Expansion in Global Supply Chain: Optimization Model for U.S. Container Shipment (opens in a new tab)

  7. REAL-TIME CONTROL MODEL IN AIRLINE DELAY MANAGEMENT

    … control in airport management can reduce delay cost and alleviate delay propagation in an airline network. In this study, a model is developed to determine holding decisions and departure policies to the ready departure flights, which have transfer passengers from late arrival flights. …

    maryland Repository record for REAL-TIME CONTROL MODEL IN AIRLINE DELAY MANAGEMENT (opens in a new tab)

  8. A parametric analysis of three models for direct delivery by a Naval supply center to a Naval air rework facility

    … which were studies included the ratio of delay cost to delivery cost and the probability of a repair part being demanded by a component undergoing repair. The decision variables were the time between deliveries for scheduled deliveries and the number of units of an item delivered for …

    nps Repository record for A parametric analysis of three models for direct delivery by a Naval supply center to a Naval air rework facility (opens in a new tab)

  9. The multi-customer local delivery problem and the siting of repair parts inventories.

    … function was total expected transportation and delay costs per day. In the deterministic case the total cost curve was discontinuous and the optimal delivery policy could only be determined by exhaustive enumeration. A computer simulation model was needed for the random demand case. The …

    nps Repository record for The multi-customer local delivery problem and the siting of repair parts inventories. (opens in a new tab)

  10. Routing algorithms for field-programmable gate arrays

    … and routing structures provide low manufacturing cost and fast time-to-market implementation solutions to the users. However, the routing delay due to their inherent routing structure has been one of the biggest bottlenecks of their speed performance. As the VLSI fabrication feature size is shrunk …

    texas Repository record for Routing algorithms for field-programmable gate arrays (opens in a new tab)

  11. CRUISER MODERNIZATION: AN ORGANIZATIONAL KNOWLEDGE CAPTURE

    … insufficient knowledge transfer contributed to cost growth, schedule delay, rework, and delivery of non-operational capability. The background is the Navy’s cruiser modernization effort where compressed schedules, limited shipyard capacity, firm-fixed-price contracting pressures, and fragmented …

    nps Repository record for CRUISER MODERNIZATION: AN ORGANIZATIONAL KNOWLEDGE CAPTURE (opens in a new tab)

  12. Increasing Railway Efficiency and Capacity Through Improved Operations, Control and Planning

    … possible expansion options along with their cost and capacity effects; (2) an ""Investment Selection Model"" that determines which portions of the network (at the subdivision level) need to be upgraded with what kind of capacity improvement options; and (3) an ""Impact Analysis Module"" that …

    uiuc Repository record for Increasing Railway Efficiency and Capacity Through Improved Operations, Control and Planning (opens in a new tab)

  13. Identifying, anticipating, and mitigating freight bottlenecks on Alabama interstates

    … of the bottlenecks identified were assigned a cost value for the delay that it causes in 2006 as well as in 2025 and 2040. This type of information is useful to planners when they are selecting sections of interstate highways for upgrade. Similarly, projections of delay cost were calculated for …

    alabama Repository record for Identifying, anticipating, and mitigating freight bottlenecks on Alabama interstates (opens in a new tab)

  14. Decentralized Cryptocurrency Exchange A Proof-of-Concept based on Hashed Timelock Contracts

    … and protocol based on three parameters - delay, cost and trading pairs. The protocol is proven to be a possible alternative to the solutions offered today. The prototype displays a proof-of-concept of a decentralized platform that implements this protocol.

    chalmers Repository record for Decentralized Cryptocurrency Exchange A Proof-of-Concept based on Hashed Timelock Contracts (opens in a new tab)

  15. Delay Averse Crew Pairing Optimization

    … scheduling is particularly important, as crew costs are the second-largest expense in airline operations. In practice, delays are common and can cause major disruptions to crew schedules. Most crew pairing models are deterministic and aim to minimize planned costs. However, they often ignore …

    waterloo Repository record for Delay Averse Crew Pairing Optimization (opens in a new tab)

  16. Strategic development of transport systems: a study of the physical constraints on planning processes

    … policy support and accurate forecasting. Delay, cost escalation and abandonment of projects often result if these conditions are not present. In Part One the physical characteristics of infrastructure are identified as a major constraint on planning processes. The extent to which …

    aston Download PDF for Strategic development of transport systems: a study of the physical constraints on planning processes (opens in a new tab)

  17. British Columbia parks and mines in conflict : an evaluation of resolution processes

    … criteria for efficiency are developed: time and delay; cost; capacity for technical issues; opportunity for participation; and flexibility of outcomes. Examples of conflict dialogue illustrate cognitive, value, interest and behavioral conflict in the parks / mines situation with the aim that the …

    ubc Repository record for British Columbia parks and mines in conflict : an evaluation of resolution processes (opens in a new tab) Download PDF for British Columbia parks and mines in conflict : an evaluation of resolution processes (opens in a new tab)

  18. Optimizing On-Street Parking Supply with Analytical Models

    … social optimum which equals revenue minus driver costs and externality costs. The costs are parking search cost, traffic delay cost due to parking maneuver in and out of parking spots, and traffic delay cost due to double parking. The optimal results from case studies demonstrate how the arrival …

    portland-state Repository record for Optimizing On-Street Parking Supply with Analytical Models (opens in a new tab)

  19. Freeway Workzone Capacity and Associated Economic Concepts

    … time for lane closures to minimize the user delays while providing sufficient time for contractors to achieve the desired productivity and quality of work. There are different models, computer Software and wide variety of studies to evaluate and estimate the Workzone Capacity and associated …

    waterloo Repository record for Freeway Workzone Capacity and Associated Economic Concepts (opens in a new tab)

  20. Maintenance scheduling and inventory control policy in aviation industry : An integrated framework.

    Airlines seek to minimise operating costs, in all aspect of business areas. Some of these areas are the aircraft maintenance and inventory control policies associated.Maintenance is one of the essential operations in aviation industry. Any shortcoming in maintenance causes reducing in the income …

    sheffield-hallam Download PDF for Maintenance scheduling and inventory control policy in aviation industry : An integrated framework. (opens in a new tab)

Page 1 of 3