Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 34 for “"delivery date"”.
-
Required Delivery Date (RDD), an alternative to Procurement Adminisistrative [i.e. Administrative] Lead Time (PALT)?
… to measure procurement effectiveness. Required Delivery Date (RDD) is one measure that has been proposed as a replacement or addition to PALT. A survey of 62 procurement professionals in the NFCS was conducted in order to gauge the reaction to the proposed use of RDD. Respondents indicated that …
-
Prenatal Education and Postpartum Support: Influence on Maternal Self-Efficacy and Breastfeeding Rates
… using an infant mannequin one week prior to her delivery date. Participant was also provided with telephonic postpartum support on a weekly basis for two weeks postpartum. Results: Maternal self-efficacy did improve after the intervention as evidenced through the pre-and post-survey scores. Two …
-
Pattern recognition in the Early Warning generation process
… created any time there is a change in expected delivery. Every day, a huge amount of Early Warnings is generated. The amount of data makes it difficult to evaluate and predict changes. A recognition of patterns in Early Warnings could support the planning process and also reduce uncertainty or …
-
ANALYZING CONTRACT PERFORMANCE AT DEFENSE LOGISTICS AGENCY
… readiness. The DOD faces challenges with on-time delivery rates, a direct impact to material readiness for operational requirements and DOD’s ability to remain relevant. This research explores potential relationships between Contract Value, Contract Quantity, and Awarding Office and their effects …
-
An examination of the Navy's supply system support of Naval shipyards
… to buy and issue material to meet the Required Delivery Date (RDD). Shipyard planning activities' material forecasting procedures and the entire requisition process were examined. A review was also conducted of efforts at the Ships Parts Control Center (SPCC) to ensure industrial requisitions …
-
Improving effectiveness at regional repair centers through simulation and customer satisfaction measurements
… pump TATs and provide a more accurate promised delivery date (PDD).
-
Selection of an optimal set of assembly part delivery dates in a stochastic assembly system
… variable is the prescribed assembly part delivery date. The model is particularly suitable for application in low volume assembly lines, where products are manufactured in discrete batches.
-
DLA stock location policy |ba case study of high priority requisitions from NADEP, North Island
… the Department of Defense (DoD) has consolidated the physical distribution functions for wholesale consumable materiel under the management of the Defense Logistics Agency (DLA) and recommended that current DLA stock location policies be reviewed. This thesis examines certain aspects of …
-
Investigating the Factors Responsible for the Material Delivery Time Variance in the Construction Supply Chain of Prefabricated Products
… industry to change the scheduled material delivery date too often, asking how reliable is the material order variability? How does the system react to that variability? What are the reasons behind that order variability? This research investigates the material delivery order reliability in …
-
Using Building Information Modeling (BIM) and the Last Planner System (LPS) to Reduce Construction Process Delay
… have an effect on project duration, scheduled delivery date, as well as the overhead cost of the project. This study investigated the problem of delays in construction projects. The research focused on the combination of Building Information Modeling (BIM) and Last Planner System (LPS) together …
-
Managing Supply for Construction Project with Uncertain Starting Date
… the project may not be needed on the promised date, however, pursuing the supplier for new delivery date may not be easy and without risk. Accepting the delivery before the project commencement date will be again a costly option because of the high holding cost. In this thesis, we present two …
-
Capacity auctions for electricity
… capacity available for generation at a future delivery date. The auctions can be classified as multi-unit uniform price auctions, though price is set according to a demand curve rather than by participants' bids. We find closed-form solutions for the optimal bids as a function of cost, study …
-
Theory of Constraints Project Management in A Manufacturing Environment
… recovery to complete projects on the promised delivery date and finish within the planned budget. The solutions that were derived from Mr. Goldratt's TOC Project Management style is expanded and combined with new risk management techniques to determine the optimal solutions for project schedule …
-
The relationship between selected endocrine and metabolic factors and suckling aggressiveness in Brown Swiss and Holstein dairy calves
… approximately 0 to 4 d prior to their estimated delivery date. Upon delivery, blood samples were collected from calves at birth (mean sampling time was 25.00 y 15.77 minutes after umbilical cord rupture), pre-suckling (mean sampling time was 79.00 y 61.79 minutes after umbilical cord rupture), 5 …
-
Machine learning for vehicle concept candidate population & verification
… which are seldom used after the initial project delivery date. Measurements collected in VCC’s wind tunnels are the main source of data for this thesis but the open-source script based method can be used on other type of data from other disciplines. A possible outcome of the thesis might be …
-
Applied time series analysis for forecasting process cycle times and process yields in the semiconductor manufacturing industry.
… in the semiconductor industry. Meeting delivery date is important to ensure customer satisfaction and maintain momentum between manufacturing divisions. Two major concerns are to produce the right quantity of ICs in the expected period of time. Yield and cycle time are two critical …
-
Minimal lead time quotation under service level constraint
… a short lead time. Short lead time and on time delivery are two conflicting objectives. A reasonable balance between these objectives is necessary. The published research works on due date quotation make restrictive assumptions regarding the production process, considering only the production …
-
Implementing and Evaluating an Advanced Bloodborne Pathogen Training for the Department of Campus Recreation at Clemson University. A Mixed Methods Study of Training Effectiveness and Retention
… a pre-training assessment, followed by the delivery of a customized bloodborne pathogen training program. The 25-minute training focused on reviewing adequate blood/body-fluid spill clean-up procedures specific to Clemson University Campus Recreation. After the training, all participants …
-
Agent Based Supply Chain Architecture For Modern Supply Chain Management
… price negotiation, request for quote, earliest delivery date determination, purchase order cancellation etc. Open Applications Integration Specification (OAGIS) based standard Business Object Documents are used for communication amongst agents.
-
The effects of prenatal language stimulation on human cognitive development
… during the last 2 weeks before their expected delivery date. Three days after birth these infants’ heartrates, movements, and states were measured while they were being auditorially stimulated with English and Japanese language sounds to determine their discrimination of the language sounds to …
Page 1 of 2