Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 20 for “"delivery dates"”.
-
Optimal part delivery dates in small lot stochastic assembly systems
… The problem is especially complex when actual delivery and processing times are stochastic in nature, as is the case in small lot manufacturing. In this research a new methodology is developed for determining optimal part delivery dates in stochastic small lot assembly systems. This methodology …
-
Selection of an optimal set of assembly part delivery dates in a stochastic assembly system
… variable is the prescribed assembly part delivery date. The model is particularly suitable for application in low volume assembly lines, where products are manufactured in discrete batches.
-
A Study of the Relationship between the Intensity of Short-Range and Medium-Range Capacity Management and the Effectivenesss of Manufacturing Operations
… standards; (2) priority determination; (3) delivery dates determination; (4) material requirements planning; (5) routing information; (6) capacity utilization; and (7) backlog measurement. Manufacturing effectiveness was indicated by the following variables: (1) delivery dates performance; …
-
ReMoTe: A complete tool to support software process management
… engineering teams with defining their scheduled delivery dates, life-cycle definitions, team hierarchy, and communication. Using the object-oriented approach, ReMoTe can support any software life cycle model. ReMoTe can help manage and control the software process over the Web. It also allows …
-
ReMoTe: A complete tool to support software process management
… engineering teams with defining their scheduled delivery dates, life-cycle definitions, team hierarchy, and communication. Using the object-oriented approach, ReMoTe can support any software life cycle model. ReMoTe can help manage and control the software process over the Web. It also allows …
-
An integer programming approach to long range shipbuilding scheduling.
… and assumptions. The optimization model suggests delivery dates for new ships, based on given budgets and requirements, and accounts for such complexities as the extra costs of building a leadship or of resuming construction after a production break. The model has been formulated with the General …
-
Evaluation of linear-scheduling-based 4D modeling approaches
… explore various construction strategies to meet delivery dates. Using existing tools for large-scale horizontal and vertical projects characterized by significant repetition of components, the lack of ease with which alternative strategies can be formulated and evaluated precludes meaningful …
-
Transition to a focused factory of the future : a case study of an organization's cultural change
… resulting from machine vendors not meeting their delivery dates.3. Time pressures resulting from deadlines administered by the organization's customer.4. Substantial quality problems experienced from a dependence on a single casting vendor.There is a critical need for frequent communications …
-
Improving Supplier Delivery Precision Through an OTIF KPI and Root Cause Analysis: A Case Study at Wellspect
This study investigates how supplier delivery precision for inbound logistics can be measured and improved through an OTIF KPI. The research was conducted as a case study at Wellspect, a medical technology company, with the aim of increasing the visibility of delivery deviations and improve the …
-
Capacity Planning in a Discrete Item Manufacturing Environment
… the system with their associated quantities and delivery dates. The system has its own data base management component which is used in creating, updating, and reviewing the data base contents. The capacity planning algorithm uses information retrieved from the data base, and the user’s input …
-
Dynamic Pricing and Scheduling for the Coordination of a One-of-a-kind Production Supply Chain
… computes the optimal freight rates for different delivery dates incorporating the 3PL provider's current holding cost and available transportation capacity. We develop an adjusted multinomial logit (MNL) function to predict customer choices so that our SNLP model can obtain near optimal freight …
-
Pattern recognition in the Early Warning generation process
… created any time there is a change in expected delivery. Every day, a huge amount of Early Warnings is generated. The amount of data makes it difficult to evaluate and predict changes. A recognition of patterns in Early Warnings could support the planning process and also reduce uncertainty or …
-
Mitigating Disruption Risks in Supply Chain Financing and Railway Transportation
… further suggests that negotiations extending delivery dates can significantly diminish post-disruption costs. Finally, Chapter 5 summarizes the primary contributions of this research, laying the groundwork for prospective studies in this domain.
-
Operations-Oriented Master Planning and Scheduling for Supply Chain Management in Panelized Construction
… supply chain operations to meet project delivery dates while managing shared resources under dynamic conditions. The system identifies optimal scheduling parameters, including project priorities and resource quantities, to improve supply chain performance in terms of makespan and cost. A …
-
Effects of Supplemental Trace Minerals as Amino Acid Complexed or Inorganic Sources for Beef Cattle from Receiving through Finishing
… crossbred beef heifer calves arriving on 3 delivery dates were used in a 42-day receiving trial. Treatments consisted of supplemental zinc (360 mg/d), copper (125 mg/d), manganese (200 mg/d), and cobalt (12 mg/d) from complexed (Availa-4, Zinpro Corp. Eden Prairie, MN) or inorganic sources …
-
Studie průběhu nákupní činnosti ve vybraném podniku
Bakalářská práce se zabývá problematikou dodavatelsko-odběratelských vztahů. Konkrétně je zaměřena na řízení kvality dodavatelů z pohledu konkrétního odběratelského podniku. Práce obsahuje analýzu současného stavu a návrh změn v oblasti vztahů s dodavateli, které mají za cíl zvýšení dodavatelské …
-
Automated Dynamic Scheduling and Factory Layout Optimization for Off-Site Construction
… and quality, and reduced costs and project delivery times. Despite these benefits, production managers continue to face significant challenges due to inefficiencies and imbalances in the production line. These imbalances arise from several key factors: (i) unrealistic allocation of workers …
-
Advanced methods and models in uncertainty for the order promising process in supply chain characterized by the lack of homogeneity in product
… to the acceptance/rejection decision, and to set delivery dates. For supply chains affected by the LHP, the OPP must consider the homogeneity as another requirement in the answer to the orders. Besides, due to the LHP inherent uncertainty, discrepancies between the real and planned homogeneous …
-
Tvorba průběhu zakázky firmou se zaměřením na splnění dodacích termínů
Předmětem mé bakalářské práce je analýza procesu zakázky ve společnosti Fosfa. V první části se zabýváme teoretickými východisky zabývajícími se charakteristikou výrobního podniku, procesem zakázky a logistikou. Druhá část je pak věnována představení společnosti Fosfa a výrobního procesu. V závěru …
-
Tvorba průběhu zakázky vybraného produktu
Bakalářská práce se zabývá průběhem zakázky společností. V první části jsou uvedena teoretická východiska práce. Ve druhé části je představena společnost, je zde provedena analýza podniku a průběhu zakázky. Ve třetí části jsou stanoveny návrhy na zlepšení průběhu zakázky ve výrobním procesu …