Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 22 for “"design and construction phase"”.

  1. A Case Study of the Use of BIM and Construction Operations Building Information Exchange (COBie) for Facility Management

    … the use of Building Information Modeling (BIM) and COBie for Facility Management on three projects where these concepts were used. Factors which affect these concepts are identified through a literature review. The study is divided into the sections of Responsibility for database formulation, …

    tamu Repository record for A Case Study of the Use of BIM and Construction Operations Building Information Exchange (COBie) for Facility Management (opens in a new tab)

  2. The dilemma of ecology in architecture and the possible ways out

    Ecology is an important and unique part of architecture. Nowadays, more and more buildings are intended to prove their superiority in sustainability, however, still very few of them are derived from the idea of sustainability and ecology.1 Instead considerations of aesthetics, urban relation, …

    cornell Repository record for The dilemma of ecology in architecture and the possible ways out (opens in a new tab)

  3. Ανάπτυξη μεθοδολογίας για την ολοκληρωμένη περιβαλλοντική αξιολόγηση κτιρίων στην Ελλάδα

    … focusing in particular, on energy consumption and the use of construction materials. The suggested methodology is based on multicriteria analysis and on the structure of leading Rating Systems, especially LEED and BREEAM. Existing and new buildings are examined using a holistic approach that …

    greece Repository record for Ανάπτυξη μεθοδολογίας για την ολοκληρωμένη περιβαλλοντική αξιολόγηση κτιρίων στην Ελλάδα (opens in a new tab)

  4. As-built information Essential information every facility manager is looking for

    … criticized for poor information recording and sharing and the fragmented use of information. These problematic features are greatly affecting the transfer of information produced in the design and construction phase which should be communicated to the facility management phase. By and …

    chalmers Repository record for As-built information Essential information every facility manager is looking for (opens in a new tab)

  5. Tacit knowledge integration within the traditional construction procurement system

    … Tacit knowledge management is more important in construction industry where common issues exist between the design and construction phase. However, most knowledge is embedded in the minds of professions and based on experiences they achieved from project. The successful completion of a project …

    salford Download PDF for Tacit knowledge integration within the traditional construction procurement system (opens in a new tab)

  6. Perceived Value of Building Information Modeling in Facilities Operations and Maintenance

    Conventional practices and inefficiencies in accessing relevant operation and maintenance (O&M) information are major issues to maintain facilities for their intended purpose. The need to have access to accurate information efficiently is critical to operate and maintain a facility. Building …

    unm Repository record for Perceived Value of Building Information Modeling in Facilities Operations and Maintenance (opens in a new tab)

  7. Construction Digital Twin: From Early Design to Project Delivery

    The construction industry is currently facing the change of digitalization. The fragmented nature of construction projects is challenging the collaboration and innovation needed for the industry and society to benefit from the digitalization. The purpose of this research is to investigate the …

    chalmers Repository record for Construction Digital Twin: From Early Design to Project Delivery (opens in a new tab)

  8. Modeling senior government contribution strategies for funding public infrastructure projects

    … public transit, crumbling bridges, old water and sewage lines, and congested roads require major investments. The capital investment and the availability and quality of services provided by public infrastructure are critical in enhancing the Canadian quality of life and economic growth and …

    ubc Repository record for Modeling senior government contribution strategies for funding public infrastructure projects (opens in a new tab) Download PDF for Modeling senior government contribution strategies for funding public infrastructure projects (opens in a new tab)

  9. Retroanálise da ruptura do talude de montante da Barragem do Açu no final do período construtivo

    … importance in the Northeast, mainly in Rio Grande do Norte state. It is the largest dam of the state and has gained prominence in national and international literature with the slice of the upstream slope at the end of its construction period. In cases of failure, back analysis is a reliable …

    brazil-ufrn Repository record for Retroanálise da ruptura do talude de montante da Barragem do Açu no final do período construtivo (opens in a new tab)

  10. Mechanical design of gear train efficiency test rig - Efficiency evaluation of geared front attachments in industrial tightening tools

    … a test rig where they can perform gear accuracy and efficiency tests with the aim of potentially enhancing the performance of their Geared Front Attachment (GFA) tool tightening solutions. The GFA extension consist of several gears positioned on a row making it possible to perform tightening’s in …

    chalmers Repository record for Mechanical design of gear train efficiency test rig - Efficiency evaluation of geared front attachments in industrial tightening tools (opens in a new tab)

  11. Research on Bridging the Information Gap of BIM of interoperability and integration in Facilities Management

    … Modeling (BIM) is a combination of technologies and human work practice in handling geometric and non-geometric information management over the whole life cycle of the construction project. BIM has already matured for implementation in the design and construction phase of a construction project. …

    chalmers Repository record for Research on Bridging the Information Gap of BIM of interoperability and integration in Facilities Management (opens in a new tab)

  12. Evalutation of the Life Cycle Costs and Performance of Geotechnical and Stormwater Infrastructure

    As urbanization accelerates and global population increases, the necessity and importance of highway infrastructure has rapidly increased. Infrastructure serves to improve the quality of life, supports community needs, and increases economic benefits through increased access to resources. However, …

    gatech Repository record for Evalutation of the Life Cycle Costs and Performance of Geotechnical and Stormwater Infrastructure (opens in a new tab)

  13. Maximizing economic returns for large, publicly funded road infrastructure investments through improved economic, engineering and construction information management

    … countries from corruption, poor quality work, and cost and time overruns. This is confirmed, to various degrees, by recent field experience in developing countries in the delivery of roads projects. Incentives of both the donor agency and the road agency have contributed to this …

    ets-quebec Download PDF for Maximizing economic returns for large, publicly funded road infrastructure investments through improved economic, engineering and construction information management (opens in a new tab)

  14. Design and Analysis of a Voice Band QPSK Modem

    The objective of this paper is to design and construct a modem using the Quadrature Phase Shift Key digital modulation technique. The modem is designed to transmit information over a telephone line at the rate of 1200 bits per second subject to noise and imperfect channel response in the form of …

    ucf Repository record for Design and Analysis of a Voice Band QPSK Modem (opens in a new tab)

  15. Phase-Locked Loop Based Oscillator Phase Noise Measurement Technique

    … (RF) systems. The generation of stable carrier and clock frequencies is necessary at both the transmitter and receiver ends of a communication system. Phase noise is the parameter used to characterize an oscillator frequency stability. This thesis introduces a phase noise measurement technique …

    ucf Repository record for Phase-Locked Loop Based Oscillator Phase Noise Measurement Technique (opens in a new tab)

  16. UHF Frequency Synthesizer

    This thesis describes the design, implementation and testing of a UHF frequency synthesizer. The synthesizer is designed to provide a sine wave output programmable from 400 MHz to 500 MHz in 0.1 MHz increments. The synthesis technique utilized is Digital Coherent Indirect Synthesis. This technique …

    ucf Repository record for UHF Frequency Synthesizer (opens in a new tab)

  17. Numerically Controlled Oscillator Based Digital Phase Locked Loop Design and Simulatiohn for Carrier Recovery Application

    … describes a simulation tool that can be used to design and evaluate digital phase lock loops. The simulation model is based on carrier recovery applications which uses a type II loop in conjunction with the multiplying phase detector. Models for the loop components are developed which include …

    ucf Repository record for Numerically Controlled Oscillator Based Digital Phase Locked Loop Design and Simulatiohn for Carrier Recovery Application (opens in a new tab)

Page 1 of 2