  1. Setting Target Rates for Construction Activity Analysis Categories

    … of decreasing them and thereby increasing the direct work rate. A preceding study validated this approach, however it had two limitations. No reevaluation was conducted on projects in Canada by the authors, and not enough resources or data were available to understand behaviour of the activity …

    waterloo Repository record for Setting Target Rates for Construction Activity Analysis Categories (opens in a new tab)

  2. Activity Analysis for Continuous Productivity Improvement in Construction

    … comprehensive understanding of the activities of workers onsite. For project success, it is important that workers are spending the majority of their time installing materials which advance the project. This material installation time is known in the construction industry as “direct-work” or “tool …

    waterloo Repository record for Activity Analysis for Continuous Productivity Improvement in Construction (opens in a new tab)

  3. Extension of activity analysis methodology to maintenance, shutdown, and turnarounds in petrochemical facilities

    … helps them to communicate improvement strategies with each other and within their organization beyond construction leading into maintenance and shutdown turnarounds. Activity Analysis is a productivity assessment and improvement method developed by the Construction Industry Institute …

    texas Repository record for Extension of activity analysis methodology to maintenance, shutdown, and turnarounds in petrochemical facilities (opens in a new tab)